# 80 East End Avenue, Manhattan

Co-op · 152 units · built 1958 · Block 1580, Lot 23.

On Umarelli: https://umarelli.org/nyc/1015800023/80-east-end-avenue

More construction in Upper East Side: https://umarelli.org/nyc/manhattan/upper-east-side.md

Every lot on block 1580: https://umarelli.org/nyc/manhattan/1580.md

## Building permits

- Alteration, filed May 12, 2026, estimated cost $8K, described as “Interior combination of apartments 10F and 10G on the 10TH floor as per tppn 3/97. No change to use, egress, or occupancy.”
- Alteration, filed Sep 23, 2025, estimated cost $313K, described as “Hereby filing for the interior renovation of existing apartment 14DE located on the 14TH floor. No change to use occupancy or egress.”
- Alteration, filed Jul 21, 2025, estimated cost $1K, described as “Installation of material only hoists as per drawings. Hoists shall comply with ch #33 of the NYC bldg code. No change in use, occupancy or egress under this application.”
- Alteration, filed Jun 18, 2025, estimated cost $5K, described as “Filing for repairs of the shelf angles on 10th and 17th fl. No change in use, occupancy or egress.”
- Alteration, filed Mar 11, 2025, estimated cost $20K, described as “Filing for sidewalk leak repairs. No change in use, occupancy or egress.”
- Alteration, filed Feb 7, 2025, estimated cost $15K, described as “Remove partition to combine apartments 14D & 14E. No change in use, egress or occupancy”
- Alteration, filed Nov 11, 2024, estimated cost $1K, described as “Proposed installation of temporary light duty pipe scaffold as per plans. Work shall comply with chapter #33 of 2022 the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Nov 11, 2024, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Jan 30, 2024, estimated cost $197K, described as “Interior renovation of unit 12E on the 12TH floor. Removal and installation of non-loadbearing partitions, new finishes and millwork per plans. No change in egress, use, or occupancy.”
- Alteration, filed Sep 7, 2023, estimated cost $250K, described as “Replacement of a Cooling Tower and two air-cooled air handling units.”
- Alteration, filed Nov 23, 2022, estimated cost $5K, described as “Interior alteration of apartment #9D on the 9TH floor including removal of non-structural partitions, new interior partitions, and finishes. No change in use, egress, or occupancy.”
- Alteration, filed May 19, 2022, estimated cost $139K, described as “Parking garage ramp replacement and waterproofing as perplans submitted herewith. No change in use, occupancy or egress.”
- Alteration, filed Sep 9, 2021, estimated cost $100K, described as “Filing application for the combination ofapartments 17A & 17B on the 17TH and 18TH floor. No change in use egress or occupancy.”
- Alteration, filed Mar 16, 2021, estimated cost $6K, described as “Plumbing fixtures in apt 16F. No change to use, occupancy or egress.”
- Alteration, filed Mar 16, 2021, estimated cost $19K, described as “Interior renovation in apt 16F on the 15TH floor. Extenind the kitchen into the existing den and get reno. No change to use, occupancy or egress.”
- Alteration, filed Feb 8, 2021, estimated cost $8K, described as “Combination of apartment 7G and 7H through common wall as per TECHNICAL POLICY AND PROCEDURE NOTICE #3/97.”
- Alteration, filed Feb 5, 2021, estimated cost $4K, described as “Plumbing work associated with interior renovation of apartment combination as per TECHNICAL POLICY AND PROCEDURE NOTICE #3/97.”
- Alteration, filed Dec 15, 2020, estimated cost $50K, described as “Mechanical work as per plans. No change of use, egress or occupancy under this application.”
- Alteration, filed Nov 16, 2020, estimated cost $55K, described as “Installation of new Verizon site. Install 4 new antenna sectors, 2 new GPS units, and 2 new equipment cabinets on roof. Conduit run from cellar to roof. All in conformance with TPPN 5/98. No change in use, egress, or occupancy.”
- Alteration, filed Jan 31, 2020, estimated cost $2K, described as “Existing 20 story building, 145 residential units. Minor interior renovation to restore combined apartments 10J & 10A as individual units to supersede job# 103798892 no change in occupancy, bulk, or egress.”
- Alteration, filed Jan 14, 2020, estimated cost $30K, described as “Filing alt2 for minor PL work at 19th and Penthouse floors.No change to use egress or occupancy”
- Alteration, filed Oct 17, 2019, estimated cost $4K, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 8, 2019, estimated cost $5K, described as “Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Nov 28, 2018, estimated cost $5K, described as “Installation of a temporary scaffold as per plans in conjunction with general construction. No change in use, egress or occupancy. Scaffold shall comply with 2014 NYC building code, chapter 33.”

## Building history

- Alteration, filed Jul 20, 2006, signed off May 20, 2009, units 146 to 145, described as “Remove and install new partitions ,rearr ange plumbing, combine apartment 1B and 2J.”
- Major Renovation — Conversion, filed Nov 18, 2004, signed off May 20, 2009, 143 units added, 19 stories, described as “Renovation of an existing preschool, including increase in number of persons and change of egress. Architectural and structural work. An amended Certificate of Occupancy to be obtained.”
- Major Renovation — Conversion, filed Apr 9, 1999, signed off Mar 27, 2000, 147 units added, 19 stories, described as “Change of use of existing tenant space on portion of cellar and first floor from use group 6, eating and drinking establishment to use group 4, non-profit insti tute day care / nursery school (preschool) for the deaf. Minor partition…”
- Major Renovation — Conversion, filed Jun 12, 1996, signed off Jan 9, 1997, 66 units added, 19 stories, described as “Combination of apartment 1A and 2A. Remo val and installation of partitions, doors and related finishes. Removal of fixtures.”
- Major Renovation — Conversion, filed Mar 19, 1996, permit issued - entire job/work, 154 units added, 19 stories, described as “Removal of walls to combine apartments 8A and 8B. Combine apt's 8A and 8B on the 8TH floor.”
- Alteration, filed Nov 20, 1995, signed off Mar 6, 1997, described as “Convert bank area in cellar &amp; 1ST fl. In to childrens science musuem. Minor partition &amp; pl work.”
- Major Renovation — Conversion, filed Jul 27, 1995, signed off Oct 3, 1996, 148 units added, 21 stories, described as “No work to be done under this appl. Combining 2 apts. Into 1 apt. All work filed under previous appl. No change to number of habitable rooms. Existing c of o to be amended under this appl..”
- Major Renovation — Conversion, filed May 23, 1995, signed off Jan 10, 1996, 154 units added, 19 stories, described as “There is no work to be perfomed under this appl., legalization only. Combine apts. 12F &amp; 12G on the 12TH fl. And combine apts. 9E &amp; 9F on the 9TH fl. The work on the 9TH floor was previously filed and approved under appl. #…”
- Major Renovation — Conversion, filed Jun 13, 1991, plan exam - approved, 153 units added, 19 stories, described as “Combining two apts on the 9TH floor into one apt. All interior work done under application bn 7987/89. Application filed to obtain amended certificate of occupancy for the combined apts.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $14,168,250
- 2026–27 Tax: $1,294,696
- Market value (city estimate): $31,485,000
- Taxable value: $12,359,255
- Assessed land: $3,604,500
- Assessed improvements: $10,563,750

## Tax breaks

- Co-op and Condo Abatement, with no end date, a $242,792 credit this tax year.

## Zoning

R10A (part of the lot is R8B): floor area ratio 12.04 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Aug 3, 2026: $1,685,000
- Apr 21, 2026: $665,000
- Feb 6, 2026: $625,000
- Dec 3, 2025: $1,151,000
- Oct 3, 2025: $650,000
- Sep 12, 2025: $395,000
- Jul 10, 2025: $440,000
- Jun 9, 2025: $2,025,000
- Apr 11, 2025: $650,000
- Dec 16, 2024: $3,850,000

The 10 most recent of 49 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
