1845 Adam C Powell Blvd, Manhattan
Condominium · 46 units · built c. 1915 · Block 1822, Lot 7502.
Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.
Building permits
- Alteration, filed Jun 10, 2026, estimated cost $152K, described as “Replace two gas boilers.”
- Alteration, filed Nov 12, 2025, estimated cost $95K, described as “Proposed the replacement, repaves and layout of existing recreation area approved and sign-off under APPLICATION#120339829 sign-off 08-07-2015 for APT#21 located right below. No change in use egress or occupancy”
- Alteration, filed Oct 30, 2025, estimated cost $152K, described as “Replace two gas boilers.”
- Alteration, filed Feb 23, 2024, estimated cost $120K, described as “Proposed the replacement, repave and new layout of existing private roof terrace approved under application#103817372 signed off 9-22-2005”
- Alteration, filed Aug 4, 2022, estimated cost $130K, described as “Facade restoration including masonry brick repairs and replacement of mortar join as per plans submitted herewith no change in use, occupancy or egress.”
- Alteration, filed Jun 20, 2022, estimated cost $130K, described as “Facade restoration including masonry brick repairs and replacement of mortar join as per plans submitted herewith no change in use, occupancy or egress.”
- Alteration, filed Mar 17, 2022, estimated cost $5K, described as “Installation of 300psf sidewalk shed as per plans. Sidewalk shed shall comply with chapter # 33 of the 2014 code. No change in use occupancy or egress under this application.”
- Alteration, filed Mar 15, 2022, estimated cost $5K, described as “Installation of 300psf sidewalk shed as per plans. Sidewalk shed shall comply with chapter # 33 of the 2014 code. No change in use occupancy or egress under this application.”
- Alteration, filed Jan 27, 2022
- Alteration, filed Dec 10, 2021, estimated cost $24K, described as “Installation of new interior minisplits and exterior heat and ac heat pumps.”
- Alteration, filed Dec 12, 2020, estimated cost $1K, described as “Installation of temporary (12'-66') high pipe scaffold originating (off grade) for facade repair work as per plan. No change in use egress or occupancy,pipe scaffold shall comply with CHAPTER#33 of 2014 the ny building code.”
- Alteration, filed Oct 7, 2020, described as “Sidewalk shed installed per plans, no change in use, egress or occupancy”
- Alteration, filed Jan 10, 2020, estimated cost $5K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
Property taxes
- Assessment
- $7,734,348
- 2026–27 Tax
- $713,996
- Assessed land
- $1,135,345
- Assessed improvements
- $6,599,003
- Condo units with their own tax lots
- 48
Tax breaks
- Co-op and Condo Abatement, with no end date, a $50,026 credit this tax year.
Zoning
R7-2: floor area ratio 4.27 built, above the 3.44 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Oct 23, 2025: $1,830,000, Apt A5C
- May 24, 2022: $1,500,000, Apt B20
- Mar 17, 2022: $1,915,000, Apt B21
- Dec 10, 2021: $1,735,000, Apt A4A
- Nov 8, 2021: $4,800,000, Apt B24
- May 19, 2021: $1,700,000, Apt A5A
- Jan 30, 2020: $1,015,000, Apt A1A
- Nov 7, 2019: $1,800,000, Apt A6B
- Oct 29, 2018: $7,210,000, Apt A1C
- Apr 27, 2017: $1,685,000, Apt A1B
The 10 most recent of 12 open-market sales since 2016, from the Department of Finance’s sales files.