# 1539 Lexington Avenue, Manhattan

Apartment Building · 225 units · built 1951 · Block 1626, Lot 21.

On Umarelli: https://umarelli.org/nyc/1016260021/1539-lexington-avenue

More construction in East Harlem: https://umarelli.org/nyc/manhattan/east-harlem.md

Every lot on block 1626: https://umarelli.org/nyc/manhattan/1626.md

## Building permits

- Alteration, filed Sep 17, 2025, estimated cost $10K, described as “Installation of pipe scaffold at 183 east 98 street, manhattan, ny 10029 as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Sep 17, 2025, estimated cost $10K, described as “Installation of pipe scaffold at 1539 lexington avenue, manhattan, ny 10029 as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Sep 17, 2025, estimated cost $10K, described as “Installation of temporary sidewalk shed at 183 east 98 street, manhattan, ny 10029 as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Sep 17, 2025, estimated cost $10K, described as “Installation of temporary sidewalk shed at 1539 lexington avenue, manhattan, ny 10029 as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Sep 17, 2025, estimated cost $10K, described as “Installation of temporary construction fence at 183 east 98 street, manhattan, ny 10029 as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Sep 17, 2025, estimated cost $10K, described as “Installation of temporary construction fence at 1539 lexington avenue, manhattan, ny 10029 as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Aug 7, 2025, described as “Suspended scaffold outrigger system for exterior facade restoration work at 183 east 98 street, manhattan, ny 10029.”
- Alteration, filed Aug 7, 2025, described as “Suspended scaffold outrigger system for exterior facade restoration work at 1539 lexington avenue,manhattan, ny 10029.”
- Alteration, filed May 29, 2025, described as “Suspended scaffold outrigger system for exterior facade restoration work and inspection at 183 east 98 street, manhattan”
- Alteration, filed May 29, 2025, described as “Suspended scaffold outrigger system for exterior facade restoration work and inspection at 1539 lexington avenue, manhattan”
- Alteration, filed May 27, 2025, estimated cost $100K, described as “Installation of temporary construction fence at 183 east 98TH street, manhattan, ny 10029 as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed May 27, 2025, estimated cost $100K, described as “Installation of new sidewalk shed at 183 east 98TH street, manhattan, ny 10029 as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed May 27, 2025, estimated cost $100K, described as “Installation of temporary construction fence at 1539 lexington avenue, manhattan, ny 10029 as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed May 27, 2025, estimated cost $100K, described as “Installation of new sidewalk shed at 1539 lexington avenue, manhattan, ny 10029 as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Nov 13, 2024, described as “FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola”
- Alteration, filed Nov 13, 2024, described as “FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola”
- Alteration, filed Aug 7, 2024, estimated cost $2.7M, described as “Providing roofing replacement, parapet replacement including 14th floor exterior facade work from 14th floor lintel to roof level rooftop structure repairs and 2nd floor work on entrance canopy roofing. Replace rooftop terrace roofing. No…”
- Alteration, filed Aug 7, 2024, estimated cost $1.8M, described as “Providing roofing replacement, parapet replacement including 14th floor exterior facade work from 14th floor lintel to roof level and rooftop structure repairs and entrance canopy roofing.. no change in use, egress or occupancy under this…”
- Alteration, filed Jan 22, 2020, estimated cost $2K, described as “New Mechanical System in conjunction with Alteration Type 2 Job #140883079”
- Alteration, filed Jan 22, 2020, estimated cost $1K, described as “Plumbing work in conjunction with Alteration type 2 Job #140883079”

## Property taxes

- Assessment: $15,588,000
- Market value (city estimate): $34,640,000
- Taxable value: $0
- Assessed land: $1,800,000
- Assessed improvements: $13,788,000

## Zoning

R7-2: floor area ratio 2.62 built, 3.44 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.