# 207 East 127th Street, Manhattan

Parking · built 2004 · Block 1792, Lot 5.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/1017920005/207-east-127-street

More construction in East Harlem: https://umarelli.org/nyc/manhattan/east-harlem.md

Every lot on block 1792: https://umarelli.org/nyc/manhattan/1792.md

## Building permits

- Alteration, filed Mar 4, 2022, estimated cost $1K, described as “Installation of temporary work platform as per plan. No change in use,egress or occupancy.”
- Alteration, filed Mar 4, 2022, estimated cost $1K, described as “Installation of temporary roof protection as per plan. No change in use,egress or occupancy.”
- Alteration, filed Mar 4, 2022, described as “Installation of temporary pipe scaffold as per plan. No change in use,egress or occupancy.”
- Alteration, filed Mar 4, 2022, described as “Installation of temporary sidewalk shed as per plan. No change in use,egress or occupancy.”
- Alteration, filed Feb 18, 2022, estimated cost $35K, described as “Remove existing concrete pavement adjacent to the proposed main entrance of existing building. Furnish and install new concrete steps, ramp and metal hand railing. No change in use, egress, or occupancy in this application.”
- Alteration, filed Jan 14, 2022, estimated cost $3K, described as “Installation of temporary support of excavation filed in conjunction with the tank replacement work approved under Application No. M00599153-I1. No change to use, egress or occupancy.”
- Alteration, filed Sep 24, 2021, estimated cost $50K, described as “To install (1) new 4K gal diesel motor fuel storage tank with associated piping, (1) new diesel fuel filtration pump, and (1) new dispenser. No change in use egress and occupancy.”
- Alteration, filed May 19, 2021, estimated cost $3K, described as “Installation of roof protection”
- Alteration, filed May 17, 2021, estimated cost $6K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Livel load 300 per square feet. Sidewalk shed shall comply with chapter #33 of the 2014 code. No change in use occupancy or egress under this application.”
- Alteration, filed Nov 30, 2020, estimated cost $1K, described as “Boiler replacement in conjunction with alt i #122795485”
- Alteration, filed Nov 2, 2020, estimated cost $1K, described as “Installation of temporary construction fence application per plans filed herewith. No change to use, egress or occupancy under this application.”
- Alteration, filed Mar 22, 2018, estimated cost $26K, described as “Installation of curb cut on East 128th Street in conjunction with alt1 122795485”
- Alteration, filed Mar 21, 2018, estimated cost $45K, described as “Installation of curb cut on East 127th Street in conjunction with alt1 122795485”

## Building history

- Alteration, filed Jun 9, 2016, signed off Mar 24, 2025
- New Building — Non-residential, filed Jun 26, 2003, signed off May 1, 2009, 3 stories

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $9,714,600
- 2026–27 Tax: $613,658
- Market value (city estimate): $21,588,000
- Taxable value: $5,656,874
- Assessed land: $1,350,000
- Assessed improvements: $8,364,600

## Tax breaks

- ICAP/ICIP exemption, through Jun 30, 2031, about $361,507 a year below the full tax.

## Zoning

M3-1: floor area ratio 2.06 built, above the 2.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- East Harlem 125th Street BID (City Planning 2025M0253): Business Improvement District, Completed, filed Nov 15, 2024. An application by the NYC Department of Small Business Services (SBS) to establish and approve a district plan for the proposed East Harlem 125th Street Business Improvement District (BID) in Community District 11, East Harlem Manhattan.…
- Harlem East Harlem Urban Renewal Plan Amendment (City Planning 2020M0408): Completed, decided Mar 2, 2021. HPD seeks an extension to the existing East Harlem Urban Renewal Plan which is set to expire in December 2020.
- DSNY Proposed M11 Garage (City Planning P2016M0200): Completed, decided Sep 12, 2017. Amendment to Harlem-East Harlem Urban Renewal Plan and Site Selection/Acquisition of private property (by lease), to site and operate a new sanitation vehicle storage facility.
- HARLEM AUTO MALL (City Planning P2003M0481): Completed. 03DME015M: TO CONSTRUCT A TWO-STORY APPROXIMATELY 180,000 SQ. FT. AUTO MALL TO CONTAIN THREE SEPARATE AUTO DEALERSHIP WITH SERVICE CENTERS AND ROOFTOP STORAGE
- EAST HARLEM TRIANGLE LSRD (City Planning P1991M0225): Completed, decided Mar 8, 1994. 89-106M: CONSTR 193 UNITS OF MODERATE AND MIDDLE INCOME HOME OWNER SHIP HOUSING

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
