1249 5th Avenue, Manhattan
Hospital · built c. 1921 · Block 1611, Lot 1.
Building permits
- Alteration, filed Sep 8, 2025, estimated cost $10K, described as “Herewith filing sign application in conjunction with pace entrance per plans. No change in use, occupancy or egress under this application.”
- Alteration, filed Aug 4, 2025, estimated cost $1.2M, described as “Partial removal and installation of walls, doors,ceilings and new finishes as per plans on the main hospital floor 6 of wing 'a'. No change in use, occupancy, or egress under this application”
- Alteration, filed Aug 1, 2025, estimated cost $3.9M, described as “Removal and installation of walls, doors,ceilings and finishes as per plans on the main hospital 3RD flr wing 'a' per plans. No change in use, occupancy or egress under this application.”
- Alteration, filed Jul 24, 2025, estimated cost $293K, described as “Herewith filing for modifications to the 106TH street entrance for pace clinic per plans. No change in use, occupancy or egress under this application.”
- Alteration, filed May 12, 2025, described as “Suspended scaffold outrigger system for facade restoration work with inspections at 1249 5TH avenue, manhattan. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Nov 4, 2024, estimated cost $618K, described as “Facade repair work on 1st -11th Floors and roof on all facades. For facade work only. No change to use egress of occupancy.”
- Alteration, filed Sep 6, 2024, estimated cost $360K, described as “Proposed new and recovery roof replacement as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Mar 11, 2024, estimated cost $2.1M, described as “Herewith filing for interior renovations on the basement & 2ND flr of cohen wing 'c' for pace day-center per plans. No change in use, occupancy or egress under this application.”
- Alteration, filed Mar 11, 2024, estimated cost $1.8M, described as “Herewith filing for interior basement renovations for pace clinic in cohen wing 'c' per plans. No change in use, occupancy or egress under this application.”
- Alteration, filed Mar 8, 2024, estimated cost $624K, described as “Herewith filing for mechanical modifications in conjunction with basement cohen wing 'c' pace clinic renovations per plans.”
- Alteration, filed Mar 5, 2024, estimated cost $63K, described as “Herewith filing for sprinkler modifications in conjunction with basement cohen wing 'c' pace clinic renovations per plans.”
- Alteration, filed Mar 5, 2024, estimated cost $287K, described as “Herewith filing for plumbing work in conjunction with cohen wing 'c' pace clinic renovations.”
- Alteration, filed Mar 1, 2024, estimated cost $348K, described as “Herewith filing for plumbing modifications on the 1ST & 2ND flr in conjunction with cohen wing 'c' pace day center renovations per plans.”
- Alteration, filed Mar 1, 2024, estimated cost $705K, described as “Herewith filing for mechanical modifications on the basement & 2ND flr in conjunction with cohen wing 'c' pace day-center renovations per plans.”
- Alteration, filed Mar 1, 2024, estimated cost $95K, described as “Herewith filing for sprinkler modifications on the basement & 2ND flr in conjunction with cohen wing 'c' pace day center renovations per plans.”
- Alteration, filed Jan 15, 2024, estimated cost $5K, described as “Installation of a heavy duty sidewalk shed as per plans in conjunction with general construction. No change in use, egress or occupancy. Sidewalk shed shall comply with 2022 NYC building code,chapter 33.”
- Alteration, filed Aug 23, 2023, estimated cost $246K, described as “Installation of one temporary emergency 500 KW mobile generator set package, with a 600-gallon integral double wall fuel tank and 42 gallon DEF tank.”
- Alteration, filed Aug 23, 2023, estimated cost $246K, described as “Installation of one temporary emergency 500 KW mobile generator set package, with a 600-gallon integral double wall fuel tank and 42 gallon DEF tank.”
- Alteration, filed Aug 8, 2022, estimated cost $20K, described as “Installation of one Temporary Emergency Generator (Generator Capacity 400kw Prime). which is located on the East 105 street between Madison and 5th avenue.”
- Alteration, filed Jun 27, 2022, estimated cost $4K, described as “Installation of temporary protection over existing pipes at cellar as shown on plans. No change in use, egress or occupancy. Protection shall comply with chapter 33 of NYC building code of 2014.”
- Alteration, filed Mar 9, 2021, estimated cost $55K, described as “Herewith filing for structural work for kitchen relocation in conjunction with alt 2 application 140982248. No change in use, ocucpancy or egress under this application.”
- Alteration, filed Dec 18, 2020, estimated cost $560K, described as “Herewith filing for plumbing work in conjunction with kitchen renovations per plans filed. Meter piping and booster pump filed and approved under application # M00338814.”
- Alteration, filed Dec 16, 2020, estimated cost $504K, described as “Herewith filing for mechanical work in conjunction with kitchen renovations per plans. No change in use, occupancy or egress under this application.”
- Alteration, filed Dec 16, 2020, estimated cost $238K, described as “Herewith filing for sprinkler modifications in conjunction with kitchen renovations per plans.”
- Alteration, filed Dec 1, 2020, estimated cost $5K, described as “Installation of heavy duty sidewalk shed and pipe scaffold as per drawings during general construction work. No change in use, egress, or occupancy. Sidewalk shed and pipe scaffold to comply with chapter 33 of NYC building of 2014.”
13 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $44,597,250
- Market value (city estimate)
- $99,105,000
- Taxable value
- $0
- Assessed land
- $5,580,000
- Assessed improvements
- $39,017,250
Tax breaks
- Nonprofit exemption (hospital), with no end date, about $4,837,910 a year below the full tax.
Zoning
R8 (part of the lot is R9): floor area ratio 7.09 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- Terence Cardinal Cooke - Rezoning (City Planning P2018M0058): Completed, decided Oct 29, 2019. This is a private application by ArchCare requesting a zoning map change from R7-2 to R8 and the mapping of a MIH area to facilitate the renovation of the Flower Hill Hospital Building and the construction of a 2-story Program for All…
- TERENCE CARDINAL COOKE HEALTH CTR. (City Planning P1987M1004): Completed. 87-270M: SPECIAL PERMIT TO CONVERT EXISTING DISABLED SPECIALY HOSPITAL BEDS TO NURSING HOME BEDS.
- T. CARDINAL COOKE HEALTH CENTER (City Planning P2000M0073): Completed, decided May 23, 2000. 86-010M: ALTERATION & RENOVATIONS OF EXISTING BUILDINGS
- TERENCE CARDINAL COOKE HEALTH CNTR (City Planning P1987M0271): Completed, decided May 11, 1988. 86-010M: ALTERATION & RENOVATIONS OF EXISTING BUILDINGS
- T. CARDINAL COOKE HEALTH CARE CTR (City Planning P1985M0440): Completed, decided Aug 13, 1985. 86-010M: ALTERATION & RENOVATIONS OF EXISTING BUILDINGS
- FLOWER HOSPITAL (City Planning P1984M0554): Completed, decided Apr 3, 1984. FIRST MODIFICATION OF SPEC PERMIT TO RELOCATE A NURSING HOME*& HOSPITAL BEDS WITHIN BLDG
- 2-261, 1-47 E106TH ST, 1240-9 5 AV, 1562-78 MADISO (City Planning P1982M0374): Completed, decided Apr 26, 1982. SPEC PERMIT FOR CHANGE OF USE OF EXISTING NON-PROFIT HOSP*TO NON-PROFIT NURSING HOME & SPECIALTY HOSPITAL