# 1050 5th Avenue, Manhattan

Co-op · 90 units · built 1958 · Block 1498, Lot 1.

On Umarelli: https://umarelli.org/nyc/1014980001/1050-5-avenue

More construction in Upper East Side: https://umarelli.org/nyc/manhattan/upper-east-side.md

Every lot on block 1498: https://umarelli.org/nyc/manhattan/1498.md

## Building permits

- Alteration, filed Jun 6, 2026, described as “Material hoist. For material only. No work from hoist.”
- Alteration, filed Apr 30, 2026, estimated cost $47K, described as “Minor renovations in apartment 4D (4TH floor) per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Mar 27, 2026, estimated cost $9K, described as “Bathroom renovation consisting of replacement in kind of existing interior finishes and fixtures within the existing bathroom footprint. Work is non-structural. No change to use, occupancy, egress, floor area, or zoning.”
- Alteration, filed Feb 18, 2026, estimated cost $230K, described as “Interior renovation of apartment 17D on the 17TH floor. No change in use, egress, or occupancy.”
- Alteration, filed Aug 6, 2025, estimated cost $19K, described as “Temporary shoring as per plans filed. No change in occupancy, use or egress.”
- Alteration, filed Dec 16, 2024, estimated cost $228K, described as “Proposed interior non-structural interior modification including the modification of the kitchen, bathrooms, and finishes throughout. No change in use , occupancy or egress is proposed in this application.”
- Alteration, filed Dec 4, 2024, estimated cost $160K, described as “Interior renovation in apt 15D filed in conjunction with DOB now pl. No change to use, occupancy or egress.”
- Alteration, filed Jun 24, 2024, estimated cost $200K, described as “Filing herewith plans showing partial Mechanical work inside Apt 18BC, on the 17th floor as per plans submitted. No change in use, Egress or Occupancy under this application.”
- Alteration, filed Jun 11, 2024, estimated cost $90K, described as “Filing herewith plans showing partial Plumbing work inside Apt 18BC, on the 17th floor as per plans submitted. No change in use, Egress or Occupancy under this application.”
- Alteration, filed Jun 5, 2024, estimated cost $1.1M, described as “Filing herewith plans showing interior renovation work inside Apt 18BC, on the 17th floor as per plans submitted. No change in use, Egress or Occupancy under this application.”
- Alteration, filed May 14, 2024, estimated cost $376K, described as “Filing interior alteration to apt. 6F. Work includes renovation of existing bathrooms & kitchen, new interior finishes, window replacement, new lighting and power upgrade per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Mar 29, 2024, estimated cost $59K, described as “Filing for interior renovation of apt. 2B-C - work to include removal of interior non-load bearing partitions and finishes. Plumbing work filed subsequently in DOB NOW. No change to use, egress, or occupancy.”
- Alteration, filed Feb 5, 2024, described as “Installation of suspended scaffold for facade inspection/ repair SR23/1196”
- Alteration, filed Jul 3, 2023, estimated cost $16K, described as “Proposed plumbing work in connection with the interior renovation of apartment 4B (4TH floor) per plans filed herewith.no change in use, egress or occupancy.”
- Alteration, filed Feb 27, 2023, estimated cost $15K, described as “Remove/install minor partitions and finishes in existing apt 18ABC. No change in occupancy, use or egress. Plumbing filed separately.”
- Alteration, filed Feb 13, 2023, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Feb 13, 2023, estimated cost $10K, described as “Installation of temporary material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 24, 2022, estimated cost $1.3M, described as “Facade and terrace restorations as per plans filed herewith. No change in occupancy, use or egress.”
- Alteration, filed Oct 24, 2022, estimated cost $24K, described as “Interior renovation of apartment as per plans”
- Alteration, filed Oct 24, 2022, estimated cost $200K, described as “Interior renovation of apartment as per plans”
- Alteration, filed Jun 10, 2022, estimated cost $264K, described as “Filing herewith for the installation and modifications to plumbing systems”
- Alteration, filed Jun 2, 2022, estimated cost $1.1M, described as “Filing herewith for the renovation and combination of apts 11D, E,& F. Modifications to existing plumbing systems with the installation of new fixtures. Installation of new mechanical systems& associated duct piping.”
- Alteration, filed May 20, 2022, estimated cost $150K, described as “Interior renovation to apartment #12E on the 012 floor of existing building. Minor partition work, all as per plan. No change in sgress, use or occupancy under this application.”
- Alteration, filed May 20, 2022, estimated cost $15K, described as “Plumbing work at apartment #12E on the -12 floor.”
- Alteration, filed May 4, 2022, estimated cost $37K, described as “Structural design related to window openings & apartment renovation work filed under BIS job #123660733. No change in occupancy, use or egress.”

18 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1014980001/1050-5-avenue.

## Property taxes

- Assessment: $26,113,950
- 2026–27 tax: $2,802,462
- Market value (city estimate): $58,031,000
- Taxable value: $25,347,532
- Assessed land: $3,838,500
- Assessed improvements: $22,275,450

## Tax breaks

- Co-op and condo abatement, with no end date, a $351,415 credit this tax year.

## Zoning

R10: floor area ratio 13.17 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Sep 28, 2026: $3,300,000
- Jun 1, 2026: $3,625,000
- Mar 4, 2026: $3,500,000
- Nov 24, 2025: $5,700,000
- Oct 31, 2025: $13,000,000
- Oct 1, 2025: $2,900,000
- Jul 29, 2025: $2,300,000
- May 21, 2025: $1,775,000
- Dec 12, 2024: $2,000,000
- Aug 7, 2024: $2,840,000

The 10 most recent of 40 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of Expanded Carnegie Hill Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
