# 306 West 97th Street, Manhattan

Condominium · 61 units · built c. 1901 · Block 1887, Lot 7501.

On Umarelli: https://umarelli.org/nyc/1018877501/306-west-97-street

More construction in Upper West Side: https://umarelli.org/nyc/manhattan/upper-west-side.md

Every lot on block 1887: https://umarelli.org/nyc/manhattan/1887.md

## Building permits

- Alteration, filed Sep 15, 2026, estimated cost $44K, described as “Interior renovations for apartment 6 combination as per plans filed herewith. No change to use, egress or occupancy”
- Alteration, filed Aug 14, 2026, estimated cost $107K, described as “Interior renovation for apt 71 as per plans filed herewith. No change to use, egress or occupancy”
- Alteration, filed Apr 29, 2026, estimated cost $23K, described as “Interior renovation”
- Alteration, filed Oct 3, 2024, estimated cost $120K, described as “Apt 53: Interior partitions and finishes as per plans filed herewith. No change to use, egress or occupancy”
- Alteration, filed Mar 27, 2024, estimated cost $20K, described as “Plumbing fixtures installation and associated piping for apartment 51 as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Mar 27, 2024, estimated cost $50K, described as “Interior apartment renovation consisting of partitions & finishes as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Feb 8, 2023, estimated cost $5K, described as “Installation of 72' new sidewalk shed at 312 w 97 th as indicated on plans. There will be no change in the use, egress, or occupancy under this application”
- Alteration, filed Feb 8, 2023, estimated cost $5K, described as “Installation of 143' new sidewalk shed at 306 west 97 th street as indicated on plans. There will be no change in the use, egress, or occupancy under this application”
- Alteration, filed Dec 7, 2022, estimated cost $27K, described as “Filing for Cycle 8B FISP repairs. No change to use, egress or occupancy under this application.”
- Alteration, filed Dec 7, 2022, estimated cost $23K, described as “Filing for Cycle 8B FISP repairs. No change to use, egress or occupancy under this application.”
- Alteration, filed Sep 22, 2021, estimated cost $25K, described as “Related plumbing work for residential apartment renovation at unit #44. no change to use, egress or occupancy under this application.”
- Alteration, filed Sep 22, 2021, estimated cost $45K, described as “Interior apartment renovation at existing residential unit #44. Partition, finish and fixture work. No change to use, egress, or occupancy.”
- Alteration, filed Sep 9, 2021, estimated cost $25K, described as “Plumbing fixture work for residential apartment renovation at unit#22. No change to use, egress or occupancy.”
- Alteration, filed Sep 9, 2021, estimated cost $45K, described as “Interior apartment renovation at existing residential unit #22. Partition, finish and fixture work. No change to use, egress, or occupancy.”

## Property taxes

- Assessment: $7,258,953
- 2026–27 Tax: $674,625
- Market value (city estimate): $16,130,996
- Taxable value: $5,430,445
- Assessed land: $900,000
- Assessed improvements: $6,358,953
- Condo units with their own tax lots: 61

## Tax breaks

- J-51 exemption, through Jun 30, 2027, about $106,777 a year below the full tax.

## Zoning

R8: floor area ratio 5.19 built, 6.02 allowed by base zoning.

## Recent sales

- Jul 27, 2026: $300,000, Apt 6
- Jul 10, 2026: $1,515,000, Apt 53
- Mar 31, 2026: $1,535,000, Apt 72
- Dec 18, 2025: $1,500,000, Apt 64
- May 19, 2025: $1,565,000, Apt 33
- Mar 10, 2025: $1,640,000, Apt 51
- Aug 30, 2023: $1,495,000, Apt 61
- Jul 28, 2023: $1,500,000, Apt 22
- Jul 19, 2023: $1,412,500, Apt 34
- May 5, 2023: $1,649,000, Apt 44

The 10 most recent of 19 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of Riverside-West End Historic District Extension II (Historic District). 27 Landmarks Preservation Commission permits are on file.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
