545 East 116th Street, Manhattan
Parking · built 2007 · Block 1715, Lot 22.
Building permits
- No Work, filed Aug 4, 2026, described as “Tpa request for the east river plaza family fun day, 2:00 pm 6:30 pm, max 400 people, 4 fg's.”
- Alteration, filed Apr 18, 2026, described as “IRA to assist with Condition Assessment”
- Alteration, filed Jan 14, 2025, estimated cost $1K, described as “Installation of temporary sidewalk shed as per plan. No change in use, egress or occupancy. The sidewalk shed is at fdr drive and east 61TH street elevations.”
- Alteration, filed Nov 27, 2024, described as “Installation of suspended scaffold for facade work and/or inspection. Amend #3, Added scaffold drops and outrigger beam details”
- Alteration, filed May 22, 2024, estimated cost $85K, described as “Facade repair/ maintenance 1 floor thru 6th floor and roof.”
Building history
- New Building — Non-residential, filed Feb 15, 2006, permit issued - entire job/work, 7 stories
- Demolition, filed Mar 11, 1999, signed off Apr 7, 2006, stories 5 to 0
- Demolition, filed Mar 5, 1999, signed off Apr 6, 2006, stories 2 to 0
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $31,821,750
- 2026–27 Tax
- $1,221,882
- Market value (city estimate)
- $70,715,000
- Taxable value
- $11,252,250
- Assessed land
- $3,316,950
- Assessed improvements
- $28,504,800
Tax breaks
- ICAP/ICIP exemption, through Jun 30, 2033, about $2,231,379 a year below the full tax.
Zoning
C4-4: floor area ratio 6.70 built, above the 3.44 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 13 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 12 ft (NAVD88).
Board and land use applications
- Harlem East Harlem Urban Renewal Plan Amendment (City Planning 2020M0408): Completed, decided Mar 2, 2021. HPD seeks an extension to the existing East Harlem Urban Renewal Plan which is set to expire in December 2020.
- EAST RIVER PLAZA (City Planning P2007M0355): Completed, decided Nov 15, 2007. RENEWAL OF A SPECIAL PERMIT FOR ACCESSORY PARKING WITH A*MAXIMUM CAPACITY FOR 1248 VEHICLES; Additional Other #(s): 090099B
- EAST RIVER PLAZA (City Planning P1998M0387): Completed, decided Dec 19, 2006. SHORTEN E117TH ST & E118TH STS, & WIDEN THE FDR DRIVE TO*DEVELOP A MULTI-LEVEL RETAIL CENTER
- EAST RIVER PLAZA (City Planning P2004M0378): Completed, decided Jul 14, 2006. RENEWAL OF C990100ZSM FOR AN ACCESSORY PARKING WITH A MAX*CAPACITY FOR 1,248 VEHICLES