# 122 West 97th Street, Manhattan

Apartment Building · 418 units · built 1968 · Block 1851, Lot 8.

On Umarelli: https://umarelli.org/nyc/1018510008/122-west-97-street

More construction in Upper West Side: https://umarelli.org/nyc/manhattan/upper-west-side.md

Every lot on block 1851: https://umarelli.org/nyc/manhattan/1851.md

## Building permits

- Alteration, filed Aug 19, 2026, estimated cost $81K, described as “Limited repairs of the deteriorated concrete beams and columns at the parking garage. Installation of the safety netting.”
- Alteration, filed Apr 7, 2026, estimated cost $53K, described as “Installation of new gas pipping and associated valves and appurtenances. No change in use, egress or occupancy.”
- Alteration, filed Dec 24, 2024, estimated cost $125K, described as “Alteration of existing space for new office layout”
- Alteration, filed Apr 6, 2022, estimated cost $50K, described as “Selected demolition of 4 existing windows along an interior court to be replaced with 3 new windows and 1 door+ sidelite. Selective demo of non-load bearing exterior wall for new door.construction of new metal convenience stair to interior…”
- Alteration, filed Mar 18, 2022, estimated cost $29K, described as “Modification to existing sprinkler system on the cellar and first floor to include 73 new sprinkler heads on the first floor as per plans filed herewith.”
- Alteration, filed Jan 31, 2022, estimated cost $45K, described as “Combination of apt 12D and 12E on 12TH floor as per plans filed herewith. No change in use, occupancy, or egress.”
- Alteration, filed Sep 8, 2021, estimated cost $45K, described as “Modification of apt 5H on 5TH floor as per plans filed herewith.”
- Alteration, filed Jun 15, 2021, estimated cost $4K, described as “#8464 - Plumbing modifications in existing office. No change in egress, use, or occupancy.”
- Alteration, filed Jun 15, 2021, estimated cost $21K, described as “#8464 - Ductwork modification is existing Office. No change in egress, use, or occupancy.”
- Alteration, filed Jun 15, 2021, estimated cost $175K, described as “#8464 - Interior renovation of existing office space. No change in egress, use ,or occupancy.”
- Alteration, filed Jun 15, 2021, estimated cost $21K, described as “#8464 - New HVAC distribution on Partial floor for new tenant fit-out. no change in egress, use, or occupancy.”
- Alteration, filed Jun 15, 2021, estimated cost $175K, described as “8464 - Interior renovation of existing office space. No change in egress or occupancy”
- Alteration, filed May 12, 2021, estimated cost $10K, described as “Plumbing fixtures replacement on existing roughing for apt 13B as per plans filed herewith”
- Alteration, filed May 12, 2021, estimated cost $10K, described as “Plumbing fixtures replacement on existing roughing for apt 7C as per plans filed herewith”
- Alteration, filed May 12, 2021, estimated cost $10K, described as “Plumbing fixtures in Apt 8C to be replaced on existing roughing as per plans filed herewith.”
- Alteration, filed Apr 23, 2021, estimated cost $28K, described as “Replacement of 4 units, 2 on the 1ST floor and 2 on the 1ST floor outside space with a total capacity of 8 tons. No change to egress, use, or occupancy.”
- Alteration, filed Apr 23, 2021, estimated cost $14K, described as “Replacement of two units, one on the first floor and another in an outside space with a total capacity of 4 tons. No change to egress, use, or occupancy.”
- Alteration, filed Apr 16, 2021, estimated cost $35K, described as “Modification of apartment 7C on 7th floor as per plans filed herewith.”
- Alteration, filed Apr 16, 2021, estimated cost $35K, described as “Modification of Apartment 8C on 8th floor as per plans filed herewith.”
- Alteration, filed Apr 9, 2021, estimated cost $15K, described as “Plumbing fixtures replacement on existing roughing for apt 7E, 4C, 4D & 9L as per plans filed herewith”
- Alteration, filed Apr 9, 2021, estimated cost $15K, described as “Plumbing fixtures replacement on existing roughing for apt 2B & 9L as per plans filed herewith.”
- Alteration, filed Apr 9, 2021, estimated cost $10K, described as “Plumbing fixtures in Apt 3F to be replaced on existing roughing as per plans filed herewith.”
- Alteration, filed Jan 29, 2021, estimated cost $76K, described as “Modification of apt 7E on 7TH floor, 9C on 9TH floor & combination of apt 4C & 4D on 4TH floor as per plans filed herewith.”
- Alteration, filed Dec 7, 2020, estimated cost $10K, described as “Plumbing fixtures replacement on existing roughing for apt 6F as per plans filed herewith”
- Alteration, filed Dec 7, 2020, estimated cost $15K, described as “Plumbing fixtures replacement on existing roughing for apt 7C, 8B & apt 11B as per plans filed herewith”

14 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1018510008/122-west-97-street.

## Building history

- Alteration, filed Dec 3, 2019, plan exam - disapproved, described as “Interior renovation in cellar at existing supermarket. New food prep area and new office”
- Alteration, filed Aug 29, 2019, plan exam - disapproved, described as “Renovation of the 1ST floor including layout changes, minor addition, removal and installation of partitions, doors, windows, finish work.”
- Alteration, filed Aug 28, 2019, plan exam - disapproved, units 314 to 313, described as “Renovation of the 1ST floor including layout changes, minor additions, enlargement of the connecting bridge, replacement of caretaker apt with day care. Work includes removal and installation of partitions, doors, windows, finish work.”
- Alteration, filed Jun 11, 2009, permit issued - entire job/work
- Alteration, filed May 15, 2003, plan exam - disapproved, described as “Amend existing c.o. As a result of subdi vison of improved property file under application #103395719 as per tppn #30/90. No work undr this application.”
- Major Renovation — Conversion, filed May 15, 2003, plan exam - disapproved, 291 units added, 14 stories, described as “Amend existing c.o. As a result of subdivision of improved property filed under application #103395719 as per tppn #30/92. No work under this application.”
- Alteration, filed Dec 15, 1998, plan exam - disapproved, described as “It is proposed to increase number of parking spaces,change from self parking to attended parking and modify c.of o. To indicate "transient parking" no physical work to be done under this application.”
- Major Renovation — Conversion, filed Dec 15, 1998, plan exam - disapproved, 96 units added, 14 stories, described as “It is proposed to increase number of parking spaces,change from self parking to attended parking. No physical work to be done under this application.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $25,563,600
- 2026–27 Tax: $3,179,856
- Market value (city estimate): $56,808,000
- Taxable value: $25,563,600
- Assessed land: $2,412,000
- Assessed improvements: $23,151,600

## Zoning

R9 (part of the lot is C2-8): floor area ratio 7.25 built, 7.52 allowed by base zoning.

## Recent sales

- Mar 30, 2018: $287,000,000

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- 120 W97TH PKG GARAGE (City Planning P2001M0127): Completed, decided Dec 14, 2004. 01DCP030M: SPECIAL PERMIT TO ALLOW AN INCREASE IN CAPACITY OF AN EXISTI NG 147 CAR RESIDENTIAL ACCESSORY PARKING GARAGE

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
