# 478 Central Park West, Manhattan

Condominium · 49 units · built c. 1910 · Block 1844, Lot 7501.

On Umarelli: https://umarelli.org/nyc/1018447501/478-central-park-west

Every lot on block 1844: https://umarelli.org/nyc/manhattan/1844.md

## Building permits

- Alteration, filed Aug 19, 2025, described as “Installation of suspended scaffold for facade work or inspection”
- Alteration, filed Aug 13, 2025, described as “Installation of suspended scaffold for facade work or inspection”
- Alteration, filed Aug 6, 2025, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Aug 6, 2025, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Aug 6, 2025, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of 2022 the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Aug 6, 2025, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of 2022 the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed May 7, 2025, estimated cost $354K, described as “Facade repair work on 1st -7th Floors and roof on all facades. For facade work only. Sidewalk shed, Pipe Scaffolding and Suspended scaffold to be filed under separate application. No change to use egress of occupancy.”
- Alteration, filed May 7, 2025, estimated cost $307K, described as “Facade repair work on 1st -7th Floors and roof on all facades. For facade work only. No change to use egress of occupancy. Sidewalk shed, Suspended Scaffold and Pipe scaffolding will be submitted under separate application.”
- Alteration, filed Feb 21, 2020, estimated cost $14K, described as “Installation of hv/ac.”
- Alteration, filed Sep 20, 2018, estimated cost $7K, described as “Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. No change in use occupancy or egress under this application. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2014 code.”
- Alteration, filed Sep 19, 2018, estimated cost $5K, described as “Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. No change in use occupancy or egress under this application. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2014 code.”

## Property taxes

- Assessment: $6,668,565
- 2026–27 tax: $654,322
- Market value (city estimate): $14,819,005
- Taxable value: $5,634,796
- Assessed land: $2,270,708
- Assessed improvements: $4,397,857
- Condo units with their own tax lots: 49

## Tax breaks

- Co-op and condo abatement, with no end date, a $46,616 credit this tax year.

## Zoning

R7-2: floor area ratio 5.37 built, above the 3.44 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Aug 31, 2026: $835,000, Apt 5C
- Jul 8, 2024: $789,144, Unit C
- Jun 7, 2024: $2,575,000, Apt 4D
- Mar 2, 2023: $2,215,000, Apt 6A
- Sep 30, 2022: $2,250,000, Apt 1A
- Jul 19, 2022: $755,000, Apt 1A
- May 26, 2022: $2,225,000, Apt 2A
- Mar 28, 2022: $625,000, Apt 1B, sold with other lots
- Feb 22, 2022: $975,000, Apt 5B
- May 28, 2021: $2,240,000, Apt 2B

The 10 most recent of 28 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
