# 312 East 95th Street, Manhattan

Private School · built 2012 · Block 1557, Lot 41.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/1015570041/312-east-95-street

More construction in Upper East Side: https://umarelli.org/nyc/manhattan/upper-east-side.md

Every lot on block 1557: https://umarelli.org/nyc/manhattan/1557.md

## Building permits

- Alteration, filed Mar 13, 2026, described as “Installation of suspended scaffold for facade work or inspection.”
- No Work, filed May 14, 2025, described as “Commencement Trevor Day School 2025 Commencement - June 12, 2025 - 9:30AM to 11:30 AM - 564 Guests”
- No Work, filed Jun 7, 2024, described as “Commencement Trevor Day School 2024 Commencement - June 13, 2024 - 9:30AM to 11:30 AM - 551 Guests”
- Alteration, filed Apr 22, 2024, described as “Installation of suspended scaffold for facade work or insepction”
- Alteration, filed Apr 10, 2024, estimated cost $826K, described as “General construction and structural work to include facade repairs as shown on plans (Local Law 11 - FISP CYC 9B).”
- Alteration, filed Mar 25, 2024, described as “Installation of temporary sidewalk shed as per plan. No change in use,egress or occupancy”
- No Work, filed Jun 7, 2023, described as “Commencement Trevor Day School 2023 Commencement - June 15, 2023 - 9:30AM to 11:30 AM - 550 Guests”
- Alteration, filed May 25, 2023, estimated cost $111K, described as “Mechanical work as shown on plans (Trevor Day School).”
- Alteration, filed May 25, 2023, estimated cost $10K, described as “Modifications to an existing sprinkler system”
- Alteration, filed May 23, 2023, estimated cost $50K, described as “General construction work as shown on plans to include interior renovation to non-load bearing partitions and finishes. (Trevor Day School).”
- Alteration, filed Jan 31, 2023, estimated cost $4K, described as “Installation of temporary roof protection during bldg alteration at the adjacent property (309 east 94 st), filed sep. Roof protection shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Jul 7, 2022, estimated cost $5K, described as “Modifications to an existing sprinkler system.”
- Alteration, filed Jun 3, 2022, estimated cost $1K, described as “Installation of temporary roof protection as per plan. No change in use,egress or occupancy.”
- Alteration, filed Jun 3, 2022, estimated cost $1K, described as “Installation of temporary work platform as per plan. No change in use,egress or occupancy.”
- Alteration, filed Jun 3, 2022, described as “Installation of temporary sidewalk shed as per plan. No change in use,egress or occupancy.”
- Alteration, filed Jun 1, 2022, estimated cost $437K, described as “Structural work as shown on plans.”
- Alteration, filed Jun 1, 2022, estimated cost $525K, described as “General construction work as shown on plans.”
- Alteration, filed May 31, 2022, estimated cost $2.0M, described as “Mechanical work as shown on plans.”
- Alteration, filed May 31, 2022, estimated cost $10K, described as “Plumbing work as shown on plans.”
- Alteration, filed Jul 18, 2018, estimated cost $5K, described as “Installation of a heavy duty sidewalk shed approximately 144'LONG as per plans in conjunction with NB construction. No change in use, egress or occupancy. Sidewalk shed shall comply with 2014 NYC building code, chapter 33.”

## Building history

- Demolition, filed Dec 22, 2010, signed off Oct 3, 2011, stories 5 to 0
- Demolition, filed Dec 22, 2010, signed off Oct 3, 2011, stories 2 to 0
- New Building — Mid-Rise, filed Sep 30, 2008, signed off Jun 3, 2019, 12 stories, described as “Application filed for zoning &amp; egress review. Application requires approval from board of standards and appeals. Erect new building. Application reviewed under 2008 code.”
- Alteration, filed Aug 25, 2008, plan exam - disapproved, stories 5 to 12, described as “Application filed for zoning and egress review. Application requires approval from board of standards and appeals. Change of use and vertical enlargement.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $20,246,400
- Market value (city estimate): $44,992,000
- Taxable value: $0
- Assessed land: $3,296,700
- Assessed improvements: $16,949,700

## Tax breaks

- Nonprofit exemption (school), with no end date, about $2,196,329 a year below the full tax.

## Zoning

C8-4: floor area ratio 9.67 built, above the 5.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, moderate risk: a 0.2% chance of flooding each year. FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 12 ft (NAVD88).

## Board and land use applications

- Variance or Special Permit (Board of Standards and Appeals 304-08-BZ): Variance or Special Permit, Granted, filed Dec 12, 2008, decided May 19, 2009. Variance (§72-21) and Special Permit (§73-19) to allow a school in a C8-4 district contrary to bulk regulations (§33-123, §33-451, §33-453, §33-454, §33-26). C8-4 District.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
