1170 5th Avenue, Manhattan
Co-op · 60 units · built c. 1926 · Block 1604, Lot 1.
Building permits
- Alteration, filed Dec 27, 2024, estimated cost $3K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Nov 25, 2024, estimated cost $45K, described as “Isolated reinforcement of the existing roof slab per plans.”
- Alteration, filed Sep 12, 2024, estimated cost $4K, described as “Installation of temporary storage of materials as per plans. No change in use, egress or occupancy.”
- Alteration, filed Aug 12, 2024, estimated cost $200K, described as “Work to apartment 4A on the 4TH floor of an existing 15 story + penthouse building. Alterations to include new and relocated partitions. No change to zoning, use, egress, or occupancy under this application.”
- Alteration, filed May 23, 2024, estimated cost $359K, described as “Interior renovation of existing apt. 8B. Work to include non-structural demolition, general construction, and finishes, as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed May 8, 2024, estimated cost $363K, described as “Masonry facade work and roof replacement work as per plans. No change to use, egress, or occupancy.”
- Alteration, filed May 1, 2024, estimated cost $60K, described as “Phb on 20 floor: . Modifications to non-structural partitions, renovate (2) existing bathrooms minor upgrading of finishes, subsequent filing for plumbing to be filed”
- Alteration, filed Apr 26, 2024, estimated cost $1K, described as “Installation of temporary sidewalk shed as per plan. No change in use, egress or occupancy.”
- Alteration, filed Apr 5, 2024, described as “Installation of suspended scaffold for facade work and/or inspection. Amend #1, change in tieback, and added anchor detail.”
- Alteration, filed Feb 15, 2024, estimated cost $60K, described as “Partial renovation of apt 15B on 15TH floor to include exterior window replacement as per plans. No change in use, egress and occupancy this application.”
- Alteration, filed Jun 7, 2022, estimated cost $8K, described as “Herewith file plans to replace and install plumbing fixtures in PHA on the 16 floor. General constructionfiled under #M00738419”
- Alteration, filed Jun 7, 2022, estimated cost $43K, described as “PHA: replace kitchen counter, renovate existing bathroom, add new powder room”
- Alteration, filed Apr 25, 2022, estimated cost $1K, described as “Mechanical work as per plan in conjunction to ot application #M00702865. No change in use, occupancy or egress.”
- Alteration, filed Apr 25, 2022, estimated cost $1K, described as “Plumbing work as per plan in conjunction to ot application #M00702865. No change in use, occupancy or egress.”
- Alteration, filed Apr 4, 2022, estimated cost $251K, described as “Interior renovation of existing apartment #13B on 13 th floor as per plans submitted. No change in use, egress or occupancy.”
- Alteration, filed Jan 13, 2022, estimated cost $261K, described as “Interior renovations to Apt. 10B general construction to include minor partition layout changes and new finishes.. Plumbing filed under separate DOB NOW application #. No change to use, egress or occupancy.”
- Alteration, filed Jan 13, 2022, estimated cost $26K, described as “Herewith file plans to replace and relocate plumbing fixtures in Apt. 10B. GC filed under #M00659333.”
- Alteration, filed Jan 11, 2022, estimated cost $143K, described as “Application filed for an interior renovation to unit 15C that includes new finishes throughout”
- Alteration, filed Jul 7, 2021, estimated cost $18K, described as “Plumbing work in conjunction with interior renovation of APT15B on 15TH floor of an exiting residential building. No change in use, occupancy or egress.”
- Alteration, filed Jul 7, 2021, estimated cost $30K, described as “Interior renovation of APT15B on 15TH floor of an exiting residential building. No change in use, occupancy or egress.”
- Alteration, filed Mar 26, 2021, estimated cost $4K, described as “Penetration through exterior wall of apt. 11c for package air conditioner.”
- Alteration, filed Jan 25, 2018, estimated cost $5K, described as “Installation of a scaffold as per plans during general construction work. No change in use, egress or occupancy. Scaffold to comply with chapter 33 of NYC building code of 2014.”
Property taxes
- Assessment
- $18,271,800
- 2026–27 Tax
- $1,849,411
- Market value (city estimate)
- $40,604,000
- Taxable value
- $17,403,630
- Assessed land
- $954,000
- Assessed improvements
- $17,317,800
Tax breaks
- Co-op and Condo Abatement, with no end date, a $315,894 credit this tax year.
Zoning
R9: floor area ratio 12.13 built, above the 7.52 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Jul 16, 2026: $2,550,000
- Dec 23, 2025: $2,250,000
- Dec 19, 2023: $2,545,625
- Dec 7, 2023: $3,350,000
- Aug 17, 2023: $3,600,000
- Jan 14, 2022: $7,400,000
- Sep 3, 2021: $3,200,000
- Aug 20, 2021: $1,775,000
- Jul 1, 2021: $1,900,000
- Mar 31, 2021: $3,500,000
The 10 most recent of 19 open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of Expanded Carnegie Hill Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.