506 Lenox Avenue, Manhattan
Hospital · built 2009 · Block 1734, Lot 1.
Building permits
- Alteration, filed Nov 5, 2026, estimated cost $900K, described as “HHC Sim Lab: Modification of interior partitions and finishes to accommodate alterations to the Sim Lab within the existing hospital building as per plans.”
- Alteration, filed May 1, 2026, estimated cost $3K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Apr 28, 2026, estimated cost $25K, described as “Installation of steel support for rooftop antenna. No change to egress use or occupancy”
- Alteration, filed Jan 13, 2026, estimated cost $144K, described as “G herewith for installation of permanent chainlink fence to protect vacant lot as required by the NYC charter section 2904. No change in use, egress or occupancy.”
- Alteration, filed Jul 16, 2025, estimated cost $10K, described as “Installation of new special service sprinkler booster pump, jockey pump, fire pump test header and additional floor control valves as per plans submitted herewith, no change in use, egress or occupancy group.”
- Alteration, filed Oct 23, 2024, estimated cost $4K, described as “Installation of temporary working platform as per plans. No change in use, egress or occupancy.”
- Alteration, filed Oct 14, 2024, estimated cost $7.0M, described as “This application is filed for the installation of new sprinklers.”
- Alteration, filed Oct 10, 2024, estimated cost $5K, described as “Temporary scaffold stair tower as per drawings. Scaffold stair tower shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Sep 30, 2024, estimated cost $4.0M, described as “Installation of mechanical piping for the 3 new boilers in the cellar.”
- Alteration, filed Sep 4, 2024, estimated cost $7.0M, described as “Replacement of machine support pads and slab-on-grade at cellar level.”
- Alteration, filed Sep 4, 2024, estimated cost $7.0M, described as “Modifications to the natural gas piping system at cellar level to support new boilers, installing new compressed air systems, and removing existing bathroom pipes. Additionally, new domestic water and sanitary piping will be installed, and…”
- Alteration, filed Nov 7, 2023, estimated cost $50K, described as “Installation of (2) temporary emergency boilers”
- Alteration, filed Oct 4, 2023, estimated cost $1.5M, described as “Contractor to remove all steam, water and condensate piping,equipment, ductwork, air outlets, etc, within the boiler room and is notactive or to be reutilized.”
- Alteration, filed Oct 4, 2023, estimated cost $100K, described as “Installation of (2) 1,000 HP temporary boilers and condensate storage tank”
- Alteration, filed Sep 28, 2023, estimated cost $1.5M, described as “Removal of all inactive steam, water and condensate piping, equipment, ductwork, air outlets within the boiler room.”
- Alteration, filed Sep 12, 2023, estimated cost $50K, described as “Installation of temporary boiler trailers. Oil and gas connection by others under separate applications.”
- Alteration, filed Sep 12, 2023, estimated cost $2K, described as “Connect existing gas to temporary gas/oil burners in temporary mobile trailers during house boiler plant renovation.”
- Alteration, filed Aug 24, 2023, estimated cost $50K, described as “Installation of (2) temporary emergency boilers”
- Alteration, filed Aug 10, 2023, estimated cost $50K, described as “Installation of two (2) temporary boilers.”
- Alteration, filed Feb 10, 2023, estimated cost $1.7M, described as “Replace 500 linear ft of condenser pipes with new. See Comments for PAA 1”
- Alteration, filed Dec 14, 2022, estimated cost $50K, described as “Remove 2 AC units - first floor (PAA filed to correct asbestos section - see comments)”
- Alteration, filed Dec 14, 2022, estimated cost $150K, described as “MDF Phase 2: Install new DX unit”
- Alteration, filed Oct 7, 2022, described as “Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Sep 28, 2022, estimated cost $25K, described as “Minor interior demolition, removal of equipment for new UPS-B room (PAA filed to correct asbestos section -see comments)”
- Alteration, filed Aug 12, 2022, estimated cost $15K, described as “Installation of a new blood filtration system with a new 3/4" secondary rpz backflow and related piping. Work on 2nd and 3rd floors as per plans filed herewith.”
34 more, older permits are in this building’s full list on the map.
Building history
- Demolition, filed Oct 6, 2020, signed off May 16, 2022, stories 9 to 0
- Demolition, filed Jun 25, 2020, signed off Aug 10, 2021, stories 1 to 0, described as “Full demolition of one story structure using mechanical means as per plans filed herewith.”
- Demolition, filed Jan 7, 2020, signed off Apr 21, 2021, stories 5 to 0
- Demolition, filed Jan 7, 2020, application processed - no plan exam, stories 1 to 0, described as “Demolition of 1 story structure utilizing cat 345 or equivalent with demo attachments, volvo 700 with demo attachments, cat 973 or equivalent and bobcat S300.”
- Alteration, filed Apr 3, 2019, permit issued - entire job/work, described as “5 floor change of use from vacant to construct new outpatient clinic. Construction consists of offices, consult room, exam rooms and administrative support spaces”
- Alteration, filed Apr 26, 2012, permit issued - entire job/work, described as “1ST floor alterations to accommodate the new emergency department in the ron brown building. Create new openings to connect to the adjacent hospital building, located on the same lot under same owneship. Refer to NB 104775156 for the…”
- Alteration, filed Jan 30, 2012, signed off Aug 9, 2013, described as “Application filed in conjunction with NB#100641049 for the purpose of securing sign-offs and final certificate of occupancy only for the ron brown pavilion.”
- Demolition, filed Sep 24, 2009, signed off Mar 3, 2011, units 1 to 0, stories 8 to 0, described as “Demolition of eight story nurses residence.”
- New Building — Non-residential, filed May 24, 2007, signed off Aug 28, 2013, 7 stories
- Alteration, filed May 12, 2006, signed off Jul 12, 2011, described as “Proposed new open accessory parkinglot for 128 cars accessory to existing hospital. All as per plansfiled herewith.”
The 10 most recent of 15 new buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $214,086,150
- Market value (city estimate)
- $475,747,000
- Taxable value
- $0
- Assessed land
- $16,259,393
- Assessed improvements
- $197,826,757
Zoning
R7-2: floor area ratio 8.79 built, above the 3.44 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- ALMA RANGEL GARDENS (City Planning P1999M0284): Completed, decided Sep 9, 1999. UDAAP & LDA TO CONSTRUCT A 6-STORY BLDG WITH 89 UNITS FUNDED*BY FEDERAL SECT 202 SUPPORTIVE HOUSING FOR THE ELDERLY