1185 Park Avenue, Manhattan
Co-op · 172 units · built c. 1929 · Block 1522, Lot 1.
Building permits
- Alteration, filed Oct 30, 2026, estimated cost $80K, described as “New steel framing and reinforcement for new pergola support and new mechanical screen wall, filed in conjunction with GC I1 Application #M01441404.”
- Alteration, filed Oct 29, 2026, estimated cost $143K, described as “Renovation to existing roof deck for PH 16G (on floors 15+16) (total SF of area of work is 2856 sf)”
- Alteration, filed Oct 26, 2026, estimated cost $60K, described as “Removal of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, occupancy or egress.”
- Alteration, filed Oct 19, 2026, estimated cost $20K, described as “Installation of (1) 2.5 ton air-cooled split system (ACCU-1 & AHU-1) on the 2nd floor.”
- Alteration, filed Sep 15, 2026, estimated cost $1.6M, described as “Renovation of apt 6D filed in conjunction with DOB now pl and mh. No change to use, occupancy or egress.”
- Alteration, filed Aug 24, 2026, estimated cost $36K, described as “Relocation of existing thru-wall units and installation of new louvers per building standards at apt 9C. No change to use, egress or occupancy”
- Alteration, filed Aug 14, 2026, estimated cost $90K, described as “Installation of new fire water service and associated backflow preventor. No change in use, egress or occupancy.”
- Alteration, filed Jul 16, 2026, estimated cost $40K, described as “File herewith for conversion of 1st floor Medical Office space to Tenement House space. Replace exterior maisonette door with window.”
- Alteration, filed Jul 12, 2026, estimated cost $384K, described as “Penthouse g roof replacement, roof drain replacement, and roof deck repairs. No change in use, egress or occupancy.”
- Alteration, filed Jun 23, 2026, estimated cost $576K, described as “Interior renovation of unit 1A and 1L, Replacement Windows and Facade patching at former mechanical openings, New masonry opening for mechanical louver at courtyard”
- Alteration, filed Nov 26, 2025, estimated cost $231K, described as “Penthouse a roof replacement, roof drain replacement, railing restoration, divider replacement, and bulkhead threshold replacement. No change in use, egress or occupancy.”
- Alteration, filed Nov 5, 2025, estimated cost $623K, described as “Propose interior renovation of unit 8K. Removal and installation of non load bearing partitions and related finishes all as per plans herewith filed. No change in use, egress or occupancy filed under this application.”
- Alteration, filed Oct 27, 2025, estimated cost $79K, described as “Hereby filing for the interior demolition of two existing medical offices (units 1A and 1L) located on the first floor. No change to use occupancy or egress.”
- Alteration, filed Oct 16, 2025, estimated cost $48K, described as “Proposed interior renovation of apartment 1B located on the first level, including new finishes, non-load bearing partitions and fit out as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 9, 2025, estimated cost $400K, described as “Renovate Apt. 16G on floors 15+PH : general construction to include new partitions, flooring, lighting, millwork, stair railing, trim and moldings, plumbing filed as S1 ,(total sf apt. sf is 5100 sf., areas of work is 4000 sf)”
- Alteration, filed Aug 21, 2025, estimated cost $1.0M, described as “Renovation of apt 11B including interior work and HVAC masonary cuts filed in conjunction with DOB now pl. No change to use, occupancy or egress.”
- Alteration, filed Aug 5, 2025, estimated cost $3K, described as “Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed May 27, 2025, estimated cost $350K, described as “Perform minor interior partition demolition & construction inconjunction with penthouse a apartment renovation. Reconfigure kitchen & bathrooms. Relocate laundry area & powder room. Install & modify closets. Install new lighting.”
- Alteration, filed May 20, 2025, estimated cost $75K, described as “The replacement of air conditioning systems. No change in use egress or occupancy.”
- Alteration, filed Apr 21, 2025, estimated cost $22K, described as “Facade renovation modification associated with HVAC scope and window replacement. No change to use, egress nor occupancy.”
- Alteration, filed Apr 21, 2025, estimated cost $58K, described as “Interior apartment renovation as per plans filed herewith. No change to use, egress nor occupancy.”
- Alteration, filed Apr 16, 2025, estimated cost $115K, described as “Replacement of windows on the 16th & 17th floor (Apt16F/17F). No change in occupancy, use or egress.”
- Alteration, filed Apr 11, 2025, estimated cost $113K, described as “Interior renovation of apartment 7i & 8i on the 7TH and 8TH floor. No change in use, egress, or occupancy.”
- Alteration, filed Apr 2, 2025, estimated cost $3K, described as “Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Mar 13, 2025, estimated cost $38K, described as “Cellar structural repairs of steel floor framing. No change in use, egress or occupancy.”
39 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $61,421,400
- 2026–27 tax
- $6,047,200
- Market value (city estimate)
- $136,492,000
- Taxable value
- $57,296,342
- Assessed land
- $6,570,000
- Assessed improvements
- $54,851,400
Tax breaks
- Co-op and condo abatement, with no end date, a $1,080,279 credit this tax year.
Zoning
R8B (part of the lot is R10): floor area ratio 10.83 built, above the 4.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Jul 23, 2026: $6,451,000
- Jul 21, 2026: $3,300,000
- Oct 21, 2025: $6,615,000
- Aug 4, 2025: $4,500,000
- Jul 30, 2025: $4,900,000
- May 16, 2025: $13,000,000
- May 5, 2025: $600,000
- Apr 15, 2025: $2,350,000
- Apr 7, 2025: $6,700,000
- Mar 19, 2025: $2,800,000
The 10 most recent of 61 open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of Expanded Carnegie Hill Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.