245 East 93rd Street, Manhattan
Condominium · 290 units · built 1985 · Block 1539, Lot 7501.
Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.
Building permits
- Alteration, filed Aug 12, 2026, estimated cost $320K, described as “Filed herewith for interior fit-out of existing retail space for supermarket use, including non-load-bearing partitions, interior finishes, fixtures, and related work as per plans. No change to use, occupancy or egress.”
- Alteration, filed Jun 17, 2026, estimated cost $3K, described as “Install new illuminated sign read "qq nails & spa"as per plan. No change in use, egress, and occupancy.”
- Alteration, filed Mar 23, 2026, estimated cost $59K, described as “Interior renovation of apt. 28E with minor demolition. Remove & relocate non load bearing partitions per plans. No change in egress, occupancy or use is involved under this application.”
- Alteration, filed Jan 28, 2026, estimated cost $248K, described as “Interior renovation of a nail salon, work on 1ST floor only. No change to exist. Use, egress or occupancy.”
- Alteration, filed Jan 26, 2026, estimated cost $100K, described as “Interior renovation to chase bank as per plans.”
- Alteration, filed Dec 12, 2025, estimated cost $83K, described as “Interior alterations (non-load bearing partitions walls) to apt 8H”
- Alteration, filed Jul 14, 2025, estimated cost $80K, described as “Interior alterations to apt 9H”
- Alteration, filed Jun 27, 2025
- Alteration, filed Dec 11, 2024, estimated cost $250K, described as “Interior finish upgrades of aprtment unit 23D ; removal of (1) powder room; enlargement of the main bathroom as shown on plans. No change to use, egress or occupancy.”
- Alteration, filed Jun 18, 2024, estimated cost $86K, described as “Masonry Facade repair work as per drawings. No change to use, egress or occupancy.”
- Alteration, filed Jun 12, 2024, estimated cost $86K, described as “Masonry Facade repair work as per drawings. No change to use, egress or occupancy.”
- Alteration, filed Jun 12, 2024, estimated cost $86K, described as “Masonry Facade repair work as per drawings. No change to use, egress or occupancy.”
- Alteration, filed Jun 12, 2024, estimated cost $169K, described as “Masonry Facade & Greenhouse repair work as per drawings. No change to use, egress or occupancy.”
- Alteration, filed Jun 12, 2024, estimated cost $86K, described as “Masonry Facade repair work as per drawings. No change to use, egress or occupancy.”
- Alteration, filed Jun 12, 2024, estimated cost $169K, described as “Masonry Facade & Greenhouse repair work as per drawings. No change to use, egress or occupancy.”
- Alteration, filed Jun 12, 2024, estimated cost $169K, described as “Masonry Facade & Greenhouse repair work as per drawings. No change to use, egress or occupancy.”
- Alteration, filed Jun 12, 2024, estimated cost $169K, described as “Masonry Facade & Greenhouse repair work as per drawings. No change to use, egress or occupancy.”
- Alteration, filed Jun 12, 2024, estimated cost $86K, described as “Masonry Facade repair work as per drawings. No change to use, egress or occupancy.”
- Alteration, filed Jun 12, 2024, estimated cost $86K, described as “Masonry Facade work as per drawings. No change to use, egress or occupancy.”
- Alteration, filed Jun 12, 2024, estimated cost $169K, described as “Masonry Facade work. Greenhouse repair work as per drawings. No change to use, egress or occupancy.”
- Alteration, filed Jun 12, 2024, estimated cost $169K, described as “Masonry Facade work. Greenhouse repair work as per drawings. No change to use, egress or occupancy.”
- Alteration, filed May 8, 2024, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed May 6, 2024, described as “Inspection, Additional Drop Locations”
- Alteration, filed Feb 6, 2024, described as “CD5 renewal for facade work (first CD5 renewal transitioning from hardcopy/paper method to newly-imposed NYC DOB NOW process) SR 21/0323”
- Alteration, filed Nov 13, 2023, estimated cost $17K, described as “Renovation of an existing apartment, apt 28E on the 28TH floor. There is no change in occupancy, use, or egress”
24 more, older permits are in this building’s full list on the map.
