# 171 East 84th Street, Manhattan

Condominium · 217 units · built 1987 · Block 1513, Lot 7501.

On Umarelli: https://umarelli.org/nyc/1015137501/171-east-84-street

More construction in Upper East Side: https://umarelli.org/nyc/manhattan/upper-east-side.md

Every lot on block 1513: https://umarelli.org/nyc/manhattan/1513.md

## Building permits

- Alteration, filed Mar 15, 2026, estimated cost $126K, described as “Upgrade of HVAC unit in elevator machine room, no change in use, occupancy or egress.”
- Alteration, filed Feb 26, 2026, estimated cost $3K, described as “Erect an illuminated business accessory wall sign. No change in use, egress, or occupancy.”
- Alteration, filed Feb 26, 2026, estimated cost $4K, described as “Erect an illuminated business accessory wall sign. No change in use, egress, or occupancy.”
- Alteration, filed Dec 29, 2025, estimated cost $5K, described as “Proposing Construction Fence on sidewalk during storefront work.”
- Alteration, filed Dec 29, 2025, estimated cost $84K, described as “Proposing work existing tenant space for Chipotle -Install (9) Gas fixtures, (1) lav, (1) W.C., (6) non-res. sinks,(18) drains (3) hose bibs (1) secondary RPZ, (1) dishwasher, (1) Grease Interceptor & (2) ice machines w/pipin”
- Alteration, filed Dec 24, 2025, estimated cost $171K, described as “Proposing Installation of (2) 10 ton indoor air systems, ductwork, and associated apparatus, (3) self-contained Condensing Units, Pollution control exhaust unit, Exhaust Fans, Gas furnace, & (1) make up air fan unit. All work as per plans.”
- Alteration, filed Dec 24, 2025, estimated cost $44K, described as “Proposing work for new tenant space - remove Sprinkler Heads-(26) in 1st Fl & (2) incellar. Install Sprinkler Heads - (6) in Cellar, (37) on 1st Floor, all with associated piping & installation as per plans.”
- Alteration, filed Dec 23, 2025, estimated cost $633K, described as “Renovation of ext'g tenant space - Chipotle. Work to include Storefront, Interior partitions ceiling, soffit, floor & wall finishes, equipment, Furniture, Graphics, Platform for pollution control unit. All per plans.”
- Alteration, filed Dec 3, 2025, estimated cost $15K, described as “Interior demolition work as shown on filed plans”
- Alteration, filed Aug 7, 2025, estimated cost $1K, described as “Installation of temporary shanty as per dwgs. No change in use, occupancy or egress under this application.”
- Alteration, filed Jun 30, 2025, estimated cost $7K, described as “Minor interior renovation for the non-structural demolition of wall in apartment 34D on the 34TH floor. No change in use, egress, or occupancy.”
- Alteration, filed Jun 17, 2025, described as “Application for installation and use of suspended scaffold as per plans filed herein. No changes in egress, use or occupancy.”
- Alteration, filed May 15, 2025, estimated cost $1.3M, described as “Fisp repairs to include: brick replacement, mortar re-pointing, concrete repairs at balconies , shelf angle repairs, installation of horizontal expansion joints. No change in use, egress or occupancy.”
- Alteration, filed Apr 21, 2025, estimated cost $1K, described as “Installation and use of temporary supported scaffold as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Mar 25, 2025, estimated cost $10K, described as “Installation of new dry cooler system on grade and 1ST floor. No change in use, egress or occupancy.”
- Alteration, filed Mar 10, 2025, estimated cost $90K, described as “Upgrade of lobby HVAC upgrade per plans. No change in use, egress or occupancy.”
- Alteration, filed Feb 19, 2025, estimated cost $8K, described as “Enlarge existing closet in the bedroom. No change in use, egress or occupancy.”
- Alteration, filed Feb 10, 2025, estimated cost $1K, described as “Temporary installation and use of sidewalk shed as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Sep 30, 2024, estimated cost $150K, described as “Proposed interior renovation and minor partition work at 29 fl (unit #29BCD). No change in use, egress, or occupancy.”
- Alteration, filed Jul 11, 2024, described as “Suspended Scaffold out rigger system with material Hoist for Facade repair works”
- Alteration, filed May 8, 2024, estimated cost $7K, described as “Hereby filing minor general construction at unit 28BC as per plans.”
- Alteration, filed Apr 30, 2024, estimated cost $24K, described as “Plumbing work in apartment 21D in conjunction with apartment renovation filed in DOB now under job# M01027435. No change in use, egress or occupancy.”
- Alteration, filed Apr 30, 2024, estimated cost $30K, described as “Renovate existing apartment; partitions, flooring, ceiling, cabinetry, counter, doors, fixtures & finishes. No change in use,egress or occupancy”
- Alteration, filed Feb 6, 2024, described as “FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Kenneth Cole”
- Alteration, filed Jul 31, 2023, estimated cost $50K, described as “Apartment renovation. No change in Use, Occupancy or Egress.”

31 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1015137501/171-east-84-street.

## Building history

- Major Renovation — Conversion, filed Mar 31, 1995, signed off May 12, 2010, 194 units added, 36 stories, described as “Proposed work shall combine apts. 29B and 29C into one apt. By removing 2 powder rms., removing one kitchen to expand the master bath, and related misc. Removals and construction of related partitions.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $47,232,014
- 2026–27 Tax: $4,603,436
- Market value (city estimate): $104,960,005
- Taxable value: $41,698,512
- Assessed land: $5,031,006
- Assessed improvements: $42,201,008
- Condo units with their own tax lots: 221

## Tax breaks

- Co-op and Condo Abatement, with no end date, a $465,977 credit this tax year.

## Zoning

C1-9 (part of the lot is R8B): floor area ratio 15.31 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Oct 29, 2026: $1,180,000, Apt 23D
- Oct 14, 2026: $2,100,000, Apt 7B
- Sep 24, 2026: $814,050, Apt 7F
- Aug 27, 2026: $1,100,000, Apt 19A
- Aug 21, 2026: $1,750,000, Apt 17C
- Aug 10, 2026: $1,750,000, Apt 4B
- Jul 31, 2026: $4,200,000, Apt 25B
- Apr 30, 2026: $2,250,000, Apt 32B
- Sep 30, 2025: $1,999,999, Apt 31C
- Jul 2, 2025: $1,200,000, Apt 5G

The 10 most recent of 74 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
