- Alteration, filed May 1, 2024, estimated cost $42K, described as “Modify existing sprinkler system for new cvs tenant space. No change in use, occupancy or egress.”
- Alteration, filed Apr 11, 2024, estimated cost $1K, described as “Illuminated non-advertising accessory wall sign - cvs pharmacy. No change of use, egress or occupancy.”
- Alteration, filed Nov 14, 2023, estimated cost $1.9M, described as “Interior renovation of ground floor commercial space as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Feb 10, 2023, estimated cost $1K, described as “This application is filed for a temp use permit for a sales office including model apartments pursuant to section ac 28 - 111 and buildings bulletin 2010- 002.”
- Alteration, filed Dec 12, 2022, estimated cost $20K, described as “Installation of construction fence as per drawings during NB cost, filed sep. Construction fence shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Oct 14, 2022, estimated cost $3K, described as “Install new emergency generator as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB #121207354.”
- Alteration, filed Jul 27, 2022, estimated cost $5K, described as “Installation of temporary support providing relief and safety during investigation and remediation of existing column 21 as per plans filed herewith. This application is related to pswo COMPLAINT#1614418.”
- Alteration, filed Jun 16, 2022, estimated cost $1K, described as “Installation of temporary material hoist as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jun 15, 2022, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 13, 2022, estimated cost $1K, described as “Installation and use of temporary material platforms as per plans filed herewith. No changed in use, egress or occupancy.”
- Alteration, filed Apr 27, 2022, estimated cost $10K, described as “Installation of dual 6427 # capacity personnel/material hoists during NB const, filed sep. Hoists shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application. Elevator application submitted…”
- Alteration, filed Apr 14, 2022, estimated cost $5K, described as “Use of temporary telehandler construction equipment as per plans filed herewith. This application is filed in conjunction with NB-121207354.”
- Alteration, filed Apr 7, 2022, estimated cost $25K, described as “Installation of heavy duty sidewalk shed during NB const, filed sep. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Apr 7, 2022, estimated cost $8K, described as “Installation of temporary roof / overhead protection at adjacent properties as per drawings during NB const, filed sep. Roof / overhead protection shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this…”
- Alteration, filed Apr 7, 2022, estimated cost $2K, described as “Use of temporary concrete placing boom construction equipment as per plans filed herewith.”
- Alteration, filed Jan 10, 2022, estimated cost $1K, described as “Install Temporary Construction Fence as per plans filed. Filed in conjunction with NB #121207354.”
- Alteration, filed Oct 27, 2021, estimated cost $2K, described as “Install combined wet standpipe and sprinkler system as per plans filed. Filed in conjunction with NB #121207354.”
- Alteration, filed Oct 5, 2021, estimated cost $5K, described as “Removal of entire sprinkler system on cellar to 5TH floor. Vacant building prior to partial building demolition. No supporting or structural elements are to be disturbed. No fire rated shafts, stairways, or corridors are to be damaged or…”
- Alteration, filed Oct 5, 2021, estimated cost $5K, described as “Removal of entire sprinkler system on cellar to 5TH floor. Vacant building prior to partial building demolition. No supporting or structural elements are to be disturbed. No fire rated shafts, stairways, or corridors are to be damaged or…”
- Alteration, filed Oct 5, 2021, estimated cost $5K, described as “Removal of entire sprinkler system on cellar to 5TH floor. Vacant building prior to partial building demolition. No supporting or structural elements are to be disturbed. No fire rated shafts, stairways, or corridors are to be damaged or…”
- Alteration, filed Sep 1, 2021, estimated cost $1K, described as “Filed herewith plans & applications for installation of a dry temporary standpipe during construction. Filed in conjunction with NB #121207354.”
- Alteration, filed Mar 31, 2020, estimated cost $1K, described as “Structural work as per plans filed. Filed in conjunction with NB #121207354.”
- Alteration, filed Mar 24, 2020, estimated cost $15K, described as “Filing application for the demo of sprinkler system for floors 2nd through Roof.”
- Alteration, filed Mar 23, 2020, estimated cost $1K, described as “Mechanical work as per plans filed. Filed in conjunction with NB #121207354.”
- Alteration, filed Mar 20, 2020, estimated cost $1K, described as “Plumbing work as per plans filed herewith. Filed in conjunction with NB #121207354”

9 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1018740043/2686-broadway.

## In the news

[The Rockwell Finishes Construction at 2688 Broadway On Manhattan’s Upper West Side](https://newyorkyimby.com/2024/04/the-rockwell-finishes-construction-at-2688-broadway-on-manhattans-upper-west-side.html), New York YIMBY, Apr 3, 2024.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology