# 170 East 121st Street, Manhattan

Other · built c. 1893 · Block 1769, Lot 45.

On Umarelli: https://umarelli.org/nyc/1017690045/170-east-121-street

More construction in Harlem: https://umarelli.org/nyc/manhattan/harlem.md

Every lot on block 1769: https://umarelli.org/nyc/manhattan/1769.md

## Building permits

- Alteration, filed Nov 8, 2025, estimated cost $200K, described as “Replace the low-pressure boiler and burner in the cellar in kind. No change to capacity. New burner to be dual fuel capable #@ oil/natural gas.”
- Alteration, filed Jan 17, 2025, estimated cost $9.3M, described as “Facade restoration with various material repairs. Repairs to rooftop parapets, bulkhead and roof. Replacement of slab on grade in basement.”
- Alteration, filed Nov 13, 2023, estimated cost $75K, described as “Filing of PAA to add Spec. Insp. in TR1: Post installed Anchors. Add in Progress Insp.: Structural-wood frame. And to remove in TR1: Wood-Seismic Resistant as it does not apply to our scope of work. System launched auto., need to remove it…”
- Alteration, filed Apr 25, 2022, estimated cost $32K, described as “Installation of temporary system scaffold as per drawings. System scaffold shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Oct 28, 2021, estimated cost $16K, described as “Installation of approximately +/- 128LF of 8'W x 16'H temporary sidewalk shed, as per plans, for public protection. No change in use, egress and occupancy.”

## Property taxes

- Assessment: $732,600
- Market value (city estimate): $1,628,000
- Taxable value: $0
- Assessed land: $228,150
- Assessed improvements: $504,450

## Zoning

R7B: floor area ratio 4.00 built, above the 3.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of The Harlem Courthouse (Individual Landmark). 9 Landmarks Preservation Commission permits are on file.

## Board and land use applications

- Harlem East Harlem Urban Renewal Plan Amendment (City Planning 2020M0408): Completed, decided Mar 2, 2021. HPD seeks an extension to the existing East Harlem Urban Renewal Plan which is set to expire in December 2020.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
