# 2362 1st Avenue, Manhattan

Apartment building · 1,815 units · built 1957 · Block 1808, Lot 1.

On Umarelli: https://umarelli.org/nyc/1018080001/2362-1-avenue

More construction in East Harlem: https://umarelli.org/nyc/manhattan/east-harlem.md

Every lot on block 1808: https://umarelli.org/nyc/manhattan/1808.md

## Building permits

- Alteration, filed Sep 1, 2026, described as “Ira for the vertical cable tray location inspection”
- Alteration, filed Sep 8, 2025, estimated cost $3.5M, described as “Application to be reviewed with the Development HUB. Site yard work and new 8'-0" high aluminum fence as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Sep 5, 2025, estimated cost $2.2M, described as “Application to be reviewed with the Development HUB. Site Yard work and new 8'-0" high aluminum fence as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed May 10, 2024, described as “IRA for vertical conduit inspection”
- Alteration, filed Apr 22, 2024, estimated cost $30K, described as “Excavate to prepare trench for new gas service installation. Backfill trench and restore grass or concrete pavement.”
- Alteration, filed Apr 22, 2024, estimated cost $8K, described as “Excavate to prepare trench for new gas service installation. Backfill trench and restore grass or concrete pavement.”
- Alteration, filed Apr 22, 2024, estimated cost $8K, described as “Excavate to prepare trench for new gas service installation. Backfill trench and restore grass or concrete pavement.”
- Alteration, filed Apr 22, 2024, estimated cost $10K, described as “Excavate to prepare trench for new gas service installation. Backfill trench and restore grass or concrete pavement.”
- Alteration, filed Dec 5, 2023, estimated cost $38K, described as “Dish: Installation of new telecommunication antenna sectors, GPS antenna and equipment cabinet on the roof. Installation of conduits and service room connection as per plans. All work is in compliance with 5/98. No change in use, egress or…”
- Alteration, filed Jul 18, 2023, estimated cost $120K, described as “Replacing existing underground steam and condensate return piping with new between Bldg #9 and Bldg#14 as per plans filed herewith.”
- Alteration, filed Jul 12, 2018, estimated cost $2K, described as “Replacement of at&t antennas with related rrh units on the roof. All in conformance with tppn 5/98. No change in use, egress, or occupancy.”

## Property taxes

- Assessment: $23,227,200
- Market value (city estimate): $51,616,000
- Taxable value: $0
- Assessed land: $5,849,100
- Assessed improvements: $17,378,100

## Zoning

R7-2: floor area ratio 1.07 built, 3.44 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 13 ft (NGVD29). FEMA’s preliminary map: zone X, moderate risk: a 0.2% chance of flooding each year.

## Board and land use applications

- Harlem East Harlem Urban Renewal Plan Amendment (City Planning 2020M0408): Completed, decided Mar 2, 2021. HPD seeks an extension to the existing East Harlem Urban Renewal Plan which is set to expire in December 2020.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology