151 East 79th Street, Manhattan
Co-op · 16 units · built c. 1925 · Block 1508, Lot 20.
Building permits
- Alteration, filed Jun 5, 2026, described as “Installation of a suspended scaffold for facade inspection and repair as per plan submitted”
- Alteration, filed Nov 17, 2025, estimated cost $203K, described as “Fire escape restoration and miscellaneous repairs as per plans. No change in use, egress or occupancy.”
- Alteration, filed Nov 13, 2025, estimated cost $11K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Nov 13, 2025, estimated cost $4K, described as “Installation of a temporarily heavy-duty sidewalk shed and shoring per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Aug 12, 2025, estimated cost $8K, described as “Structural scope of work includes removing a load-bearing wall; no change to use, egress, or occupancy”
- Alteration, filed Aug 11, 2025, estimated cost $16K, described as “Full gut renovation of the penthouse unit. Replacement/relocation of plumbing fixtures as shown on proposed floor plans. All plumbing and gas risers are existing to remain. No change to egrss or occupancy.”
- Alteration, filed Aug 8, 2025, estimated cost $15K, described as “Full gut rennovation and mechanical work for penthouse. Installation of new split vrf system, relocation of bath exhaust fan and duct work, and replacement of radiators and branch piping. No change to egrss or occupancy.”
- Alteration, filed Aug 8, 2025, estimated cost $78K, described as “ALT-2 filing to document lawful merger of individual maids rooms. Open Maids Area includes 2-fixture bath and wet bar (no cooking/living). Minor plumbing and structural work submitted under separate filings.. No change to use, egress or…”
- Alteration, filed Jul 30, 2025, estimated cost $189K, described as “Filing to combine two existing apartments to create one larger residential unit in accordancewith tppn #3/97. No change to certificate of occupancy. No change to egress”
- Alteration, filed May 5, 2025, estimated cost $36K, described as “Filing for minor interior renovation of 14TH floor (building floor 15) apartment for plumbing work. No change to use or occupancy.”
- Alteration, filed May 5, 2025, estimated cost $12K, described as “Filing for minor interior renovation of 15TH floor apartment for the perimeter steam heating system limited to new piping,accessories and replacing radiators.. No change to use or occupancy.”
- Alteration, filed Apr 21, 2025, estimated cost $90K, described as “Scope includes renovation of 15th FL unit, demolition of non-load bearing interior partitions, creation of new interior partitions, and replacement of toilets and lavatories. No change in use, egress, or occupancy.”
- Alteration, filed Apr 2, 2025, estimated cost $364K, described as “Herewith file architectural plans for the interior renovation of an apartment on the 11th floor, work to include general construction and plumbing (plumbing to be filed as a subsequent application) No change to use, egress or occupancy”
- Alteration, filed Aug 22, 2023, estimated cost $432K, described as “Renovation of an existing apartment on the 10th floor. Work include non-structural demolition, general construction and new openings.”
- Alteration, filed Apr 21, 2023, estimated cost $10K, described as “Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Apr 15, 2023, estimated cost $3K, described as “Installation of a temporarily Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Apr 14, 2023, estimated cost $13K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Mar 23, 2023, estimated cost $660K, described as “Main and penthouse terrace roof restoration as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 26, 2022, estimated cost $7K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed May 25, 2022, estimated cost $7K, described as “Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Sep 25, 2019, estimated cost $40K, described as “New plumbing work in conjunction with the interior renovation of commercial space. new fixtures as per plans.”
- Alteration, filed Sep 24, 2019, estimated cost $2K, described as “Erect (7) non-illuminated accessory business signs for citymd. Not within view of arterial highway or public park 1/2 acre or more. No change in use, egress or occupancy.”
- Alteration, filed Aug 29, 2019, estimated cost $100K, described as “HVAC and ductwork associated with interior renovation,”
- Alteration, filed Apr 24, 2019, estimated cost $160, described as “Application filed for temporary construction fence.”
- Alteration, filed Aug 11, 2018, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the NYC building code.live load 300PSF.”
Building history
- Alteration, filed Jun 4, 1996, permit issued - partial job, described as “Combine apartments 1A & 2A creating a duplex. Remove flooring, partitions & trim to provide for new opening and stair. Install new stair, trim, new closets & doors as shown on plans filed herewith. Amend certificate of…”
- Alteration, filed Oct 13, 1992, plan exam - approved, described as “Change use from auto sales to bank at basement level (no work to be done under this appl).”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $9,680,400
- 2026–27 Tax
- $922,092
- Market value (city estimate)
- $21,512,000
- Taxable value
- $8,288,090
- Assessed land
- $1,134,000
- Assessed improvements
- $8,546,400
Tax breaks
- Co-op and Condo Abatement, with no end date, a $108,864 credit this tax year.
Zoning
R10A: floor area ratio 12.16 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Jun 29, 2026: $2,999,500
- Sep 5, 2024: $6,500,000
- Feb 9, 2022: $8,000,000
- Jan 13, 2022: $7,425,000
- Jun 5, 2018: $916,477
Open-market sales since 2016, from the Department of Finance’s sales files.