# 2681 Broadway, Manhattan

Condominium · 345 units · built c. 1927 · Block 1874, Lot 7501.

On Umarelli: https://umarelli.org/nyc/1018747501/2681-broadway

More construction in Upper West Side: https://umarelli.org/nyc/manhattan/upper-west-side.md

Every lot on block 1874: https://umarelli.org/nyc/manhattan/1874.md

## Building permits

- Alteration, filed Jun 19, 2026, estimated cost $8K, described as “Direct treplacement of existing kitchen sink and residential cooking equipment with new fixtures installed at the same location. All existing roughing to remain. This application shall supersede all work done under application 101693437.…”
- Alteration, filed Jun 19, 2026, estimated cost $10K, described as “Application is filed for interior non structural renovation of existing apartment, as per slans submitted. This application shall supersede all work done under application 101693437. No change to use, egress or occupancy of building due to…”
- Alteration, filed Apr 10, 2026, estimated cost $25K, described as “Proposed apartment renovation. To include remodel of kitchen & bathroom as per plans.no change in use, occupancy or means of egress.”
- Alteration, filed Mar 11, 2026, estimated cost $37K, described as “Application is filed for interior non structural renovations to apartment to repair fire, smoke and water damage, as per plans submitted herewith. No change to use, egress or occupancy of building, due to the proposed work.”
- Alteration, filed Mar 11, 2026, estimated cost $20K, described as “Application is filed for plumbing work related to the non structural renovation of existing apartment to repair fire, smoke and water damage. No change to use, egress or occupancy of building is proposed due to scope of work.”
- Alteration, filed Dec 8, 2025, estimated cost $10K, described as “Filing for bathroom renovation in unit 6K as per plans. No change in use, egress or occupancy.”
- Alteration, filed Oct 6, 2025, estimated cost $36K, described as “Job filed to show renovation to Apt 9T on 9th floor as per plans filed herewith. No change in use, egress and occupancy.”
- Alteration, filed Jun 18, 2025, estimated cost $77K, described as “Cellar-interior renovations to existing commercial space-use group 6. All finishes as per plans submitted. Plumbing filed in conjunction.”
- Alteration, filed Jul 3, 2024, estimated cost $200K, described as “General Construction including minor removal of partitions, cabinetry and flooring. New partition, dropped ceilings cabinetry and finishes as per plans filed. No change to Use, Occupany or Egress”
- Alteration, filed Jul 3, 2024, estimated cost $50K, described as “Plumbing work including Capped& Removed, New, Replaced and Relocated plumbing fixtures with associated supply and drain work as per plans filed. No change to Use, Occupancy or Egress.”
- Alteration, filed Dec 12, 2023, estimated cost $45K, described as “Remove existing fixtures. Replace and relocate new fixtures per diagram. As per plans filed herewith. No change of use, occupancy, egress, or zoning in this application”
- Alteration, filed Dec 12, 2023, estimated cost $85K, described as “Demolish minor partitions. Construct new partitions and new finishes. No change of use, occupancy, egress, or zoning in this application”
- Alteration, filed Oct 18, 2023, estimated cost $280K, described as “Hereby filing general construction work to renovate unit 11I on the 11TH floor as per plans. Related plumbing work to be filed separately.”
- Alteration, filed Oct 18, 2023, estimated cost $40K, described as “Hereby filing plumbing work to unit 11I on 11TH floor as per plans.”
- Alteration, filed Sep 29, 2023, estimated cost $350K, described as “Filing herewith application for mechanical systems modifications as per plans submitted.”
- Alteration, filed Aug 1, 2023, estimated cost $123K, described as “Pergola installation. No change in use, egress, or occupancy.”
- Alteration, filed Jul 25, 2023, estimated cost $25K, described as “Pergola Footing installation project on roof. No change in use, egress, or occupancy.”
- Alteration, filed Mar 31, 2023, estimated cost $2K, described as “Installation of a 8Ft plywood fence”
- Alteration, filed Oct 10, 2022, estimated cost $49K, described as “Installation and modification of plumbing fixtures at existing apartment #8I/J on floor 008. Plumbing work. There is to be no change of use, occupancy, or egress.”
- Alteration, filed Oct 10, 2022, estimated cost $148K, described as “Renovation of existing apartment #8I/J on floor 008. Architectural work. There is to be no change of use, occupancy, or egress.”
- Alteration, filed Sep 12, 2022, estimated cost $100K, described as “Kitchen renovation and minor refinishing of existing apartment”
- Alteration, filed Aug 16, 2022, estimated cost $5K, described as “PAA to reflect current site condition”
- Alteration, filed Mar 30, 2022, estimated cost $156K, described as “West Courtyard Repairs. No change to use, egress, or occupancy”
- Alteration, filed Mar 18, 2022, estimated cost $12K, described as “Plumbing work on 15th fl- Renovation of Apt 15 N per plans including renovated kitchen, 2 full bathrooms, laundry in conjunction with ot # M00700298-I1”
- Alteration, filed Mar 18, 2022, estimated cost $42K, described as “Interior work on 15th fl- Renovation of Apt 15 N per plans including renovated kitchen, 2 full bathrooms, laundry closet, new non-load bearing interior partitions, doors, and new leveled floor and ceiling and new finishes throughout. pl…”

6 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1018747501/2681-broadway.

## Property taxes

- Assessment: $21,503,250
- 2026–27 tax: $2,118,179
- Market value (city estimate): $47,785,000
- Taxable value: $19,212,415
- Assessed land: $1,219,050
- Assessed improvements: $20,284,200
- Condo units with their own tax lots: 2

## Zoning

R9A (part of the lot is R8B): floor area ratio 14.41 built, above the 7.52 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Sep 17, 2026: $760,000
- Aug 20, 2026: $665,000
- Aug 13, 2026: $350,000
- Jul 13, 2026: $427,000
- Jun 12, 2026: $365,000
- Jun 9, 2026: $340,000
- Nov 10, 2025: $382,000
- Oct 28, 2025: $430,000
- Oct 14, 2025: $824,500
- Aug 19, 2025: $1,385,000

The 10 most recent of 137 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- STARBUCKS COFFEE CO. NO.856 (City Planning P1999M0556): Completed, decided Mar 30, 1999. RENEWAL-UNENCLOSED SIDEWALK WITH 16 SEATS FOR 5-YEARS
- STARBUCKS COFFEE COMPANY (City Planning P1998M0635): Completed, decided May 7, 1998. RENEWAL-UNENCLOSED SIDEWALK CAFE WITH 16 SEATS FOR 5-YEARS
- STARBUCKS COFFEE COMPANY (City Planning P1996M0640): Completed, decided Jun 26, 1996. NEW-UNENCLOSED SIDEWALK CAFE WITH 16 SEATS

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
