# 401 East 84th Street, Manhattan

Condominium · 84 units · built 1986 · Block 1564, Lot 7502.

On Umarelli: https://umarelli.org/nyc/1015647502/401-east-84-street

More construction in Upper East Side: https://umarelli.org/nyc/manhattan/upper-east-side.md

Every lot on block 1564: https://umarelli.org/nyc/manhattan/1564.md

## Building permits

- Alteration, filed Aug 7, 2026, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Jun 29, 2026, estimated cost $268K, described as “Installation of two 4" domestic cold water risers (fill line and down feed line) and associated domestic cold water piping as shown on plans.”
- Alteration, filed May 15, 2026, estimated cost $373K, described as “Facade repairs, no change in use, egress or occupancy.”
- Alteration, filed Sep 24, 2025, described as “Installation of industrial rope access for facade inspections.”
- Alteration, filed Jul 11, 2023, estimated cost $100K, described as “Filing herewith general construction scope to combine apartments 26 b & c to one unit as per plans filed herewith. No change is use, egress, nor occupancy.”
- Alteration, filed Jul 11, 2023, estimated cost $70K, described as “Filing herewith changes to interior partitions to reconfigure layouts of apartments a & b. No change to use, egress, nor ocupancy.”
- Alteration, filed Feb 22, 2023, estimated cost $125K, described as “Interior renovation of apt. 23AB with new partition walls, flooring and plumbing work. No change the use, egress or occupancy.”
- Alteration, filed Nov 7, 2022, estimated cost $100K, described as “Mechanical work for apartment renovation”
- Alteration, filed Aug 11, 2022, estimated cost $80K, described as “Structural work to include demolition of 1 existing staircase, and extension of 1 existing staircase for apartment renovation”
- Alteration, filed Aug 8, 2022, estimated cost $150K, described as “Installation of new/relocated bathroom fixtures, kitchen fixtures, and washing machine with piping for apartment renovation”
- Alteration, filed Aug 5, 2022, estimated cost $1.1M, described as “Apartment renovation”
- Alteration, filed Jan 22, 2021, estimated cost $75K, described as “Interior renovation of existing unit ph a at 26TH, 27TH & 28TH floors. Removal of stair between 26TH & 27TH floor subdividing triplex unit into 2 separate apartments, floor/ceiling repair, and cosmetic improvements as indicated on drawings”
- Alteration, filed Mar 6, 2020, estimated cost $45K, described as “Mechanical work in conjuntion with A2 DOB# 123745634 for the interior renovation and the combining of apartments #17C and #17B on the 017TH floor. No change in bulk, egress, use or occupancy under this application”
- Alteration, filed Mar 6, 2020, estimated cost $154K, described as “Plumbing work in conjunction with alteration type ii DOB# 123745634 for the interior renovation and the combining of apartments #17C and #17B on the 017TH floor.”
- Alteration, filed Nov 26, 2019, estimated cost $16K, described as “Interior renovation of apartment #5C, including renovated kitchen, bathroom and installation of a new washer, in-conjunction with JOB#123788838.”

## Building history

- Alteration, filed Oct 1, 2014, plan exam - disapproved, described as “Modification of lobby and cellar for new educational use. Interior demolition and construction at cellar level.”
- Alteration, filed Nov 3, 1999, signed off Feb 10, 2015, units 83 to 85, stories 32 to 28, described as “Filing to establish multi-purpose f-3 space at cellar. No work under this application.”
- Major Renovation — Conversion, filed Jul 10, 1997, permit issued - entire job/work, 87 units added, described as “Add apartment 15D to apartments 15B &amp; 15C combination, as per plans attached.”
- Major Renovation — Conversion, filed Nov 20, 1995, signed off Apr 22, 1997, 87 units added, 32 stories, described as “Installation of new partitions and inter ior finishes. Removal of existing kitchen fixtures and cabinetry. No change in use or egress under this application. All work to comply with loc al law 58/87.”
- Alteration, filed Mar 15, 1994, plan exam - disapproved, described as “Plan work approval to establish gymboree space.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $17,170,211
- 2026–27 Tax: $1,594,400
- Market value (city estimate): $38,156,007
- Taxable value: $14,955,680
- Assessed land: $2,583,005
- Assessed improvements: $14,587,206
- Condo units with their own tax lots: 89

## Tax breaks

- Co-op and Condo Abatement, with no end date, a $177,437 credit this tax year.

## Zoning

C1-9: floor area ratio 15.56 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- May 19, 2026: $680,000, Apt 5D
- Jan 17, 2024: $850,000, Apt 4B
- Aug 25, 2023: $1,400,000, Apt 21A
- Jan 24, 2023: $1,150,000, Apt 3A
- Jul 14, 2022: $2,500,000, Apt 23A, sold with other lots
- Jun 14, 2022: $1,496,000, Apt 16B
- Dec 30, 2021: $4,700,000, Apt 27A, sold with other lots
- Nov 4, 2020: $1,100,000, Apt 3C
- Sep 23, 2020: $795,000, Apt 3B
- Aug 31, 2020: $1,240,000, Apt 16A

The 10 most recent of 21 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- THE DUNHILL (City Planning P1987M0382): Completed, decided Jan 9, 1991. 85-031M: CONSTRUCTION OF 32 STORY BLDG.
- 403 E84TH ST (City Planning P1985M0969): Completed, decided Nov 11, 1985. 85-031M: CONSTRUCTION OF 32 STORY BLDG.
- 403 E84TH ST (City Planning P1985M0220): Completed, decided Aug 26, 1985. 85-031M: CONSTRUCTION OF 32 STORY BLDG.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
