# 428 East 92nd Street, Manhattan

Industrial · built 2020 · Block 1571, Lot 35.

On Umarelli: https://umarelli.org/nyc/1015710035/428-east-92-street

More construction in Upper East Side: https://umarelli.org/nyc/manhattan/upper-east-side.md

Every lot on block 1571: https://umarelli.org/nyc/manhattan/1571.md

## Building permits

- Alteration, filed Apr 9, 2021, estimated cost $2K, described as “Erect steel flag pole on exterior facade”
- Alteration, filed Apr 9, 2021, estimated cost $2K, described as “Erect steel flag pole on exterior facade”
- Alteration, filed Apr 9, 2021, estimated cost $500, described as “Erect non-illuminated accessory business wall sign copy reading "Loading"”
- Alteration, filed Apr 9, 2021, estimated cost $520, described as “Erect non-illuminated accessory business wall sign copy reading "Rental Office"”
- Alteration, filed Apr 9, 2021, estimated cost $18K, described as “Erect illuminated accessory business wall sign copy reading "Public Storage"”
- Alteration, filed Apr 9, 2021, estimated cost $2K, described as “Erect illuminated accessory business D/F projecting sign copy reading "Public Storage"”
- Alteration, filed Apr 9, 2021, estimated cost $2K, described as “Erect illuminated accessory business projecting sign copy reading "Public Storage"”
- Alteration, filed Feb 5, 2021, estimated cost $2K, described as “Installation of new sprinkler and standpipe system in conjunction with NB #122961321”
- Alteration, filed Dec 2, 2020, estimated cost $5K, described as “Installation of pipe scaffold as per plans. Pipe scaffold shall comply with chapter #33 of the 2014 code, no change to use, egress or occupancy.”
- Alteration, filed Aug 22, 2020, estimated cost $5K, described as “Installation of sidewalk shed as per plans.sidewalk shed live load will be 300 psf. Shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy.”
- Alteration, filed Jan 24, 2019, described as “Installation of heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jan 18, 2019, described as “Installation of pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Feb 21, 2018, estimated cost $5K, described as “Construction fence to protect site during construction”
- Alteration, filed Feb 2, 2018, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the NYC building code.live load 300PSF.”

## Building history

- Demolition, filed Dec 1, 2017, signed off Mar 1, 2019, stories 2 to 0, described as “Full demolition of two story structure, using hand held equipment and partial mechanical.”
- New Building — Non-residential, filed Dec 2, 2016, signed off Jul 10, 2023, 6 stories

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $3,119,400
- 2026–27 Tax: $314,439
- Market value (city estimate): $6,932,000
- Taxable value: $2,898,590
- Assessed land: $520,650
- Assessed improvements: $2,598,750

## Zoning

C8-4: floor area ratio 5.88 built, above the 5.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
