64 East 86th Street, Manhattan
Co-op · 38 units · built c. 1917 · Block 1497, Lot 46.
Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.
Building permits
- Alteration, filed Dec 19, 2025, estimated cost $138K, described as “Plumbing work at apt. #14AB at the 14th Floor indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application”
- Alteration, filed Dec 19, 2025, estimated cost $99K, described as “General Construction to renovate existing apt. #14AB at the 14th floor indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application.”
- Alteration, filed Oct 14, 2024, estimated cost $20K, described as “Mechanical work in conjunction with the ot #M01123097-I1”
- Alteration, filed Oct 11, 2024, estimated cost $24K, described as “Plumbing work in conjunction with the OT #M01123097-I1”
- Alteration, filed Oct 11, 2024, estimated cost $113K, described as “Interior renovations on the 13th floor apartment #13b -all work as per plans submitted. Plumbing and mechanical filed in conjunction under separate applications. No change to use, egress or occupancy.”
- Alteration, filed Aug 22, 2024, estimated cost $229K, described as “Renovation of apartment 10AB consisting of interior demolition and construction involving partitions, doors, and finishes as shown herewith. No changes to egress, occupancy or use.”
- Alteration, filed May 29, 2024, estimated cost $10K, described as “Installation of HVAC system to include but not limited to new condenser and associated piping.”
- Alteration, filed Jul 3, 2023
- Alteration, filed Jul 3, 2023, estimated cost $10K, described as “Application filed to supersede alt 1 # 101472354 for combination of apts. 10A & 10B on 10TH floor. Interior demolition, erect partitions,and create openings for thru-wall a/c units. This application filed for administrative purpose to…”
- Alteration, filed Aug 30, 2022, estimated cost $1K, described as “Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy.”
- Alteration, filed Jul 21, 2022, estimated cost $500K, described as “Combination of apts 4B and 5B filed in conjunction with DOB now pl and st. No change to use, occupancy or egress.”
- Alteration, filed Jun 2, 2022, estimated cost $189K, described as “Work includes replacement of the roofing membrane above the existing concrete deck to remain at main roof and bulkheads. Installation of new insulation and flashings at select locations as shown on drawings and as specified.”
- Alteration, filed Mar 21, 2022, estimated cost $20K, described as “Installation of plumbing fixtures as per plans filed herewith, No change to use, egress or occupancy”
- Alteration, filed Mar 21, 2022, estimated cost $89K, described as “12C: Interior renovations consisting of partitions and finishes along with ventilation work as per plans filed herewith.”
- Alteration, filed Jul 29, 2021, estimated cost $50K, described as “Installation and modification of plumbing fixtures at existing apartment 8B on floor 008. Plumbing work. There is to be no change of use, occupancy, or egress.”
- Alteration, filed Jul 28, 2021, estimated cost $301K, described as “Renovation of existing apartment 8B on floor 008. Architectural work. There is to be no change of use, occupancy, or egress.”
- Alteration, filed Jul 7, 2021, estimated cost $88K, described as “Application for general construction alteration work at apt 13A to include updated interior finishes and fixtures as indicated per plans. Plumbing laa will be filed by plumber after issuance of gc permit. No change in use, egress, bulk or…”
Building history
- Alteration, filed May 1, 2017, permit issued - entire job/work, units 43 to 42, described as “Interior renovation and conversion of 1 apartment to be combined with existing doctor's office to create 1 ambulatory diagnostic and treatment health care facility (use group 4A, use allowed as-of-right in R10 district).”
- Major Renovation — Conversion, filed Nov 12, 1996, permit issued - partial job, 38 units added, 14 stories, described as “Combine apts. 10A & 10B on 10TH floor. Interior demolition, erect partitions, install sanitary facilities and create openings for thru-wall a/c units.”
- Alteration, filed Dec 23, 1992, signed off Aug 2, 1995, described as “Combining of apts. "12A" & "12B" into 1 apt.; reconfig. Some non-bearing partitions; creating new h.c. Bathroom a s per LL57/87; installing thru wall a heating units; and some misc. Plumbing w ork. There will be no change to egres…”
- Major Renovation — Conversion, filed Nov 7, 1991, signed off Aug 2, 1995, 24 units added, 14 stories, described as “Propose to combine apt 7C & 7D on 7TH floor, remove existing kitchen and cap all lines as per code, refurbish existing bathroom and install new fixtu es as shown on drawings filed herewith.”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $5,972,400
- 2026–27 Tax
- $588,031
- Market value (city estimate)
- $13,272,000
- Taxable value
- $5,575,190
- Assessed land
- $1,152,000
- Assessed improvements
- $4,820,400
Tax breaks
- Co-op and Condo Abatement, with no end date, a $104,958 credit this tax year.
Zoning
R10: floor area ratio 9.19 built, 10.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Aug 11, 2026: $920,000
- Jun 24, 2026: $2,500,000
- Jan 27, 2026: $3,900,000
- Jun 23, 2025: $2,800,000
- Feb 21, 2024: $2,430,000
- Jun 16, 2022: $1,300,000
- Sep 9, 2021: $1,660,000
- Feb 18, 2021: $1,300,000
- Feb 1, 2021: $400,324
- Mar 5, 2020: $1,525,000, Apt 5C
Open-market sales since 2016, from the Department of Finance’s sales files.