993 Park Avenue, Manhattan
Co-op · 50 units · built c. 1915 · Block 1512, Lot 70.
Building permits
- Alteration, filed Jun 24, 2026, estimated cost $122K, described as “Interior renovation of super's apartment, minor demolition of non-load bearing partitions, painting & finishes. No change to use, egress or occupancy. All as per plans and applications.”
- Alteration, filed Jun 4, 2026, estimated cost $215K, described as “Proposed interior renovation to unit 8E, no change to use, egress or occupancy.”
- Alteration, filed Jun 4, 2026, estimated cost $144K, described as “Interior renovation of 2-bedroom apartment including minor non-structural partition demolition, new partitions, new flooring. No change to use, egress or occupancy.”
- Alteration, filed Aug 6, 2025, estimated cost $349K, described as “Combining apartments 2N with apartment 2E on the 2ND floor. Interior renovation of apartment, minor demolition of non-load bearing partitions, painting & finishes. No change to use, egress or occupancy. All as per plans and applications.…”
- Alteration, filed Jul 8, 2025, estimated cost $3K, described as “Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application”
- Alteration, filed Jul 3, 2025, estimated cost $71K, described as “Remove eight (8) existing stairway windows at the south (a) and east (b) courtyard elevations and replace with new windows in existing masonry openings. No change in use, egress or occupancy”
- Alteration, filed Apr 14, 2025, estimated cost $3K, described as “Installation of a temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application”
- Alteration, filed Apr 8, 2025, described as “Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.”
- Alteration, filed Jan 28, 2025, estimated cost $72K, described as “Interior non structural demolition of architectural finishes, partitions, and millwork. New construction and plumbing work to be filed under subsequent applications. No change in use, occupancy or egress.”
- Alteration, filed Dec 4, 2024, estimated cost $20K, described as “Propose to perform mechanical work. No change to use, egress or occupancy.”
- Alteration, filed Sep 19, 2024, estimated cost $10K, described as “Propose to perform plumbing work. No change to use, egress or occupancy.”
- Alteration, filed Sep 19, 2024, estimated cost $120K, described as “Propose to renovate interior partitions, doors, ceilings in residential apartment. No change to use, egress or occupancy.”
- Alteration, filed Jun 19, 2024, described as “Suspended scaffold system for electrical conduit installation”
- Alteration, filed Mar 5, 2024, estimated cost $5K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Feb 16, 2024, described as “Apt 3E electric conduit installation”
- Alteration, filed Jul 28, 2023, estimated cost $35K, described as “Perform minor interior partition demolition & construction iinconjunction with APT#10E renovation. Install new doors between living & dining room. Create two new masonry openings to install thru-wall ptac units. Install new lighting.”
- Alteration, filed Jun 29, 2023, estimated cost $282K, described as “Renovation to apt 3E on the third floor filed in conjunction with DOB now pl and mh. No change to use, occupancy or egress.”
- Alteration, filed Apr 24, 2023, estimated cost $3K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Apr 12, 2023, estimated cost $30K, described as “Replacement of existing mechanical system at 7th floor. No change to existing use, egress or occupancy.”
- Alteration, filed Apr 10, 2023, estimated cost $27K, described as “Plumbing modifications (5th floor residence apt 5N) as per plans filed. No change in use, egress or occupancy.”
- Alteration, filed Apr 10, 2023, estimated cost $288K, described as “Interior renovations (5th floor, residence apt 5N) parttions, doors modifications and related finishes as per plans. No change in use, egress or occupancy.”
- Alteration, filed Nov 23, 2022, estimated cost $325K, described as “Interior demolition and alteration to residential apartment #6S at the sixth floor.”
- Alteration, filed Nov 21, 2022, estimated cost $48K, described as “Installation: (3) 2 1/2 ton thru-wall air cooled condensing units (ACCU 1,2,3) and (3) 2 1/2 ton indoor air handling units (AHU-1,2 &3) are located on the 5th floors in apartment 5E.”
- Alteration, filed Oct 26, 2022, estimated cost $78K, described as “Application filing at apt 5-e includes new and the relocation of plumbing fixtures to the kitchen and bathrooms as per plans. There is no change to the use, egress or occupancy .”
- Alteration, filed Oct 26, 2022, estimated cost $449K, described as “Application filing at apt 5-e includes general construction and cosmetic updates to the kitchen and bathrooms and a through wall opening for the air conditioning unit as per drawings. There is no change to the use, egress or occupancy .”
7 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $19,711,800
- 2026–27 tax
- $1,879,182
- Market value (city estimate)
- $43,804,000
- Taxable value
- $17,456,610
- Assessed land
- $2,322,000
- Assessed improvements
- $17,389,800
Tax breaks
- Co-op and condo abatement, with no end date, a $292,246 credit this tax year.
Zoning
R10 (part of the lot is R8B): floor area ratio 9.43 built, 10.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- May 7, 2026: $3,100,000
- Mar 16, 2026: $1,375,000
- Mar 4, 2026: $1,500,000
- Apr 22, 2025: $4,500,000
- Aug 6, 2024: $9,750,000
- Dec 14, 2023: $1,500,000
- Oct 11, 2023: $5,300,000
- Sep 29, 2022: $2,200,000
- Feb 14, 2022: $5,000,000
- Dec 21, 2021: $6,650,000
The 10 most recent of 18 open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of Park Avenue Historic District (Historic District). 47 Landmarks Preservation Commission permits are on file.