790 West End Avenue, Manhattan
Co-op · 89 units · built c. 1926 · Block 1870, Lot 4.
Building permits
- Alteration, filed Feb 19, 2025, estimated cost $1.0M, described as “Riser Replacement Program”
- Alteration, filed Mar 22, 2023, estimated cost $48K, described as “Interior renovation of apartment 9A inclusive of minor cosmetic changes. Plumbing work filed under separate laa application for replacement of fixtures in ext'g locations. No change to egress, use or occupancy.”
- Alteration, filed Sep 14, 2022, estimated cost $142K, described as “Replace boiler and re-install existing gas/oil burner.”
- Alteration, filed Jul 13, 2022, estimated cost $30K, described as “Propose plumbing work for apt# 14D in conjunction with gc job #M00762707. No change in use, egress, or occupancy.”
- Alteration, filed Jul 13, 2022, estimated cost $75K, described as “Propose interior renovations on APT#14D. Work includes minor partitions, and finish work as per plan. Plumbing work filed under separate application job #M00762708-I1. No change in use, egress, or occupancy.”
- Alteration, filed Jan 28, 2022, estimated cost $60K, described as “Renovation to existing apartment including partitions, bathrooms and kitchen as shown on plans. No change in use, egress or occupancy.”
- Alteration, filed Jul 31, 2020, estimated cost $5K, described as “Replacement of plumbing fixtures in kitchen to existing rough-ins.in bathroom: replacement of tub with shower, relocation of toilet, addition of sink. No change to existing bathroom footprint.no change to use, occupancy, egress, fire…”
- Alteration, filed May 1, 2018, estimated cost $4K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the NYC building code.live load 300PSF.”
Building history
- Major Renovation — Conversion, filed Feb 24, 1997, signed off Jan 8, 1998, 84 units added, 15 stories, described as “Combination of two adjacent apartments 13E and 13F. Amended certificate of occupancy to be obtained.”
- Major Renovation — Conversion, filed Nov 17, 1992, permit issued - entire job/work, 94 units added, 15 stories, described as “Combine apts 1E & 1F on 1ST flr & 9E & 9 f on 9TH flr. Obtain amended c of o.”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $10,311,300
- 2026–27 Tax
- $959,317
- Market value (city estimate)
- $22,914,000
- Taxable value
- $9,231,514
- Assessed land
- $1,350,000
- Assessed improvements
- $8,961,300
Tax breaks
- Co-op and Condo Abatement, with no end date, a $190,576 credit this tax year.
Zoning
R8: floor area ratio 12.03 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Jun 12, 2026: $555,000
- May 4, 2026: $2,107,500
- Apr 16, 2026: $589,000
- Mar 23, 2026: $2,032,000
- Sep 26, 2025: $1,750,000
- May 19, 2025: $960,000
- Aug 5, 2024: $2,695,000
- Jul 25, 2024: $340,000
- Jan 17, 2024: $2,500,000
- May 19, 2023: $580,000
The 10 most recent of 32 open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of Riverside-West End Historic District Extension II (Historic District). 36 Landmarks Preservation Commission permits are on file.