# 1839 Madison Avenue, Manhattan

Public School · built 1962 · Block 1747, Lot 1.

On Umarelli: https://umarelli.org/nyc/1017470001/1839-madison-avenue

More construction in Harlem: https://umarelli.org/nyc/manhattan/harlem.md

Every lot on block 1747: https://umarelli.org/nyc/manhattan/1747.md

## Building permits

- Alteration, filed Oct 30, 2026, estimated cost $85K, described as “Construction of 4 new 40 feet tall light poles around an existing park at Eugene McCabe Filed.”
- Alteration, filed Aug 31, 2026, estimated cost $886K, described as “Installation of photovoltaic solar array on roof incluing allrelated structural work as per plans filed herewith. No changeto use, egress or occupancy.”
- Alteration, filed Aug 20, 2026, estimated cost $7K, described as “Temporary system scaffold as per drawings. System scaffold shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Sep 5, 2023, estimated cost $180K, described as “The scope of work includes the installation of the supplemental cooling systems for the first floor cafeteria.”
- Alteration, filed Sep 11, 2022, estimated cost $20K, described as “P.s. 079M installation of a 8189 gallon oil tank connected to a mobile boiler trailer submitting on behalf of contractor in conjunction with DOB # M00633271. No change in use, egress, or occupancy.”
- Alteration, filed Sep 8, 2022, estimated cost $5K, described as “Submitted on behalf of contractor for the installation of emergency temporary construction equipment (scaffold) 1000 sf, in conjunction with dobnow# M0063327, no change in use, occupancy or egress”
- Alteration, filed Sep 8, 2022, estimated cost $14K, described as “Submitted on behalf of contractor for the installation of emergency temporary construction equipment (shed) 100 lf, in conjunction with dobnow# M0063327, no change in use, occupancy or egress”
- Alteration, filed Sep 8, 2022, estimated cost $15K, described as “Submitted on behalf of contractor for the installation of emergency temporary construction equipment (fence) 700 lf, in conjunction with dobnow# M0063327, no change in use, occupancy or egress”
- Alteration, filed Dec 14, 2021, estimated cost $5.0M, described as “Replacing breeching,piping & climate control and chemical feed unit. provide new Ac unit in MER room. Replace lighting in the cellar.”
- Alteration, filed Jul 19, 2021, estimated cost $200K, described as “Supplemental cooling system for gymnasium provided by split system heat pumps.”

## Property taxes

- Assessment: $5,855,400
- Market value (city estimate): $13,012,000
- Taxable value: $0
- Assessed land: $1,548,000
- Assessed improvements: $4,307,400

## Zoning

R7-2: floor area ratio 1.19 built, 3.44 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.