2900 Broadway, Manhattan
Condominium · built 2000 · Block 1885, Lot 7501.
Building permits
- Alteration, filed Nov 2, 2023, estimated cost $231K, described as “Removal and replacement of existing 14th floor roof,”
- Alteration, filed Apr 19, 2023, estimated cost $1.3M, described as “Modifications to existing plumbing / sprinkler systems from floors 3 to 13”
- Alteration, filed Apr 18, 2023, estimated cost $400K, described as “Modifications to existing interior ductwork”
- Alteration, filed Apr 18, 2023, estimated cost $1.1M, described as “Interior renovations to bathrooms on floors 3 to 13”
- Alteration, filed Mar 17, 2022, estimated cost $173K, described as “Brick repairs at relieving angles and precast concrete repairs at facade.”
- Alteration, filed Aug 23, 2021, estimated cost $5K, described as “Installation of 300 psf sidewalk shed as per plans. Sidewalk shed shall comply with chapter #33 of the 2014 code. No change inuse, egress or occupancy under this application.”
Property taxes
- Assessment
- $13,728,557
- 2026–27 tax
- $61,959
- Market value (city estimate)
- $30,507,904
- Taxable value
- $571,152
- Assessed land
- $1,016,550
- Assessed improvements
- $12,712,007
- Condo units with their own tax lots
- 2
Tax breaks
- Nonprofit exemption (faculty and student housing), with no end date, about $54,017 a year below the full tax.
- Nonprofit exemption (museum), with no end date, about $1,035,007 a year below the full tax.
Zoning
R8: floor area ratio 8.94 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- Variance or special permit (Board of Standards and Appeals 15-98-BZ): Variance or special permit, Granted, filed Jan 29, 1998, decided May 27, 1998. Variance (§72-21) to permit, in an C 1-4 and R8 zoning district, the proposed erection of a fourteen (14) story residential building with retail on the street level which creates non-compliance with regard to the height and setback…
- NY LIBRARY & COLUMBIA UNIV. HALL (City Planning P1998M0156): Completed, decided Jun 9, 1998. 97HPD010M: LDA FOR NY PUBLIC LIBRARY & COLUMBIA UNIVERSITY HALL