# 2095 2nd Avenue, Manhattan

Public school · built 1958 · Block 1656, Lot 100.

On Umarelli: https://umarelli.org/nyc/1016560100/2095-2-avenue

More construction in East Harlem: https://umarelli.org/nyc/manhattan/east-harlem.md

Every lot on block 1656: https://umarelli.org/nyc/manhattan/1656.md

## Building permits

- Alteration, filed Jul 25, 2025, estimated cost $1.5M, described as “Installation of photovoltaic solar array on roof including all related structural work asper plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Sep 3, 2024, estimated cost $210K, described as “The scope of work includes the installation of the supplemental cooling systems for the weight rooms.”
- Alteration, filed Apr 23, 2024, estimated cost $540K, described as “The scope of work includes the installation of the supplemental cooling systems for the gymnasium.”
- Alteration, filed Mar 28, 2024, estimated cost $390K, described as “The scope of work includes the installation of the supplemental cooling systems for the auditorium.”
- Alteration, filed Dec 29, 2021, estimated cost $20K, described as “PS117M- for temporary construction equipment (emergency ramp design for boiler support)submitting on behalf of contractor, in conjunction with DOB: M00604050 LLW#128239. No change in use,occupancy or egress”
- Alteration, filed Oct 4, 2021, estimated cost $25K, described as “Jhs 117M, installation of emergency +/- 102 linear feet of temporary 8 feet high chain link fence and +/- 527.5 linear feet of sidewalk shed (llw # 128239) in conjunction with DOB#M00604050-be and M00604050-ms. No change in use, egress, or…”
- Alteration, filed Feb 25, 2021, estimated cost $450K, described as “The scope of work includes the replacement of the existing fueloil burners with natural gas burners. Work includes but is notlimited to: new: control panels, breeching,chimney liner, unit heater, gas leak detection, gaspiping, gas booster,…”

## Property taxes

- Assessment: $14,044,950
- Market value (city estimate): $31,211,000
- Taxable value: $0
- Assessed land: $3,514,500
- Assessed improvements: $10,530,450

## Zoning

R7-2: floor area ratio 1.28 built, 3.44 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 13 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 12 ft (NAVD88).

## Board and land use applications

- Harlem East Harlem Urban Renewal Plan Amendment (City Planning 2020M0408): Completed, decided Mar 2, 2021. HPD seeks an extension to the existing East Harlem Urban Renewal Plan which is set to expire in December 2020.
- East Harlem Neighborhood Rezoning (City Planning P2017M0088): Completed, decided Dec 5, 2017. The New York City Department of City Planning (DCP), together with the Department of Housing Preservation and Development (HPD), is proposing a series of land use actions -including zoning map amendments, zoning text amendments, and…

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
