520 Cathedral Parkway, Manhattan
Condominium · 36 units · built c. 1911 · Block 1881, Lot 7502.
Building permits
- Alteration, filed Nov 19, 2026, described as “File material hoist.”
- Alteration, filed Oct 15, 2026, estimated cost $12K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Oct 5, 2026, estimated cost $308K, described as “Herewith filing for roof replacement as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jun 2, 2025, estimated cost $27K, described as “Plumbing work related to the renovation of apartment 12C on the 12th floor.”
- Alteration, filed Jun 2, 2025, estimated cost $103K, described as “Modification to interior partitions along with related general construction related to the renovation of apartment 12C on the 12th floor.”
- Alteration, filed Dec 21, 2023, estimated cost $46K, described as “Renovate existing apartment; partitions, flooring, cabinetry, counters, doors, ceiling, fixtures & finishes. No change in use, egress or occupancy”
- Alteration, filed Dec 21, 2023, estimated cost $14K, described as “Plumbing work in apartment #1A in conjunction with apartment renovation filed in DOB now under JOB#M00948848. No change in use, egress or occupancy.”
- Alteration, filed Jul 3, 2023, estimated cost $30K, described as “The purpose of the job is to combine two apartments into one.”
- Alteration, filed Jul 3, 2023, estimated cost $30K, described as “The job is combining two apartments into one.”
- Alteration, filed May 23, 2023, estimated cost $500K, described as “Combination of apartments 7A/7B. Interior renovation. Combined apartment will comply with tppn 03/97. No change to use, egress, or occupancy.”
- Alteration, filed Apr 27, 2021, estimated cost $325K, described as “Facade repair”
- Alteration, filed Oct 22, 2020, estimated cost $6K, described as “Installation of a temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
Property taxes
- Assessment
- $6,068,704
- 2026–27 tax
- $594,654
- Market value (city estimate)
- $13,485,997
- Taxable value
- $5,586,589
- Assessed land
- $574,649
- Assessed improvements
- $5,494,055
- Condo units with their own tax lots
- 36
Tax breaks
- Co-op and condo abatement, with no end date, a $100,788 credit this tax year.
Zoning
R8: floor area ratio 6.58 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Sep 29, 2025: $1,710,000, Apt 4C
- Mar 12, 2025: $1,525,000, Apt 12C
- Jul 24, 2024: $1,250,000, Apt 2A
- Aug 5, 2022: $1,222,918, Apt 7B
- Jun 28, 2021: $1,475,000, Apt 3C
- Jan 10, 2019: $2,100,000, Apt 1C
- Jun 22, 2017: $1,585,000, Apt 3A
- Jan 9, 2017: $1,562,500, Apt 5A
- Nov 3, 2016: $1,580,000, Apt 11C
- Jan 14, 2016: $2,069,000, Apt 7A
Open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of Morningside Heights Historic District (Historic District). 12 Landmarks Preservation Commission permits are on file.
Board and land use applications
- Morningside Heights Historic District (City Planning P2017M0298): Completed, decided May 30, 2017. Landmark Preservation Commission designation of the Morningside Heights Historic District.