# 700 Esplanade Gdns Plaza, Manhattan

Co-op · 584 units · built 1966 · Block 1744, Lot 1.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/1017440001/700-esplanade-gdns-plaza

More construction in Harlem: https://umarelli.org/nyc/manhattan/harlem.md

Every lot on block 1744: https://umarelli.org/nyc/manhattan/1744.md

## Building permits

- Alteration, filed Oct 26, 2026, described as “FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola”
- Alteration, filed Oct 26, 2026, described as “FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola”
- Alteration, filed Jul 31, 2025, described as “Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.”
- Alteration, filed Oct 19, 2023, estimated cost $93K, described as “Install temporary above ground outdoor steaming piping insulated with cover from building #5 (720) to building #6 (700) due to underground steam leak. No change in means of egress, use group or occupancy.”
- Alteration, filed Feb 25, 2021, estimated cost $196K, described as “Replacement of underground steam piping located outside building in parking lot area.”
- Alteration, filed Sep 3, 2020, estimated cost $98K, described as “Replacement of sanitary and storm piping at ceiling of first floor”
- Alteration, filed Sep 3, 2020, estimated cost $98K, described as “Replacement of existing sanitary and storm piping at ceiling of first floor”
- Alteration, filed Apr 24, 2019, estimated cost $375K, described as “Installation of scaffold as per drawings. Scaffold shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Feb 13, 2019, estimated cost $375K, described as “Installation of scaffold as per drawings. Scaffold shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Jan 24, 2019, estimated cost $80K, described as “Installation of heavy duty sidewalk shed during building alteration, filed separately. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Jan 24, 2019, estimated cost $80K, described as “Installation of heavy duty sidewalk shed during building alteration, filed separately. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”

## Property taxes

- Assessment: $30,855,150
- 2026–27 Tax: $574,213
- Market value (city estimate): $68,567,000
- Taxable value: $0
- Assessed land: $3,150,450
- Assessed improvements: $27,704,700

## Tax breaks

- Mitchell-Lama exemption, with no end date.

## Zoning

R8 (part of the lot is R7-2): floor area ratio 2.38 built, 6.02 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NGVD29).

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
