# 4 East 98th Street, Manhattan

Parochial School · built c. 1915 · Block 1603, Lot 63.

On Umarelli: https://umarelli.org/nyc/1016030063/4-east-98-street

More construction in Upper East Side: https://umarelli.org/nyc/manhattan/upper-east-side.md

Every lot on block 1603: https://umarelli.org/nyc/manhattan/1603.md

## Building permits

- Alteration, filed Apr 8, 2026, estimated cost $19K, described as “Relocate 16 sprinklker heads on the 7TH floor and install 4 new heads. Relocate 6 heads on 7TH m floor and install 2 new heads”
- Alteration, filed Apr 8, 2026, estimated cost $788K, described as “Interior work to includemodifications to non-load bearing partitions, bathroom alterations, as well as floor and window replacements; select exterior work to masonry.”
- Alteration, filed Mar 10, 2026, estimated cost $20K, described as “Installation of windows. No change to egress, use, or occupancy.”
- Alteration, filed Mar 5, 2025, estimated cost $53K, described as “Installation of split HVAC system with a total capacity of 15 tons on floors 006 and roof. No change to egress, use, or occupancy.”
- Alteration, filed Jun 11, 2024, estimated cost $7K, described as “Replacement of split system on floor 006 and roof with a total capacity of 23000 btus. No change to egress, use, or occupancy.”
- Alteration, filed Jun 27, 2023, estimated cost $201K, described as “Filing for the facade restoration as shown on drawings filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Jun 15, 2023, estimated cost $37K, described as “Installation of split systems on floors 001 through 005, 003 play roof, and 005 mezzanine with a total capacity of 128000 btus/h. No change to egress, use, or occupancy.”
- Alteration, filed Jun 13, 2023, estimated cost $1K, described as “Installation & use of temporary sidewalk shed filed herein. No change in egress use or occupancy.”
- Alteration, filed May 10, 2023, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jul 7, 2022, estimated cost $5K, described as “Installation of diesel generator on the roof, no change in use, egress or occupancy”
- Alteration, filed May 20, 2022, estimated cost $28K, described as “Installation of 2 condenser unit and 4 cassette air handler units with a total capacity of 8 tons. No change to egress, use, or occupancy.”
- Alteration, filed Jan 12, 2021
- Alteration, filed Jan 12, 2021
- Alteration, filed Aug 6, 2020, estimated cost $170K, described as “Air conditioning units replacement on the roof. There will be no change in use, egress or occupancy.”
- Alteration, filed Jul 19, 2018, described as “Installation of heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.”

## Building history

- Alteration, filed Oct 23, 2001, plan exam - disapproved, described as “Construct new rooftop play enclosure as shown on drawings filed herewith.”
- Alteration, filed Aug 29, 1995, signed off Jan 7, 1998, described as “Enlarge existing five story structure in cluding new 6TH floor as shown on drawings filed herewith.”
- Alteration, filed Nov 20, 1992, signed off Mar 14, 1996, described as “There is no work to be performed under this appl. Appl.filed for increased in # of occupants on cellar level only.all construction work was filed &amp; approved under alt.ii appl.on 100453607.(general const.work) and 100208623. Pa 189/64…”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $10,189,800
- Market value (city estimate): $22,644,000
- Taxable value: $0
- Assessed land: $1,413,000
- Assessed improvements: $8,776,800

## Tax breaks

- Nonprofit exemption (school), with no end date, about $1,105,390 a year below the full tax.

## Zoning

R7-2 (part of the lot is R9): floor area ratio 4.62 built, above the 3.44 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Change to an Earlier Grant (Board of Standards and Appeals 150-95-BZ): Change to an Earlier Grant, Withdrawn, filed Nov 19, 2001, decided Jul 9, 2002. Reopening for an amendment to the resolution to permit the construction an outdoor play space on the upper roof of the school building located in a R7-2 & R9(PI) zoning district.
- ST. BERNARD'S SCHOOL (City Planning P1988M0954): Completed. 88-084M: VAR. TO CONSTR. AN ENLARGEMENT WHICH WILL BE INTEGRATED INTO THE EXIST. BLDG. FOR FACILITY EXPANSION.