# 40 West 116th Street, Manhattan

Condominium · 249 units · built 2006 · Block 1599, Lot 7502.

On Umarelli: https://umarelli.org/nyc/1015997502/40-west-116-street

More construction in Harlem: https://umarelli.org/nyc/manhattan/harlem.md

Every lot on block 1599: https://umarelli.org/nyc/manhattan/1599.md

## Building permits

- Alteration, filed Oct 6, 2026, estimated cost $155K, described as “Upgrade of existing building heating plant. Replacement of gas-fired hot-water condensing boiler. No change in use, egress, or occupancy.”
- Alteration, filed Oct 5, 2026, estimated cost $20K, described as “Upgrade of existing building heating plant. Replacement of gas fired hot water condensing boiler. No change in use, egress, or occupancy.”
- Alteration, filed Oct 5, 2026, estimated cost $15K, described as “Disconnection and removal of the existing gas-fired, condensing type boiler and replacement with a new gas-fired, condensing type boiler. No change in use, egress, or occupancy.”
- Alteration, filed Aug 25, 2026, described as “Suspended Scaffold for Facade Restoration & Inspection as Shown on Plans”
- Alteration, filed Aug 13, 2026, estimated cost $5K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Aug 7, 2026, estimated cost $3K, described as “Temporary installation and use of sidewalk shed as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed May 18, 2026, estimated cost $150K, described as “Facade repairs as per plans filed. No change in occupancy, use or egress.”
- Alteration, filed Sep 5, 2025, estimated cost $15K, described as “Herewith filing to structurally fill in a vent shaft at this existing parking garage. No change to use, occupancy or egress.”
- Alteration, filed Dec 3, 2024, estimated cost $353K, described as “Installation of three (3) condensing domestic hot water heaters. No change in use, egress, or occupancy.”
- Alteration, filed Sep 20, 2022, estimated cost $45K, described as “Facade repair as shown on plans. No change to egress use or occupancy.”
- Alteration, filed Mar 11, 2022, estimated cost $5K, described as “Installation of temporary sidewalk shed as per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 28, 2021, estimated cost $200K, described as “Facade restoration as per plans filed. No change in occupancy, use, or egress.”
- Alteration, filed Jun 25, 2021, estimated cost $25K, described as “Application being filed to show interior renovation of apt B1006, 10th floor. Work is installation of non-load bearing walls and door to create a new bedroom and move non-load bearing wall between Bathroom 1 and 2. No change in use,…”
- Alteration, filed Dec 11, 2020, estimated cost $14K, described as “Filing sprinkler type work to relocate 5 sprinkler heads,add 11 and replace 1 as per plans submitted herewith. There shall be no change in use, occupancy or means of egress under this application.”
- Alteration, filed Nov 4, 2020, estimated cost $1K, described as “Installation of steel pipe scaffold as per plan. No change to egress, use, or occupancy.”
- Alteration, filed Sep 11, 2020, estimated cost $2K, described as “Propose to cap and remove water closet and lavatory as per plans submitted herewith. There shall be no change in use, occupancy or means of egress under this application.”

## Building history

- Alteration, filed May 30, 2024, permit issued - entire job/work
- Alteration, filed Jun 21, 2012, permit issued - entire job/work, described as “Change in use at 1ST floor and mezz commercial space from retail to eating &amp; drinking establishment, ug #12. Construction work performed under related alt ii applications.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $43,570,484
- 2026–27 Tax: $120,595
- Market value (city estimate): $96,823,273
- Taxable value: $1,069,760
- Assessed land: $634,506
- Assessed improvements: $42,935,978
- Condo units with their own tax lots: 253

## Tax breaks

- Nonprofit exemption (charitable), with no end date, about $171,247 a year below the full tax.
- 421-a exemption, through Jun 30, 2034, about $4,841,814 a year below the full tax.
- ICAP/ICIP exemption, through Jun 30, 2032, about $128,349 a year below the full tax.

## Zoning

C4-5X: floor area ratio 6.72 built, above the 5.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Oct 27, 2026: $740,000, Apt A307
- Sep 30, 2026: $1,365,000, Apt A712
- Jul 28, 2026: $1,450,000, Apt B1101
- Jul 23, 2026: $925,000, Apt A406
- May 11, 2026: $1,305,000, Apt A1208
- May 8, 2026: $1,425,000, Apt A907
- Jan 16, 2026: $656,500, Apt B401
- Dec 10, 2025: $950,000, Apt B302
- Nov 6, 2025: $870,000, Apt A914
- Jul 23, 2025: $999,000, Apt A313

The 10 most recent of 73 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- THE KALAHARI (City Planning P2005M0123): Completed, decided May 16, 2005. UDAAP & DISPO TO CONSTRUCT APPROX 249 RESD'L UNITS & APPROX\*60,000SF OF COMM'L SPACE ON SITES 32A & 33 IN THE MILBANK\*FRAWLEY CIRCLE WEST URA

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
