30 East 95th Street, Manhattan
Co-op · 37 units · built c. 1894 · Block 1506, Lot 18.
Building permits
- Alteration, filed Jan 17, 2024, estimated cost $1K, described as “Installation of scaffold for worker access during construction. Scaffold shall comply with nycc 2022 chapter 33 . No change in egress, use, or occupancy.”
- Alteration, filed Jan 17, 2024, estimated cost $1K, described as “Installation of sidewalk shed for pedestrian safety during construction. Sidewalk shed shall comply with nycc 2022 chapter 33 . No change in egress, use, or occupancy.”
- Alteration, filed Nov 7, 2023, estimated cost $237K, described as “General requirements restoration and other facade work as shown on plans submitted herewith. No change in use, egress or occupancy.”
- Alteration, filed Jul 11, 2022, estimated cost $9K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Mar 16, 2022, estimated cost $2K, described as “Plumbing work being filed in conjunction with Alteration number M00675881. No change to use, egress or occupancy.”
- Alteration, filed Mar 16, 2022, estimated cost $7K, described as “Renovation of existing kitchen and remove non load bearing partition. No change to use, egress or occupancy.”
- Alteration, filed Sep 10, 2019, estimated cost $4K, described as “Application filed herewith for new fixtures and fittings to be placed in existing locations in apartment 6D in conjunction with alteration type 2.”
- Alteration, filed Feb 6, 2019, estimated cost $5K, described as “Alteration type 3 - construction equipment - sidewalk-shed proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. No change in use occupancy or egress under this application. Live LOAD300 per square feet.…”
- Alteration, filed Jan 31, 2019, estimated cost $8K, described as “Proposed installation of pipe scaffold for remedial repairs as per plans. No change in use occupancy or egress under this application.”
- Alteration, filed May 2, 2018, estimated cost $15K, described as “Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. No change in use occupancy or egress under this application. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2014 code.”
Property taxes
- Assessment
- $4,356,900
- 2026–27 Tax
- $471,950
- Market value (city estimate)
- $9,682,000
- Taxable value
- $4,173,560
- Assessed land
- $540,000
- Assessed improvements
- $3,816,900
Tax breaks
- Co-op and Condo Abatement, with no end date, a $46,808 credit this tax year.
Zoning
R10: floor area ratio 5.91 built, 10.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Oct 14, 2026: $330,000
- Jan 27, 2026: $293,000
- May 22, 2025: $585,000
- Aug 7, 2024: $415,000
- Sep 8, 2022: $505,000
- Oct 27, 2021: $300,000
- Jan 27, 2021: $580,000
- Feb 5, 2020: $538,584, Apt 6F
- May 1, 2019: $510,000
- Jan 14, 2019: $535,000
The 10 most recent of 13 open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of Expanded Carnegie Hill Historic District (Historic District). 27 Landmarks Preservation Commission permits are on file.