144 East 84th Street, Manhattan
Co-op · 95 units · built 1962 · Block 1512, Lot 52.
Building permits
- Alteration, filed Nov 16, 2026, estimated cost $44K, described as “Removal of (1) existing 7.5-ton gas-fired RTU and installation of (1) new 7.5-ton electric heat pump RTU (RTU-1) with electric heat and economizer on existing roof curb.”
- Alteration, filed Jun 4, 2026, estimated cost $148K, described as “Apartment combination of units 6D and 6E into 6DE, interior renovation with partition walls and finishes. No change in use, egress, or occupancy.”
- Alteration, filed May 20, 2026, estimated cost $24K, described as “Combination of Apartment 10D & 10E. Install and relocate plumbing fixtures. No change of use, egress or occupancy under this application.”
- Alteration, filed May 20, 2026, estimated cost $207K, described as “Combination of Apt 10D & 10E. Interior Renovation and minor partitions. No change of use, egress or occupancy under this application.”
- Alteration, filed Aug 12, 2025, estimated cost $323K, described as “Combination of apts 12C and 12DE under tppn 3/97 filed in conjunction with DOB now pl. No change to use, occupancy or egress.”
- Alteration, filed Mar 4, 2024, described as “Installation of temporary construction fence/enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Aug 1, 2023, estimated cost $10K, described as “Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Mar 15, 2023, estimated cost $17K, described as “Exterior facade repairs including select masonry repairs as shown on drawings and as specified. No change in use, occupancy, or egress.”
- Alteration, filed Aug 8, 2022, estimated cost $6K, described as “Application filed for plumbing removal and modifications on the 10th floor apartment 10G as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Aug 3, 2022, estimated cost $10K, described as “Application is filed for interior renovation of apartment 10G on tenth floor of existing building as per plans submitted. Plumbing work to be submitted as part of separate application by plumber. There will be no change to use, egress or…”
- Alteration, filed Jul 6, 2022, estimated cost $19K, described as “Plumbing work for apts 2D and 2E as per plans filed herewith. General construction work filed under separate DOB now application. No change to egress, use or occupancy.”
- Alteration, filed Jul 6, 2022, estimated cost $153K, described as “Combination of apartments 2D and 2E under tppn 3/97, inclusive of non-load bearing wall changes as per plans filed herewith. Plumbing work filed under separate DOB now application.no change to egress, use or occupancy.”
- Alteration, filed Aug 28, 2019, described as “Pipe scaffold proposed installation of pipe scaffold as per plan. No change in use, egress or occupancy.”
- Alteration, filed Aug 28, 2019, described as “Sidewalk shed proposed installation of sidewalk shed as per plan. No change in use, egress or occupancy.”
Building history
- Major Renovation — Conversion, filed Nov 13, 1997, signed off Sep 2, 1998, 90 units added, 14 stories, described as “Alt.1 is filed to obtain an amended certificate of occupancy. Indicating the combining of two apartmen to create 1. Work includes the eliminat of the east kitchen and the erection of non load bearing partitions.”
- Major Renovation — Conversion, filed May 7, 1997, signed off Aug 28, 1998, 90 units added, 14 stories, described as “There is no work proposed under this app lication. Alt.type i is filed t obtain an amended certificate of occupancy indicating the combining of two (2) apartments to create one (1).”
- Major Renovation — Conversion, filed Sep 1, 1992, permit issued - entire job/work, 46 units added, 14 stories, described as “Combination of apartments 5D & 5E as per drawings.”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $10,785,600
- 2026–27 Tax
- $1,048,407
- Market value (city estimate)
- $23,968,000
- Taxable value
- $10,100,299
- Assessed land
- $1,008,000
- Assessed improvements
- $9,777,600
Tax breaks
- Co-op and Condo Abatement, with no end date, a $209,506 credit this tax year.
Zoning
C1-8X: floor area ratio 10.92 built, above the 9.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Jan 21, 2026: $755,000
- Jan 12, 2026: $610,000
- Jul 17, 2025: $425,000
- Jun 11, 2025: $1,895,000
- Jun 6, 2025: $650,000
- Apr 28, 2025: $462,500
- Apr 15, 2024: $385,000
- Feb 7, 2024: $391,500
- Sep 26, 2023: $450,000
- Sep 6, 2023: $675,000
The 10 most recent of 27 open-market sales since 2016, from the Department of Finance’s sales files.