2017 1st Avenue, Manhattan
College · built 2022 · Block 1675, Lot 30.
Building permits
- Alteration, filed May 7, 2024, estimated cost $2K, described as “Install exterior banner sign”
- Alteration, filed Apr 16, 2024, estimated cost $2K, described as “Install non-illuminated banner sign on wall at existing school (east harlem scholars)”
- Alteration, filed Apr 16, 2024, estimated cost $2K, described as “Install non-illuminated banner sign on wall at existing school (east harlem scholars)”
- Alteration, filed Apr 16, 2024, estimated cost $2K, described as “Install non-illuminated banner sign on wall at existing school (east harlem scholars)”
- Alteration, filed Apr 16, 2024, estimated cost $2K, described as “Install non-illuminated banner sign on wall at existing school (east harlem scholars)”
- Alteration, filed Apr 16, 2024, estimated cost $2K, described as “Install non-illuminated banner sign on wall at existing school (east harlem scholars)”
- Alteration, filed Jun 12, 2023, estimated cost $1K, described as “Suspended Hanging Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy”
- Alteration, filed Feb 2, 2023, estimated cost $125K, described as “Herewith filing new boiler for new building job #121207693”
- Alteration, filed Feb 1, 2023, estimated cost $990K, described as “Herewith filing for general construction work as indicated on plans. Filing for ramp & outside wall. No change to egress use or occupancy”
- No Work, filed Jan 25, 2022
- No Work, filed Jan 10, 2022
- No Work, filed Jan 10, 2022
- No Work, filed Jan 10, 2022
- Alteration, filed Aug 12, 2021, estimated cost $5K, described as “Installation of pipe scaffolding as per plans during construction. No change in use, egress or occupancy. Pipe scaffolding shall comply with chapter 33 of NYC building code of 2014.”
- Alteration, filed May 26, 2021, estimated cost $10K, described as “Installation of 7000 lb single personnel/material hoist car as per plans during construction. No change in use, egress or occupancy.”
- Alteration, filed Feb 11, 2021, estimated cost $3K, described as “Herewith filing of Standpipe application for the installation of a Temporary Air Pressurized Standpipe Alarm System for a NEW BUILDING Application #:121207693 as per Local Law 64/2009”
- Alteration, filed Jan 11, 2021, estimated cost $1K, described as “Filing herewith for installtion of test piles in order to perform load test as per plans.filed in conjunction with new building application #121207693. No change in use, egress oroccupancy.”
- Alteration, filed Aug 26, 2020, estimated cost $3K, described as “Installation of construction fence on top of plastic jersey barriers.”
- Alteration, filed May 6, 2020, estimated cost $3K, described as “Herewith filing superstructure in conjunction with new building application”
- Alteration, filed Apr 30, 2020, estimated cost $3K, described as “New sprinkler and standpipe system in conjunction with new building”
- Alteration, filed Apr 30, 2020, estimated cost $3K, described as “Herewith filing for new mechanical systems in conjunction with NB. Installation of air conditioning and ventilation roof top units. Installation of perimeter heating boilers and fin tube distribution. Installation of split system cooling…”
- Alteration, filed Apr 30, 2020, estimated cost $3K, described as “Herewith filing for new plumbing systems as per plans”
- Alteration, filed Apr 29, 2020, estimated cost $3K, described as “Site civil plumbing work in conjunction with new building”
- Alteration, filed Apr 22, 2020, estimated cost $1K, described as “Installation of support scaffold in accordance with nycc 2014 chapter 33. No change in egress, use, or occupancy.”
- Alteration, filed Mar 26, 2020, estimated cost $1K, described as “Installation of sidewalk shed during new building construction in accordance with nycc 2014 chapter 33 building code. No change in egress, use, or occupancy.”
1 more, older permit is in this building’s full list on the map.
Property taxes
- Assessment
- $12,744,000
- 2026–27 tax
- $1,359,623
- Market value (city estimate)
- $28,320,000
- Taxable value
- $12,533,400
- Assessed land
- $3,319,650
- Assessed improvements
- $9,424,350
Zoning
R7A (part of the lot is R8A): floor area ratio 3.83 built, 4.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 13 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 12 ft (NAVD88).
Board and land use applications
- Variance or special permit (Board of Standards and Appeals 2020-61-BZ): Variance or special permit, Granted, filed Jul 21, 2020, decided Feb 8, 2021. Variance (§72-21) to permit the development of a school (UG 3) (East Harlem Scholars Academy Charter School) contrary to underlying bulk requirements. R7A, C2-5/R8A zoning districts.