# 2141 1st Avenue, Manhattan

Utility · Block 1682, Lot 11.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/1016820011/2141-1-avenue

More construction in East Harlem: https://umarelli.org/nyc/manhattan/east-harlem.md

Every lot on block 1682: https://umarelli.org/nyc/manhattan/1682.md

## Building permits

- Alteration, filed Nov 24, 2026, estimated cost $150K, described as “Removal and installation of interior partitions, ceilings, and doors.”
- Alteration, filed Oct 5, 2026, estimated cost $200K, described as “Replace perimeter fence as per plans. No change in use, egress, or occupancy.”
- Alteration, filed Nov 18, 2025, estimated cost $1.4M, described as “Filing herewith for the new closing garage bay doors in front of existing doors to remain tominimize energy losses. Roof details for new mechanical penetrations, minor roofing work. Patch existing wall assembly as a result of the…”

## Zoning

M1-4: floor area ratio 0.00 built, 2.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 13 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 12 ft (NAVD88).

## Board and land use applications

- Harlem East Harlem Urban Renewal Plan Amendment (City Planning 2020M0408): Completed, decided Mar 2, 2021. HPD seeks an extension to the existing East Harlem Urban Renewal Plan which is set to expire in December 2020.