# 159 East 125th Street, Manhattan

Condominium · 233 units · built 2001 · Block 1774, Lot 7501.

On Umarelli: https://umarelli.org/nyc/1017747501/159-east-125-street

More construction in Harlem: https://umarelli.org/nyc/manhattan/harlem.md

Every lot on block 1774: https://umarelli.org/nyc/manhattan/1774.md

## Building permits

- Alteration, filed Nov 18, 2026, estimated cost $12K, described as “Remove thru wall ac unit and install new wall-mounted ductless unit and wall mounted 3 ton air cooled condensing unit. No change to occupancy, use or egress.”
- Alteration, filed Jul 29, 2026, described as “IRA to assist with Condition Assessment”
- Alteration, filed Apr 4, 2025, estimated cost $1K, described as “The purpose and end goal of this submission is in order for the boilers division/department to transfer the existing signed off boilers (filed previously under 149 East 125th Street - BIN #1087143 ) to their appropriate address and BIN. No…”
- Alteration, filed Mar 4, 2025, estimated cost $4K, described as “Erect an illuminated sign on wall.not within view of arterial highway or public park 1/2 acre or more. No change in use, egress or occupancy.”
- Alteration, filed Jan 15, 2025, estimated cost $176K, described as “Demo all heads in construction space, install temp loop. Demolition of existing plumbing fixtures and all associate piping in the space.”
- Alteration, filed Jan 15, 2025, estimated cost $600K, described as “Partially demolish existing mechanical systems, ductwork, piping, equipment, etc. As indicated on plans.”
- Alteration, filed Jan 15, 2025, estimated cost $901K, described as “Demolition of existing interior buildout and construction of new tenant demising walls with modification of existing and construction of new doors and partitions to accommodate new layout”
- Alteration, filed Jan 13, 2025, estimated cost $138K, described as “Proposed renovation at existing commercial space for an eating & drinking establishment at the first floor level. No change in use, egress and occupancy.”
- Alteration, filed Oct 16, 2024, estimated cost $8K, described as “Work to include removal of plumbing fixtures.”
- Alteration, filed Oct 16, 2024, estimated cost $125K, described as “Partial demolition of existing interior, construction of new tenant demising walls and modification of existing and construction of new doors and partitions to accommodate new layout. No change to use, egress or occupancy.”
- Alteration, filed Jun 13, 2024, estimated cost $30K, described as “Existing spk shall be demod to the existing floor control valve assembly. Tcps shall be provided during whitebox/construction of tenant space 1. Existing spk heads & branches in tenant space 2 shall be modified to upright heads for proper…”
- Alteration, filed Jun 13, 2024, estimated cost $299K, described as “General construction work including demolition for a subdivision”
- Alteration, filed Jun 12, 2024, estimated cost $40K, described as “Partially demolish existing mechanical systems, ductwork, piping and equipment and furnish & install mechanical equipment with all associated ductwork, controls and accessories as per plans”
- Alteration, filed May 29, 2024, estimated cost $4K, described as “Erect illuminated non advertising sign on wall. No change of use, egress or occupancy”
- Alteration, filed Mar 17, 2023, estimated cost $34K, described as “Bank of America Lighting upgrades as per plans prepared by Stonefield. No change to use, egress, or occupancy under this application.”
- Alteration, filed Sep 16, 2022, estimated cost $1K, described as “Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy.”
- Alteration, filed Jul 7, 2022, estimated cost $6K, described as “Erect illuminated accessory business sign on wall for citymd.”
- Alteration, filed May 19, 2022, estimated cost $30K, described as “Modifications to the existing sprinkler system, heads, and piping”
- Alteration, filed May 19, 2022, estimated cost $59K, described as “Modification of the existing plumbing system, install new fixtures and piping”
- Alteration, filed May 19, 2022, estimated cost $120K, described as “Installation of new HVAC system”
- Alteration, filed Apr 11, 2022, estimated cost $460K, described as “Interior renovation of existing commercial space, remove non-load-bearing partitions and finishes, new non-laod bearing partitions, finishes, ceiling.”
- Alteration, filed Nov 15, 2021, estimated cost $12K, described as “8481-Filing to modify existing sprinkler system in Footlocker (Space 3) displayed at 165 & 167. Relocating total of 70 heads - 15 pendent heads and 55 upright heads and associated piping as per plans . Professional Certification is…”
- Alteration, filed Jun 29, 2021, estimated cost $75K, described as “Modifications to existing mechanical systems to include installation of HVAC units as per plans submitted herewith. No change to use, occupancy or egress under this application”
- Alteration, filed Jun 22, 2021, estimated cost $170K, described as “Interior alterations to existing ground floor commercial space to include demolition and partition work as per plans submitted herewith. No change to use, occupancy or egress under this application”
- Alteration, filed Apr 19, 2021, estimated cost $3K, described as “Erect an illuminated sign on wall.not within view of arterial highway or public park 1/2 acre or more. No change in use, egress or occupancy.”

12 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1017747501/159-east-125-street.

## Building history

- New Building — Mid-Rise, filed Dec 18, 2014, signed off Sep 21, 2022, 233 units, 11 stories

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $31,238,550
- 2026–27 Tax: $960,185
- Market value (city estimate): $69,419,000
- Taxable value: $8,759,139
- Assessed land: $1,172,250
- Assessed improvements: $30,066,300
- Condo units with their own tax lots: 10

## Tax breaks

- Nonprofit exemption (hospital), with no end date, about $440,217 a year below the full tax.
- 421-a exemption, through Jun 30, 2056, about $2,057,092 a year below the full tax.
- ICAP/ICIP exemption, through Jun 30, 2028, about $145,538 a year below the full tax.

## Zoning

C4-4D: floor area ratio 5.41 built, 6.02 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- East Harlem 125th Street BID (City Planning 2025M0253): Business Improvement District, Completed, filed Nov 15, 2024. An application by the NYC Department of Small Business Services (SBS) to establish and approve a district plan for the proposed East Harlem 125th Street Business Improvement District (BID) in Community District 11, East Harlem Manhattan.…
- Harlem East Harlem Urban Renewal Plan Amendment (City Planning 2020M0408): Completed, decided Mar 2, 2021. HPD seeks an extension to the existing East Harlem Urban Renewal Plan which is set to expire in December 2020.
- East Harlem Neighborhood Rezoning (City Planning P2017M0088): Completed, decided Dec 5, 2017. The New York City Department of City Planning (DCP), together with the Department of Housing Preservation and Development (HPD), is proposing a series of land use actions -including zoning map amendments, zoning text amendments, and…

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
