# 1407 Third Avenue, Manhattan

Co-op · 168 units · built 1963 · Block 1525, Lot 1.

On Umarelli: https://umarelli.org/nyc/1015250001/1407-third-avenue

More construction in Upper East Side: https://umarelli.org/nyc/manhattan/upper-east-side.md

Every lot on block 1525: https://umarelli.org/nyc/manhattan/1525.md

## Building permits

- Alteration, filed Oct 14, 2026, estimated cost $103K, described as “Alterations to cellar as per plans. No change to occupancy or egress.”
- Alteration, filed Jul 14, 2026, estimated cost $250, described as “Install indirectly illuminated wall sign (stretch zone)”
- Alteration, filed Nov 20, 2025, estimated cost $18K, described as “Construction of interior landing and step with ADA accessible ramp at interior entrance. No change to use occupancy or egress.”
- Alteration, filed Jul 31, 2025, estimated cost $112K, described as “Parking Structure Repair Program; No Change to Use, Egress or Occupancy.”
- Alteration, filed Jun 19, 2025, estimated cost $97K, described as “Interior renovation of the apartment 15I at the 15TH floor, including general construction work. No change to egress, use or occupancy. The proposed work has no effect on the structural stability of existing building.”
- Alteration, filed Feb 5, 2025, estimated cost $350, described as “Install exterior indirectly illuminated wall sign (yellow submarine)”
- Alteration, filed May 22, 2024, estimated cost $275K, described as “Hereby filing for interior renocation of interior non bearing paritions in existing unit 15H. No change to use occupancy or egress.”
- Alteration, filed Nov 29, 2023, estimated cost $160K, described as “Interior renovation to existing retail space at 1ST floor. No change in use, egress and/or occupancy.”
- Alteration, filed Aug 25, 2023, estimated cost $350, described as “Install indirectly illuminated wall sign (visionary optics)”
- Alteration, filed Apr 4, 2023, estimated cost $250, described as “Install indirectly illuminated wall sign (lash decor)”
- Alteration, filed Apr 4, 2023, estimated cost $300, described as “Install indirectly illuminated wall sign (serenity spa 79)”
- Alteration, filed Feb 7, 2023, estimated cost $350, described as “Install indirectly illuminated wall sign (shaggy hair studio)”
- Alteration, filed Feb 7, 2023, estimated cost $400, described as “Install indirectly illuminated wall sign (simons shoe repair)”
- Alteration, filed Feb 7, 2023, estimated cost $450, described as “Install indirectly illuminated wall sign (upper east apothecary)”
- Alteration, filed Aug 23, 2022, estimated cost $183K, described as “Renovate apt 14H (partitions, finishes, electricals), plumbing fixture installation, relocations, replacements in M00739528-S1, no change to use, exits or occupancy”
- Alteration, filed Aug 1, 2022, estimated cost $103K, described as “Apt. # 12A, erect minor interior partitions, new finishes. Plumbing work to be filed under subsequent application. Connect (1) new interior a/c. No change in egress, occupancy or use.”
- Alteration, filed Jun 23, 2022, estimated cost $21K, described as “Replacement/installation of plumbing fixtures. No change in egress, occupancy, or use under this application.”
- Alteration, filed Jun 23, 2022, estimated cost $64K, described as “Interior renovation of existing residential unit(unit 18E); removal/installation of non-load bearing interior partitions, cosmetic finishes for floor, walls, & ceiling. No change in egress, occupancy, or use under this application.”
- Alteration, filed May 19, 2022, estimated cost $25K, described as “Installation of construction fence as per drawings. Construction fence shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application. Fence installed on sidewalk / roadway. Dot permits by others.”
- Alteration, filed May 19, 2022, estimated cost $846K, described as “Alterations and repairs to the building lobby. as per plans filed herewith no change in use, egress or occupancy.”
- Alteration, filed May 18, 2022, estimated cost $19K, described as “Additions/ modifications to exiting mechanical systems as per plans filed herewith. no change in use, egress or occupancy.”
- Alteration, filed Mar 28, 2022, estimated cost $15K, described as “Installation of new 5 ton split system HVAC. No change of use, egress, or occupancy under this application.”
- Alteration, filed Feb 18, 2022, estimated cost $166K, described as “Renovation of Apartment 17E, including Kitchen and 2 Bathrooms. Modification of interior partition layout as noted on Plans. Install new Washer & Electric Dryer. No change in Use, Egress, or Occupancy.”
- Alteration, filed Feb 1, 2022, estimated cost $5K, described as “Erect illuminated accessory business wall sign; copy reading "Chase with Logo"”
- Alteration, filed Feb 1, 2022, estimated cost $5K, described as “Erect illuminated accessory business wall sign; copy reading "Chase with Logo"”

14 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1015250001/1407-third-avenue.

## Property taxes

- Assessment: $33,033,150
- 2026–27 tax: $3,003,709
- Market value (city estimate): $73,407,000
- Taxable value: $27,921,449
- Assessed land: $3,685,500
- Assessed improvements: $29,347,650

## Tax breaks

- Co-op and condo abatement, with no end date, a $471,945 credit this tax year.

## Zoning

C1-9 (part of the lot is R10A): floor area ratio 13.66 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Sep 17, 2026: $2,400,000
- Jun 15, 2026: $990,000
- Apr 30, 2026: $4,850,000
- Sep 22, 2025: $1,525,000
- Aug 11, 2025: $1,612,500
- Jun 6, 2025: $1,225,000
- Jun 3, 2025: $700,000
- Apr 14, 2025: $885,000
- Mar 10, 2025: $1,200,000
- Jan 13, 2025: $1,550,005

The 10 most recent of 57 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
