## Building permits

- Alteration, filed Jun 8, 2022, estimated cost $750K, described as “Furnish and install eight (8) grit pumps with new 6" pump suction & discharge.furnish and install two (2) grit channel dewatering pumps provide two (2) adjustable rolling knock down steel gantry cranes in conjunction with job# 140875916.”
- Alteration, filed Jan 9, 2020, estimated cost $1.8M, described as “Replace 10 process pumps and related controls. All work is interior to the building.”
- Alteration, filed Aug 23, 2019, estimated cost $93K, described as “Install foundations for stop logs at 6 exterior egress doors, 3 exterior roll-up doors, and flood protection assemblies at 2 egress doors. No change to occupancy, use or egress.”

## Building history

- Alteration, filed Dec 21, 2012, permit issued - entire job/work, described as “No workperformed under this appliation allwork performed under permit APPLICATION#103297521 this application is toobtain a certificate of occupancy only”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Zoning

R7-2: floor area ratio 0.00 built, 3.44 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 13 ft (NGVD29).

## Board and land use applications

- Harlem East Harlem Urban Renewal Plan Amendment (City Planning 2020M0408): Completed, decided Mar 2, 2021. HPD seeks an extension to the existing East Harlem Urban Renewal Plan which is set to expire in December 2020.