Building permits
- Alteration, filed Aug 12, 2026, described as “Sidewalk shed installation in conjunction with nycha bioler replacment job #M00853392. Sidewalk shed is needed during chimney liner installation. No change in use egress or occupancy.”
- Alteration, filed Jun 18, 2026, described as “FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola”
- Alteration, filed Jun 18, 2026, described as “FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola”
- Alteration, filed Dec 11, 2025, estimated cost $50K, described as “Installation of temporary fuel storage tank and associated piping to serve temporary boilers to maintain heat to the development. No change in use, egress, or occupancy.”
- Alteration, filed Nov 18, 2025, estimated cost $1.8M, described as “To be reviewed with Development HUB. Alt II filing for renovation of existing waste yard - demo of existing concrete slab, knee wall ,fences, gates. New concrete slab, knee wall, 8' high fences, gates and new equipment. No change to Use,…”
- Alteration, filed Jul 14, 2025, estimated cost $90K, described as “Lehman village houses, installation of tempboiler stacks, steam, condensate, make-up water piping connected to existing heating plant to provide heat during the heating season in conjunction with DOB # M00853403 . No change in use, egress,…”
- Alteration, filed Jul 14, 2025, estimated cost $25K, described as “Lehman village houses BUILDING#4 installation of temporary gas piping in the boiler room to connect 2 mobile boiler trailers to provide heat during the heating season in conjunction with DOB # M00853411. No change in use, egress, or…”
- Alteration, filed Jan 7, 2025, estimated cost $10K, described as “NYCHA Lehman Village House Building#4 Sidewalk shed installation for temporary boiler connection to exiting building #4 and new liner installation in exiting building #4. No change in use, egress, or occupancy”
- Alteration, filed Dec 24, 2024, estimated cost $20K, described as “Temporary fence construction for staging and temporary boiler area”
- Alteration, filed May 8, 2023, estimated cost $225K, described as “Lehman village boiler upgrade, structural modifications as per plans. No change in use egress or occupancy.”
- Alteration, filed Apr 28, 2023, estimated cost $265K, described as “Lehman village boiler upgrades, architectural modifications as per plans. No change in use egress or occupancy.”
- Alteration, filed Apr 24, 2023, estimated cost $111K, described as “Lehman village boiler demolition.”
- Alteration, filed Apr 21, 2023, estimated cost $2.4M, described as “Lehman village boiler installation of 4 new boilers.”
- Alteration, filed Apr 21, 2023, estimated cost $600K, described as “Lehman village boiler upgrades, plumbing modifications as per plans. No change in use egress or occupancy.”
- Alteration, filed Apr 21, 2023, estimated cost $2.8M, described as “Lehman boiler upgrade, mechanical modifications for said scope as per plans. No change in use egress or occupancy.”
Building history
- Major Renovation — Conversion, filed Feb 13, 1996, signed off Jan 19, 2001, 154 units added, 20 stories, described as “Enlarge & renovate ex'g.community center.demolish & remove walls partitions,floor & ceiling finishes,as required.construct,one story addition & renovate ex'g.with new walls and partition,floor and ceiling finishes.”
- New Building, filed Apr 20, 1995, permit issued - entire job/work, 1 story
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $14,062,500
- Market value (city estimate)
- $31,250,000
- Taxable value
- $0
- Assessed land
- $6,435,000
- Assessed improvements
- $7,627,500
Zoning
R7-2: floor area ratio 1.63 built, 3.44 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, moderate risk: a 0.2% chance of flooding each year.
Board and land use applications
- Harlem East Harlem Urban Renewal Plan Amendment (City Planning 2020M0408): Completed, decided Mar 2, 2021. HPD seeks an extension to the existing East Harlem Urban Renewal Plan which is set to expire in December 2020.