# 1505 Park Avenue, Manhattan

Apartment Building · 280 units · built 1963 · Block 1637, Lot 1.

On Umarelli: https://umarelli.org/nyc/1016370001/1505-park-avenue

More construction in East Harlem: https://umarelli.org/nyc/manhattan/east-harlem.md

Every lot on block 1637: https://umarelli.org/nyc/manhattan/1637.md

## Building permits

- Alteration, filed Nov 16, 2026, estimated cost $260K, described as “Proposing a new music room in the existing office space located on the mezzanine level. No change of use, egress, or occupancy is proposed under this application”
- Alteration, filed Nov 18, 2025, estimated cost $1.8M, described as “Site yard work with 8' high enclosing fence and gates as per plans filed herewith. No change to use, egress or occupancy. Application to be reviewed with the development hub.”
- Alteration, filed Jan 15, 2025, estimated cost $582K, described as “NYCHA Clinton Houses Building #1: Proposed subsurface sow-release/detention for collection of rainwater. Existing stormwater system to be modified resulting in no changes to sanitary or combined sewer. All as per plans filed herewith.”
- Alteration, filed Jun 7, 2024, estimated cost $1.8M, described as “Facade repair”
- Alteration, filed Jun 7, 2024, estimated cost $1.8M, described as “Facade repair work”
- Alteration, filed Apr 28, 2024, described as “FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola”
- Alteration, filed Apr 28, 2024, described as “FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Kenneth Cole”
- Alteration, filed Mar 19, 2024, described as “Suspended scaffold outrigger system for material hoist and hanging platform for restoration work at 1505 park avenue, manhattan, ny 10029”
- Alteration, filed Mar 16, 2024, described as “Material hoist system at 120 east 110 street, manhattan”
- Alteration, filed Mar 6, 2024, described as “Suspended scaffold outrigger system on facad repair work at 1760 lexington avenue, manhattan.”
- Alteration, filed Jan 10, 2024, estimated cost $10K, described as “Installation of new sidewalk shed at 120 east 110 street manhattan as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Oct 5, 2023, estimated cost $10K, described as “Installation of pipe scaffold at 120 east 110TH street, manhattan as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Oct 5, 2023, estimated cost $10K, described as “Installation of pipe scaffold at 1760 lexington avenue manhattan as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Oct 5, 2023, estimated cost $10K, described as “Installation of pipe scaffold at 1505 park ave, manhattan as indicated on plans. There will be no change in the use, egress, or occupancy under this application”
- Alteration, filed Oct 4, 2023, estimated cost $10K, described as “Installation of new sidewalk shed at 1760 lexington ave, manhattan, as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Oct 4, 2023, estimated cost $10K, described as “Installation of temporary construction fence at 120 east 110TH street, manhattan, ny 10029 as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Oct 4, 2023, estimated cost $10K, described as “Installation of temporary construction fence at 1760 lexington avenue, manhattan as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Oct 4, 2023, estimated cost $10K, described as “Installation of temporary construction fence at 1505 park avenue, manhattan, ny 10029 as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Oct 4, 2023, estimated cost $10K, described as “Installation of new sidewalk shed at 1505 park avenue, manhattan as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Apr 25, 2022, estimated cost $14K, described as “Structural work to repair cracks at the roof existing stair/elevator bulkhead. Install new base plates for steel beams. Provide temporaty support at existing steel dunnage.”
- Alteration, filed Apr 25, 2022, estimated cost $22K, described as “Structural work to repair the roof stair/elevator bulkhead”
- Alteration, filed Apr 25, 2022, estimated cost $167K, described as “Remove and replace existing roof assembly as noted on drawings provided. No change to use, egress or occupancy.”
- Alteration, filed Apr 22, 2022, estimated cost $186K, described as “Remove and replace existing roof assembly as noted on drawings provided. No change touse, egress or occupancy.”
- Alteration, filed Apr 22, 2022, estimated cost $186K, described as “Remove and replace existing roof assembly as noted on drawings provided. No change to use, egress or occupancy.”
- No Work, filed May 20, 2020

4 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1016370001/1505-park-avenue.

## Property taxes

- Assessment: $13,764,600
- Market value (city estimate): $30,588,000
- Taxable value: $0
- Assessed land: $1,350,000
- Assessed improvements: $12,414,600

## Zoning

R7-2 (part of the lot is C8-4): floor area ratio 3.64 built, above the 3.44 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, moderate risk: a 0.2% chance of flooding each year.

## Board and land use applications

- Harlem East Harlem Urban Renewal Plan Amendment (City Planning 2020M0408): Completed, decided Mar 2, 2021. HPD seeks an extension to the existing East Harlem Urban Renewal Plan which is set to expire in December 2020.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology