1750 York Avenue, Manhattan
Community Center · built 1942 · Block 1587, Lot 1.
Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.
Building permits
- No Work, filed Aug 18, 2026
- No Work, filed Aug 14, 2026
- No Work, filed Aug 14, 2026
- Alteration, filed Jun 25, 2026, estimated cost $2.0M, described as “Construction alterations at the Aquatic Center. No change in egress, occupancy or use.”
- Alteration, filed Mar 27, 2026, estimated cost $300K, described as “Replacement in kind of cooling tower and associated condenser water pumps and piping”
- Alteration, filed Mar 26, 2026, estimated cost $1.2M, described as “Replacement of existing natatorium dehumidification air handling unit and associated ductwork and piping in 2ND floor mechanical room. Also miscellaneous repairs to mechanical systems and ductwork within the rooftop mechanical room,cellar,…”
- Alteration, filed Mar 26, 2026, estimated cost $50K, described as “Replacement in kind of existing domestic water booster pump and pressurestorage tank.”
- Alteration, filed Mar 26, 2026, estimated cost $100K, described as “Work includes new concrete infill & patching at slabs and pits, new reinforcement of structural steel framing to support new mechanical equipment, new penetrations through existing concrete on metal deck, and installation of new steel…”
- Alteration, filed Mar 26, 2026, estimated cost $256K, described as “No change in egress, occupancy, or use. Reinforcement of the underside of the 2nd floor slab. Installation of new 2nd floor ceilings and partitions. Replacement of the 3rd floor roof.”
- Alteration, filed Mar 25, 2026, estimated cost $36K, described as “Murphy center 1ST floor demoltion”
- No Work, filed Aug 2, 2024, described as “Concert, related to a summer camp programming, under a temporary tent in a soccer field, within the Asphalt Green athletic facility.”
- Alteration, filed Jun 24, 2024, estimated cost $30K, described as “Temporary accessory tent canopies in open areas for Asphalt Green athletic and recreational areas. Removed at the end of the programing. No changes to existing structures, use or egress”
- Alteration, filed May 22, 2023, estimated cost $116K, described as “Renovations to laundry room. Work to include partition, ceiling and door modifications as per plans. No change in use, egress or occupancy”
- Alteration, filed May 19, 2023, estimated cost $15K, described as “Plumbing modifications (laundry room) no change in use egress or occupancy.”
- Alteration, filed Mar 9, 2022, estimated cost $25K, described as “Structural modifications on roof as per plans filed herewith. No change in use egress or occupancy under this application.”
- Alteration, filed Mar 9, 2022, estimated cost $110K, described as “New cooling tower equipment as per plans filed herewith. No change in use, egress or occupancy under this application.”
- Alteration, filed Mar 2, 2022, estimated cost $50K, described as “New cooling tower platform and flashing at the existing roof, screen wall as per plans. Minor masonry repairs, No change in use egress or occupancy under this application.”
- No Work, filed May 25, 2021, described as “Seated Commencement Ceremony for invited guests only”
- No Work, filed May 25, 2021, described as “Seated Commencement Ceremony for invited guests only”
- Alteration, filed May 25, 2021, estimated cost $5K, described as “Installation of a temporary tent for commencement ceremonies”
Building history
- Alteration, filed Sep 15, 2009, permit issued - entire job/work, described as “Filing herewith for alteration type 1 no work to correct number of persons from 320 to 502 for the 2ND floor grandstand pa space. All work done under applications dir. 14- 104571223.”
- Alteration, filed Dec 1, 2005, plan exam - approved, described as “Filing to correct the number of persons listed on the certificate of occupancy for the 2nd Floor grandstand seating (Bleachers) serving the pool area below. The original NB was designed for the proposed number.”
- New Building — Non-residential, filed Jan 9, 1991, signed off Feb 7, 2003, 5 stories
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $72,583,650
- Market value (city estimate)
- $161,297,000
- Taxable value
- $0
- Assessed land
- $36,616,050
- Assessed improvements
- $35,967,600
Zoning
M1-4 (part of the lot is R7-2): floor area ratio 0.25 built, 2.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, moderate risk: a 0.2% chance of flooding each year.
Landmarks
Part of Municipal Asphalt Plant (Individual Landmark). 19 Landmarks Preservation Commission permits are on file.
Board and land use applications
- ASPHALT GREEN SWIM\SPORTS TRAINING (City Planning P1990M0568): Completed, decided Sep 26, 1990. 90-187M: DEMAP AREA BET 91ST ST & 92ND ST, YORK AVE & FDR DRIVE FOR THE CONSTR OF A MUNICIPAL SWIM & SPORTS TRAINING
- LITWIN (City Planning P1987M0776): Completed, decided Jan 29, 1990. 3RD MODIF OF A SPEC PERMIT FOR HOUSING QUALITY TO ELIMINATE*17 UNITS DESIGNATED FOR THE ELDERLY