1470 Madison Avenue, Manhattan
College · built 2012 · Block 1607, Lot 5.
Building permits
- Alteration, filed May 27, 2026, described as “Facade Inspection via Industrial Rope Accesss”
- Alteration, filed Oct 1, 2025, estimated cost $5.0M, described as “Mount Sinai - Hess Data Center Chilled Water Expansion Project Phase 2 - Mechanical modifications on 1st, 3rd, 9th, 11th, and 11th Floor Mezzanine as shown on plans filed herewith. No change in egress, occupancy or use.”
- Alteration, filed May 19, 2025, estimated cost $950K, described as “Herewith filing general construction modifications for Mount Sinai Hess MR-LINAC Phase II Project. No change in use, egress, or occupancy.”
- Alteration, filed Dec 16, 2024, estimated cost $190K, described as “New hydrogen detection system on first floor integrated into the BMS as shown on plans filed herewith. No change to egress, use or occupancy.”
- Alteration, filed Sep 27, 2024, estimated cost $23K, described as “Herewith filing general construction modifications for Mount Sinai Hess Conference Room Enabling Project (Phase 1). No change in use, egress, or occupancy.”
- Alteration, filed Aug 14, 2023, estimated cost $21K, described as “Mount Sinai - Relocation of Fire Hose Cabinet as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Nov 5, 2022, estimated cost $225K, described as “Mount Sinai - Ruttenberg Treatment Center Infusion Expansion - Sprinkler modifications as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Nov 5, 2022, estimated cost $275K, described as “Mount Sinai - Ruttenberg Treatment Center Infusion Expansion - Plumbing modifications as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Nov 5, 2022, estimated cost $850K, described as “Ruttenberg Treatment Center Infusion Expansion - Interior renovations including modifications to non load bearing partitions, ceilings, flooring, doors, and related construction as per plans filed herewith. No change in use, egress, or…”
- Alteration, filed Nov 5, 2022, estimated cost $500K, described as “Mount Sinai - Ruttenberg Treatment Center Infusion Expansion - Mechanical modifications as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Sep 27, 2022, estimated cost $75K, described as “Herewith filing for minor foundation work for stair reinforcement as per plans. No change in use, egress or occupancy.”
- Alteration, filed Nov 8, 2021, estimated cost $110K, described as “Herewith filing for plumbing modifications in the Hess Building for Mount Sinai School of Medicine. No change in use egress or occupancy.”
- Alteration, filed Nov 8, 2021, estimated cost $700K, described as “Herewith filing to provide new chiler, ahu, vav boxes with associated ductwork and piping. New chilled water air handling unit for cooling of the new (medical,electrical) equpment room in the hessbuilding of mount sinai school of medicine.”
- Alteration, filed Nov 8, 2021, estimated cost $30K, described as “Herewith filing for sprinkler modifications in the Hess Building of the Mount Sinai School of Medicine. No change in use, egress, or occupancy.”
- Alteration, filed Nov 1, 2021, estimated cost $290K, described as “Installation of new raised slab on insulation to create level finish floor in sc. Support of new medical equipment on raised slab.installation of supplemental steel to support new mechanical equipment on mezz. No change in use egress or…”
- Alteration, filed Oct 22, 2021, estimated cost $500K, described as “Renovation of Mount Sinai School of Medicine at the SC Level of Hess Building to accommodate MRI&PET-CT & a partial infill at the SC Mezzanine level for Equipment& Mechanical Room to support MRI addition and renovation to accommodate new…”
Building history
- Demolition, filed Jul 18, 2008, signed off Apr 15, 2009, units 1 to 0, stories 1 to 0, described as “Demolition of security building. Aka 19 east 101ST street.”
- Demolition, filed Jul 18, 2008, signed off Apr 13, 2009, units 1 to 0, stories 2 to 0
- New Building — Mid-Rise, filed Dec 20, 2006, signed off Aug 16, 2016, 11 stories
- New Building — Non-residential, filed Sep 26, 1994, permit issued - entire job/work, 2 stories
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $93,991,500
- Market value (city estimate)
- $208,870,000
- Taxable value
- $0
- Assessed land
- $2,933,100
- Assessed improvements
- $91,058,400
Tax breaks
- Nonprofit exemption (hospital), with no end date, about $10,196,198 a year below the full tax.
Zoning
R9: floor area ratio 11.28 built, above the 7.52 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.