Building history
- Alteration, filed Apr 21, 2015, permit issued - entire job/work, described as “Modification to partial cellar, basement, 1ST floor aka mezzanine retail/storage/office spaces.”
- Major Renovation — Conversion, filed Nov 13, 1996, permit issued - partial job, 270 units added, described as “Repair existing store front, relocate pa rtitions, create new retail store at cellar level accessory to basem ent floor at sstreet level, relocate partitions at mexxanine level, erect new suspended ceiling”
- Major Renovation — Conversion, filed Feb 17, 1995, permit issued - partial job, 291 units added, 33 stories, described as “Change from eating & drinking ug 12 to d ance studios ug 9, extend existing mezzanine, relocate interior no n bearing partitions and plumbing fixtures, relocate ductwork.”
- Major Renovation — Conversion, filed Dec 22, 1993, signed off Mar 20, 1997, 295 units added, 32 stories, described as “To combine apts 5E & 5D at fifth floor; to rearrange and to remove plumbing fixtures. To secure amended c.o.”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $52,739,974
- 2026–27 Tax
- $5,150,578
- Assessed land
- $5,168,265
- Assessed improvements
- $47,571,709
- Condo units with their own tax lots
- 296
Tax breaks
- Nonprofit exemption (charitable), with no end date, about $12,717 a year below the full tax.
- Nonprofit exemption (parsonage), with no end date, about $22,857 a year below the full tax.
- Co-op and Condo Abatement, with no end date, a $720,583 credit this tax year.
Zoning
R8 (part of the lot is C2-8): floor area ratio 9.07 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Jul 1, 2026: $1,188,000, Apt 20C
- Jun 3, 2026: $1,950,000, Apt 26G
- Apr 28, 2026: $980,000, Apt 18A
- Apr 28, 2026: $1,780,000, Apt 9H
- Apr 24, 2026: $1,625,000, Apt 6F
- Apr 17, 2026: $1,050,000, Apt 22C
- Dec 17, 2025: $850,000, Apt 2E
- Dec 1, 2025: $925,000, Apt 29F
- Nov 20, 2025: $1,623,660, Apt 28E
- Oct 30, 2025: $1,800,000, Apt 5L, sold with other lots
The 10 most recent of 115 open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- 1803 MEXICAN RESTAURANT (City Planning P2001M0667): Completed, decided Aug 30, 2001. NEW-UNENCLOSED SIDEWALK CAFE WITH 27 SEATS
- RUPPERT BREWERY URA Q PARCEL (City Planning P1986M0203): Completed, decided Jul 1, 1987. MODIF OF LSRD BY AUTH (ZR78-41) TO ALLOW PERMITTED*ACCESSORY OFF-ST PARKING SPACES TO BE LOCATED WITHIN THE*DEVELOPMENT WITHOUT REGARD TO LOT LINES. (CARNEGIE PK/ASTOR*TERRACE GARAGE)
- 245 E93 ST (City Planning P1984M0096): Completed, decided Dec 30, 1983. Q PARCEL IN RUPERT BREWERY URA MODIF OF LSRD PLAN
- 245 E93RD ST (City Planning P1984M0458): Completed, decided Dec 30, 1983. MODIF IN PLANS OF RESTR DECL TO REFLECT PROPOSED CHANGES*IN LSRDP
- 1801-15, 135-47 E93 ST, 236-48 2ND AVE (City Planning P1982M0385): Completed, decided Feb 17, 1982. CERT (ZR95-041) THAT A TRANSIT EASEMENT VOLUME IS NOT*REQRIRED ON Z0NING LOT FOR CONSTRUCTION OF RESD'L DEV OF*APPROX 340 DU'S