795 Columbus Avenue, Manhattan
Condominium · 132 units · built 2007 · Block 1833, Lot 7506.
Building permits
- Alteration, filed Nov 16, 2026, estimated cost $144K, described as “Removal and installation of interior partitions for renovation of existing accessory fitness space as per plans”
- Alteration, filed Sep 16, 2026, estimated cost $700K, described as “9044 - filing for minor interior renovations to existing retail space. work to consist of replacing floor covering, fixtures and finishes, . No change in egress use group or occupancy. Professional Cert requested.”
- Alteration, filed Sep 14, 2026, estimated cost $3K, described as “Target: Modifications to the Mechanical Systems as per plans filed herewith. No change in use, egress or occupancy. Filed in conjunction with DOB Now M01411100-I1 (GC)”
- Alteration, filed Sep 12, 2026, estimated cost $123K, described as “Target: Interior modifications to convert the former CVS space into accessory storage as per plans filed herewith. No change in use, egress or occupancy. Filed in conjunction with DOB Now M01425967-I1 (MS)”
- Alteration, filed Jul 20, 2025, estimated cost $25K, described as “Installation of heavy duty sidewalk shed. No change in use, occupancy or egress under this application, all work to comply with chapter 33 of nycbc.”
- Alteration, filed May 6, 2025, estimated cost $327K, described as “Proposed exterior facade restoration as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Apr 1, 2025, described as “Installation of outrigger for building inspection and facade repair.”
- Alteration, filed Feb 21, 2025, estimated cost $3K, described as “Removal of one (1) sink and provide shutoff valve. Remove and cap at main water line existing sanitary piping back to wall as per plans.”
- Alteration, filed Feb 21, 2025, estimated cost $34K, described as “Interior non-structural demolition of existing CVS pharmacy area within existing Target store and repair/replacement of area's finishes for future mercantile/sales.”
- Alteration, filed Jun 25, 2024, estimated cost $70K, described as “Sprinkler work in conjunction with tenant fit-out (chick-fil-a)”
- Alteration, filed Jun 25, 2024, estimated cost $45K, described as “Mechanical work in conjunction with tenant fit-out (chick-fil-a)”
- Alteration, filed Jun 21, 2024, estimated cost $900K, described as “Interior renovation of an existing demised commercial retail space for a new tenant (chick-fil-a)”
- Alteration, filed May 28, 2024, estimated cost $351, described as “Erect an illuminated business accessory blade sign. No change in use, egress, or occupancy.”
- Alteration, filed May 28, 2024, estimated cost $3K, described as “Erect an illuminated business accessory wall sign. No change in use, egress, or occupancy.”
- Alteration, filed May 23, 2024, estimated cost $100K, described as “Structural work in association with chick-fil-a fit out. Design of new slab openings, new mechanical platform & structural support of hung mechanical units”
- Alteration, filed May 23, 2024, estimated cost $275K, described as “Plumbing work in conjunctioin with chick-fil-a fit out”
- Alteration, filed Jun 7, 2021, estimated cost $800, described as “Install illuminated wall sign behind glass (bullseye)”
- Alteration, filed Jun 7, 2021, estimated cost $350, described as “Install exterior illuminated blade sign ((bullseye) target)”
- Alteration, filed Jun 7, 2021, estimated cost $350, described as “Install exterior illuminated blade sign ((bullseye) target)”
- Alteration, filed Jun 7, 2021, estimated cost $950, described as “Install exterior illuminated wall sign ((bullseye) target)”
- Alteration, filed Nov 20, 2020, estimated cost $556K, described as “Sprinkler, Installation of Temp Loop and Plumbing modifications as per plans. No change in use egress or occupancy.”
- Alteration, filed Nov 20, 2020, estimated cost $850K, described as “Mechanical modifications as per plans. no change in use, egress or occupancy”
- Alteration, filed Sep 26, 2019, estimated cost $1K, described as “Install illuminated, non flashing, accessory business sign. Wording: Bareburger.”
- No Work, filed May 14, 2019, described as “Basis independent school is hosting an open house on the 2ND fl. Terrace of the building for the parents of the students at the school. The kitchen will not be in operation anytime during the event. There will be light refreshments for th…”
- Alteration, filed Jul 5, 2017, estimated cost $22K, described as “Installation of gas line for grilles. No change of use, egress or occupancy.”
Property taxes
- Assessment
- $44,835,300
- 2026–27 Tax
- $3,047,437
- Market value (city estimate)
- $99,634,001
- Taxable value
- $25,004,552
- Assessed land
- $3,951,000
- Assessed improvements
- $40,884,300
- Condo units with their own tax lots
- 7
Tax breaks
- ICAP/ICIP exemption, through Jun 30, 2034, about $1,978,871 a year below the full tax.
Zoning
R7-2: floor area ratio 6.62 built, above the 3.44 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.