1215 5th Avenue, Manhattan
Co-op · 62 units · built c. 1926 · Block 1608, Lot 1.
Building permits
- Alteration, filed Apr 27, 2026, estimated cost $457K, described as “Filing interior renovation to apartment 15C as per plans. Direct replacement of windows. Mechanical and Plumbing scopes to be filed as subsequents. No change in use, egress, or occupancy under this application.”
- Alteration, filed Dec 23, 2025, estimated cost $200K, described as “Interior renovation as shown on plans filed here with”
- Alteration, filed Dec 19, 2025, estimated cost $58K, described as “Filing interior renovation at 5th floor Apartment #5A as per plans with structural filed as a subsequent #M01312123-S1. No change in use, egress, or occupancy under this application.”
- Alteration, filed Jun 10, 2025, estimated cost $56K, described as “Install (2) new chimney liners for fireplaces as per plans. No change in use, occupancy or egress.”
- Alteration, filed Jul 24, 2024, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Apr 11, 2024, estimated cost $4K, described as “Install supported pipe scaffold as shown on the plans. No change in use, egress, or occupancy under this application.”
- Alteration, filed Apr 4, 2024, described as “CD5 renewal”
- Alteration, filed Jan 17, 2024, estimated cost $400K, described as “Interior renovation additional work as per drawings, see page A-110.00 . Work shown in the Addendum involves new ceiling, flooring and wall plaster for Elevator Lobby. All material specified for the lobby renovation has Class A Flame…”
- Alteration, filed Oct 10, 2023, estimated cost $5K, described as “Apartment combination of units 9C and 9D as per plans filed herewith. No change to use, egress nor occupany.”
- Alteration, filed Jul 20, 2023, estimated cost $120K, described as “Interior renovation of apartment phb on 016 floor. No change in use, occupancy or egress.”
- Alteration, filed Jul 3, 2023, described as “Installation of heavy duty sidewalk shed. No change in use, occupancy or egress. Work shall comply with chapter 33 of nycc.”
- Alteration, filed May 4, 2023, estimated cost $500K, described as “Masonry restoration, lintel replacement, and window sill replacement as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Dec 17, 2021, estimated cost $4K, described as “Supported pipe scaffold as shown on the plans. No change in use, egress or occupancy under this application.”
- Alteration, filed Dec 2, 2021, estimated cost $8K, described as “Install a co-axial chimney system for (3) fireplaces.”
- Alteration, filed Dec 2, 2021, estimated cost $2K, described as “Filing for installation of two gas fireplaces.”
- Alteration, filed Jul 22, 2020, estimated cost $5K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed May 11, 2020, estimated cost $200K, described as “Amending plans to show the correct location of the BBQ showing that the location complies with section 623.2.1 of 2014 FGC. No other changes.”
- Alteration, filed May 11, 2020, estimated cost $75K, described as “Mechanical work as per plans”
- Alteration, filed Oct 16, 2019, estimated cost $5K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
Property taxes
- Assessment
- $11,469,150
- 2026–27 tax
- $1,105,718
- Market value (city estimate)
- $25,487,000
- Taxable value
- $10,308,870
- Assessed land
- $589,500
- Assessed improvements
- $10,879,650
Tax breaks
- Co-op and condo abatement, with no end date, a $176,783 credit this tax year.
Zoning
R9: floor area ratio 12.29 built, above the 7.52 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Sep 29, 2026: $2,900,000
- Jul 24, 2026: $770,000
- Jul 8, 2025: $3,335,000
- Dec 14, 2023: $11,044
- Jun 30, 2023: $900,000
- Apr 27, 2023: $16,064
- Jul 26, 2022: $2,999,500
- Jul 20, 2022: $1,537,500
- Jul 19, 2022: $1,130,000
- May 20, 2022: $1,475,000
The 10 most recent of 18 open-market sales since 2016, from the Department of Finance’s sales files.