# 7 Wards Island, Manhattan

Utility · Block 1819, Lot 15.

On Umarelli: https://umarelli.org/nyc/1018190015/7-wards-island

More construction in East Harlem: https://umarelli.org/nyc/manhattan/east-harlem.md

Every lot on block 1819: https://umarelli.org/nyc/manhattan/1819.md

## Building permits

- Alteration, filed Dec 16, 2025, estimated cost $12.4M, described as “Various concrete and civil work associated with electrical equipment upgrades”
- Alteration, filed Dec 16, 2025, estimated cost $210K, described as “Install duplex sump pumps in the cable compartment at Power Center 4.”
- Alteration, filed Dec 16, 2025, estimated cost $500K, described as “Installation of water heater, emergency eye wash/shower, and sump pumps.”
- Alteration, filed Dec 16, 2025, estimated cost $1.1M, described as “Expand Power Center 4 building (Building 148). Replace mechanical systems with new rooftop heating/air conditioning units. Site civil associated with expansion of building and rerouting sewer lines”
- Alteration, filed Aug 7, 2025, estimated cost $160K, described as “Plumbing work as shown on plans filed herewith.”
- Alteration, filed Feb 25, 2025, estimated cost $3.4M, described as “Dep wards island wrrf, NYC wastewater resiliency program assignment rlcy-wi-02-J21G-f-03. Remove & replace: existing conduit & wire, existing dock station 5-8, and existinng underground concrete duct banks as per plans submitted.”
- Alteration, filed Feb 25, 2025, estimated cost $2.4M, described as “Dep wards island wrrf, NYC wastewater resiliency program assignment rlcy-wi-02-J21G-f-02. Remove & replace: existing conduit & wire, existing dock station 1-4, and existinng underground concrete duct banks as per plans submitted.”
- Alteration, filed Nov 22, 2022, estimated cost $7.0M, described as “Wi-002 wards island wwrf digester gas piping replacement includes installation of new stainless-steel piping (between digester facility gas booster room and the flare tower building- ftb) as well as process valves (continue in comments)”
- Alteration, filed Nov 22, 2022, estimated cost $7.0M, described as “Wi-002 wards island wwrf diigester gas piping replacemnet includes installation of new stainless street piping (between digester facility gas booster room and flare tower building-ftb) as well as process valves.condensate removal tank…”
- Alteration, filed Jun 15, 2022, estimated cost $850K, described as “Installation of new temporary carbon steel piping (on pre-fabricated steel supports) connected to temporary skid-mounted rental gas flare. Installed piping and rental flare will be removed within one year of installation.”
- Alteration, filed Feb 25, 2022, estimated cost $26.0M, described as “Install (5) five boilers and (5) five gas burners”
- Alteration, filed Feb 24, 2022, estimated cost $1K, described as “Installation of steel pipe scaffold as per plans. No change to egress, use, or occupancy.”
- Alteration, filed Aug 10, 2021, estimated cost $2.5M, described as “Wards island digestor tanks require temporary interior scaffolding installations for interior sanding and painting. Eight (8) tanks in total. To be completed consecutively as per government contract.”
- Alteration, filed Jul 20, 2020, estimated cost $1K, described as “Installation of steel pipe scaffolding as per plans. No change in egress use or occupancy.”
- Alteration, filed Mar 30, 2020, described as “Installation of pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Feb 3, 2020, estimated cost $41.1M, described as “Structural work related to boiler plant building, multiple buildings and civil site work, as per plans filed herewith. no change to use, egress, or occupancy.”
- Alteration, filed Jan 9, 2020, estimated cost $7.6M, described as “Mechanical modifications related to the boiler plant building (package 1) as per plans filed herewith. Gas booster blowers feeding boiler and water feed to boiler makeup tank are in associated buildings on site. no change to use, egress,…”
- Alteration, filed Jan 9, 2020, estimated cost $4.4M, described as “Plumbing modifications related to boiler plant building (package 1) as per plans filed herewith. Gas booster blowers feeding boiler and water feed for boiler make-up water tank are in associated buildings on site. no change to use, egress,…”
- Alteration, filed Jan 9, 2020, estimated cost $28.5M, described as “Mechanical modifications related to multiple buildings (package 3) as per plans filed herewith. no change to use, egress, or occupancy.”
- Alteration, filed Aug 23, 2019, estimated cost $253K, described as “BIN # 1088064. Install concrete piers for flood protection devices (stop logs) at 3 exterior egress doors & 2 roll-up doors, replace concrete masonry wall with new reinforced cast-in-place concrete wall. No change to occupancy, use or…”

## Zoning

M3-1: floor area ratio 0.00 built, 2.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.