Public School · built c. 1920 · Block 1581, Lot 23.
Building permits
- Alteration, filed Dec 2, 2025, estimated cost $220K, described as “Facade Repairs, no change to egress, occupy or use.”
- Alteration, filed Nov 7, 2025, described as “Facade Inspection via Industrial Rope Access as shown on plans”
- Alteration, filed Oct 28, 2025, described as “Application for the installation and use of suspended scaffold and material hoist as per plans filed herein. No change in egress, use, or occupancy.”
- Alteration, filed Jul 25, 2025, estimated cost $10K, described as “Heavy duty sidewalk shed during bldg alteration, filed sep. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Nov 18, 2022, estimated cost $2K, described as “Installation of temporary system scaffold as per drawings. System scaffold shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Oct 31, 2022, estimated cost $25K, described as “Provide 2 CO2 tanks and 13 CO2 outlets. Not used for medical purposes. School laboratory use as per plans filed herewith.”
- Alteration, filed Jun 16, 2022, estimated cost $180K, described as “Kitchen concrete topping demolish and replacement. NO change in use, egress or occupancy.”
- No Work, filed Jun 30, 2020
- No Work, filed Jun 30, 2020
- Alteration, filed May 11, 2020, estimated cost $311K, described as “Private school renovations for boiler located on the 10th floor as indicated on plans filed herewith. No change to use, egress or occupancy.”
- No Work, filed Dec 3, 2019, described as “Temporary place of assembly as per plans filed herewith”
- Alteration, filed Nov 5, 2019, estimated cost $32K, described as “Installation of scaffold as per drawings. Scaffold shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- No Work, filed Sep 27, 2019, described as “Temporary place of assembly as per plans filed herewith”
- Alteration, filed Sep 4, 2019, estimated cost $13K, described as “Installation of temporary loop sprinkler heads as shown on plans filed herewith. No change in use , egress or occupancy.”
- Alteration, filed Jul 23, 2019, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jun 6, 2019, described as “Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Feb 20, 2019, estimated cost $6K, described as “Installation of a temporary system scaffold as per plans during general construction work. No change in use, egress or occupancy. Scaffold to comply with chapter 33 of NYC building code of 2014.”
- Alteration, filed Dec 10, 2018, estimated cost $18K, described as “Installation of system scaffold as per drawings. System scaffold shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Sep 19, 2018, estimated cost $25K, described as “Installation of scaffold as per drawings. Scaffold shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Dec 21, 2017, estimated cost $48K, described as “Installation of scaffold as per drawings. Scaffold shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
Building history
- Alteration, filed Dec 2, 2014, permit issued - entire job/work, stories 8 to 11, described as “Filing herewith alteration one application for change in use, egress and occupancy. Project consists of renovation of the existing school. Enlargement of existing cellar.no addition to the buildings floor area”
- Alteration, filed Jun 17, 2014, permit issued - entire job/work, stories 8 to 11
- Alteration, filed Jul 10, 2006, signed off Jul 24, 2014
- Alteration, filed Nov 13, 1995, signed off Nov 9, 2001, described as “Enlarge existing school.”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $34,692,750
- Market value (city estimate)
- $77,095,000
- Taxable value
- $0
- Assessed land
- $4,194,000
- Assessed improvements
- $30,498,750
Tax breaks
- Nonprofit exemption (school), with no end date, about $3,763,470 a year below the full tax.
Zoning
R8B (part of the lot is R10A): floor area ratio 5.75 built, above the 4.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- Variance or Special Permit (Board of Standards and Appeals 260-14-BZ): Variance or Special Permit, Granted, filed Oct 17, 2014, decided Oct 16, 2015. Variance (§72-21): to permit the construction of a three-story enlargement to the existing school, contrary to floor area, rear yard, height and setback requirements. (R8B/R10A) zoning district.
- Change to an Earlier Grant (Board of Standards and Appeals 171-95-BZ): Change to an Earlier Grant, Granted, filed Jul 21, 2006, decided Oct 17, 2006. Amendment to a not-for-profit all girls school (The Chapin School) for a three floor enlargement which increases the floor area and the height of the building. The premise is located in an R8B/R10A zoning district.
- THE CHAPIN SCHOOL (City Planning P1987M1022): Completed. 87-300M: VAR TO ENLARGE EXIST COMM FACILITY BY ADDING GYMNASIUM AND CLASSROOM SPACE. TB1581. TL23.