Apartment building · 108 units · built 2025 · Block 1723, Lot 17.
Building permits
- New Building — Tower, filed Mar 21, 2022, estimated cost $50.0M, 180 units, 21 stories, described as “Proposed 21-story mixed-use building w/ 180 d.u. & commercial store at ground floor level”
- Alteration, filed Mar 27, 2026, estimated cost $4K, described as “Installation of temporary overhead protection as per plans. No change in use, egress or occupancy.”
- Alteration, filed Mar 18, 2026, described as “Suspended Scaffold Installation for Facade Restoration and Inspection”
- Alteration, filed Oct 27, 2025, described as “Installation of temporary engineered enclosure system as per plans. No change in use, egress or occupancy.”
- Alteration, filed Oct 22, 2025, estimated cost $6K, described as “Installation of temporary needle beam as per plans. No change in use, egress or occupancy.”
- Alteration, filed Oct 13, 2025, described as “Installation of temporary pipe & system scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 10, 2025, estimated cost $6K, described as “Installation of temporary personnel hoist as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 2, 2025, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Aug 28, 2025, estimated cost $4K, described as “Installation of temporary roof protection as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jul 9, 2025, estimated cost $1K, described as “Installation of temporary loading platforms during construction”
- Alteration, filed Mar 8, 2025, estimated cost $1K, described as “Install Emergency Generator on second floor roof terrace”
- Alteration, filed Feb 3, 2025, estimated cost $5K, described as “Installation of a heavy duty sidewalk shed and medium duty pipe scaffold as per plans during general construction work. No change in use, egress or occupancy. Sidewalk shed and pipe scaffold shall comply with 2022 NYC building code,…”
- Alteration, filed Jan 30, 2025, estimated cost $5K, described as “Installation of a heavy duty sidewalk shed and medium duty pipe scaffold as per plans during general construction work. No change in use, egress or occupancy. Sidewalk shed and pipe scaffold shall comply with 2022 NYC building code,…”
- Demolition, filed Mar 21, 2024, estimated cost $25K, described as “Full Demolition of Existing Five story Building. Filing to correct summons #39536732Y & 39535117H”
- Alteration, filed Jan 31, 2023, estimated cost $5K, described as “Installation of 300 psf sidewalk shed as per plans. Sidewalk shed shall comply with chapter #33 of the NYC code. No change in use, egress or occupancy under this application.”
- Alteration, filed Jan 31, 2023, estimated cost $5K, described as “Installation of 300 psf sidewalk shed as per plans. Sidewalk shed shall comply with chapter #33 of the NYC code. No change in use, egress or occupancy under this application.”
- Alteration, filed Jan 16, 2023, estimated cost $5K, described as “Install plywood construction fence to protect site during demolition operations as per application #123914292”
- Alteration, filed Oct 20, 2022, estimated cost $10K, described as “Proposed to cap and remove sprinkler system in conjunction with full demo job # 123914292. No change to use, egress or occupancy under this application.”
- Alteration, filed May 6, 2022, estimated cost $1K, described as “Installation of temporary wood fence as per MEA#279-895 in conjunction with NB app# M00671589-I1”
- Alteration, filed Apr 8, 2022, estimated cost $3K, described as “8' Construction Fence”
- Alteration, filed May 13, 2021, estimated cost $5K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed May 7, 2021, estimated cost $5K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed May 5, 2021, described as “Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Sep 17, 2020, estimated cost $2K, described as “Install illuminated wall sign ((logo) rite aid)”
- Alteration, filed Sep 17, 2020, estimated cost $350, described as “Install illuminated wall sign ( pharmacy)”
Property taxes
- Assessment
- $672,300
- 2026–27 tax
- $68,178
- Market value (city estimate)
- $1,494,000
- Taxable value
- $548,100
- Assessed land
- $672,300
Zoning
C4-7: floor area ratio 13.85 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- Harlem East Harlem Urban Renewal Plan Amendment (City Planning 2020M0408): Completed, decided Mar 2, 2021. HPD seeks an extension to the existing East Harlem Urban Renewal Plan which is set to expire in December 2020.
In the news
Permits Filed for 35 West 125th Street in Harlem, Manhattan, New York YIMBY, Mar 25, 2022.