1115 5th Avenue, Manhattan
Co-op · 41 units · built c. 1926 · Block 1504, Lot 69.
Building permits
- Alteration, filed Jul 10, 2026, estimated cost $600K, described as “Architectural scope associated with the apartment PH.A renovation. No change of use, egress or occupancy.”
- Alteration, filed Jun 24, 2025, estimated cost $40K, described as “Rear wall openings for window enlargements and seelve penetrations in apts for new HVAC. No change to use , occupancy or egress.”
- Alteration, filed Jun 23, 2025, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Jun 23, 2025, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of 2022 the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Jun 10, 2025, described as “Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.”
- Alteration, filed May 8, 2025, estimated cost $165K, described as “Replaced , relocate ,removed and install new plumbing fixtures , in conjunction with the renovation with the apartment #5B , on the 5TH floor. All as per plan. No change in use egress or occupancy.”
- Alteration, filed May 7, 2025, estimated cost $30K, described as “Structural support work in conjunction with the interior renovation of existing apartment #5B. . Work include,repair required for poor slabs, exterior opening for exhust louvers. Support for midify kitchen window. HVAC unit. All as per…”
- Alteration, filed May 6, 2025, estimated cost $175K, described as “Upgrade HVAC system to apartment 5B on the 5TH floor . Work include install new HVAC sytem , piping, duct work hung fan coil units from the ceiling ,louvers and humidifiers , all as per plan.”
- Alteration, filed Apr 29, 2025, estimated cost $1.1M, described as “Interior renovation to existing apt # 5B ON THE 5TH FL. Construct new partitions and finishes. windows to be replace by bothers . No change in use, egress & occupancy”
- Alteration, filed Mar 13, 2025, estimated cost $1.0M, described as “Architectural scope associated with the renovation of an exterior terrace of apartment PH.A. No change of use, egress or occupancy.”
- Alteration, filed Feb 25, 2025, estimated cost $40K, described as “Limited to interior demolition to existing apt # 5B ON THE 5TH FL. Remove non-bearing partitions & interior finishes, removal of all windows and installation of temporary window protection. windows to be replace by bothers . no change in…”
- Alteration, filed Jan 13, 2025, estimated cost $100K, described as “Non structural "demo" to include removal of millwork and non bearing partitions to prep for general construction filed under permitted M00769279-I1 as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Dec 20, 2024, estimated cost $235K, described as “Structural scope associated with the interior dunnage and reinforcing of the existing structure. No change of use, egress or occupancy.”
- Alteration, filed Dec 13, 2024, estimated cost $650K, described as “Apartment renovation 10 C. No change to occupancy, use or egress under this application.”
- Alteration, filed Sep 18, 2024, estimated cost $150K, described as “Interior partial demolition; Removal of windows of apartment 10C. no change to occupancy use or egress under this application.”
- Alteration, filed Nov 30, 2023, estimated cost $30K, described as “Replace domestic water risers in apt 15A . No change to use, occupancy or egress.”
- Alteration, filed Apr 13, 2023, estimated cost $5K, described as “Installation of pipe scaffolding as per plans. Pipe scaffold shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Dec 15, 2022, estimated cost $174K, described as “Mechanical work to unit 9B as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Dec 8, 2022, estimated cost $100K, described as “Plumbing work to unit 9B as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Nov 14, 2022, estimated cost $80K, described as “Installation of new HVAC System in conjunction with construction application as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Nov 1, 2022, estimated cost $54K, described as “Installation of plumbing fixtures and associated piping in conjunction with general construction as per plans filed herewith. No change to use, egress or occpancy”
- Alteration, filed Oct 28, 2022, estimated cost $332K, described as “Application is filed for interior renovation including removal and installation of non bearing partitions and related finishes, and exterior work including masonry opening for new dryer exhaust cap. No change to use, occupancy or egress.”
- Alteration, filed Oct 27, 2022, estimated cost $25K, described as “Build out for unit 9B as per plans filed herewith. no change to use, egress or occupancy.”
- Alteration, filed Sep 26, 2022, estimated cost $50K, described as “Interior removals work on the penthouse floor to include partition, ceiling, and door removals as per plans.”
- Alteration, filed Aug 18, 2022, estimated cost $10K, described as “Interior demolition of non load bearing partitions to unit 9B as per plans filed herewith. No change to use, egress or occupancy.”
14 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $24,460,650
- 2026–27 tax
- $2,484,961
- Market value (city estimate)
- $54,357,000
- Taxable value
- $23,368,480
- Assessed land
- $3,847,500
- Assessed improvements
- $20,613,150
Tax breaks
- Co-op and condo abatement, with no end date, a $421,853 credit this tax year.
Zoning
R10 (part of the lot is R8B): floor area ratio 11.99 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Apr 9, 2026: $812,500
- May 9, 2025: $6,250,000
- Dec 18, 2024: $5,100,000
- Dec 16, 2024: $6,400,000
- Jun 11, 2024: $5,575,000
- Nov 14, 2022: $4,167,000
- Oct 18, 2022: $50,000
- Jul 13, 2022: $5,950,000
- May 12, 2022: $11,500,000
- Feb 18, 2022: $5,747,500
The 10 most recent of 19 open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of Expanded Carnegie Hill Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.